Original source · versioned page text
Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)
STORMWATER MANAGEMENT PLAN Client: Noosa Shire Council Location: Doonan CONTENTS 1.0 INTRODUCTION 2.0 SITE DESCRIPTION 24 22 2.3 Site Location Existing Land-use, Topography and Drainage Proposed Land-use 4.0 STORMWATER QUALITY 41 42 43 44 Water Quality Monitoring 4.1.1 Treatable Areas 4.1.2 Scenario Method MUSIC Model Parameters Proposed Stormwater Treatment Train MUSIC Modelling Results 5.0 MAINTENANCE PERIOD 5.1 Bioretention Basins 5.1.1 ‘Construction Period’ Maintenance Requirements 5.1.2 ‘Maintenance Period’ Maintenance Requirements 5.1.3 ‘Operational Period’ Maintenance Requirements 6.0 CONCLUSION 7.0 REFERENCES 10 10 10 10 10 11 Document Set ID: 24377726 Version: 13, Version Date: 23/12/2025 Project No: 244035 M25-0042 Rpt Issue A Page 54 of 72
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.