Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

2503-45382 SRA

Attachment 1—Changed conditions to be imposed

 

 

No. | Conditions Condition timing
Material change of use

10.9.4.2.4.1 — Material change of use near a State transport corridor—The chief executive administering
the Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads to
be the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:

 

 

 

1. (a) Road access is located generally in accordance with the Site Atall times
Master Plan prepared by Covey Associates Pty Ltd, dated 13 Feb
2025, reference 244035, Issue A, as amended in red by SARA on
13 November 2025.

(b) The road access (at the road access location) comprises of a
Rural Property Access Type C sealed to the property boundary
with a 6m throat, Auxiliary Left Turn Treatment (AUL) and
Channelised Right Tum Treatment (CHR).

(c) The road access, referred to in part (b) of this condition, must be

maintained in accordance with:

i) the Department of Transport and Main Roads’ Standard
Drawing 1807, Rural Property Access Type C

(i) the Department of Transport and Main Roads’ Road
Planning and Design Manual, 2nd Edition

(ii) the Department of Transport and Main Roads’ Policies and
Technical Specifications

(iv) the Department of Transport and Main Roads’ Standard
Drawings Roads, and

(v) relevant local government requirements.

2. Carry out the stormwater management of the development generally in | At all times
accordance with ‘Stormwater Quantity’ of the Stormwater Management
Plan, prepared by Covey Associates Pty Ltd, dated Feb 2025,
reference M25-0042Rpt, Issue A, as amended in red by SARA dated
13 November 2025.

10.3.4.3.1 — Material change of use that involves clearing native vegetation—The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of Natural
Resources and Mines, Manufacturing and Regional and Rural Development to be the enforcement
authority for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:

3. Clearing of native vegetation associated with the material change of Atall times
use must not occur within Area B (B1-B6), as shown on:

* Vegetation Management Plan, prepared by the Queensland
Government, reference VMP 2503-45382 SRA, sheet 1 of 1,
version 4 2. and

* Attachment: 2503-45382 SRA Derived GPS Reference Points,
prepared by the Queensland Government

4. Built infrastructure associated with the Material Change of Use, other Atall times
than for fences, roads, underground services must not be established,
constructed or located within Area C (C1-G45) as shown on:

* Vegetation Management Plan, prepared by the Queensland
Government, reference VMP 2503-45382 SRA, sheet 1 of 1,
version 42, and

* Attachment: 2503-45382 SRA Derived GPS Reference Points,

 

 

 

 

 

 

 

 

 

 

 

State Assessment and Referral Agency Page 3 of 8

Document Set ID: 24377726 Page 44 of 72

Version: 13, Version Date: 23/12/2025
Log in to download the original file

Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published).pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.