Other Change Decision Notice - Council Meeting Decision 132005 638 04 (As Published)
and always maintained at the waste management facility site office.
37. Certification must be submitted to Council from a qualified person* which certifies that
the development has been undertaken and constructed in accordance with the bushfire
management conditions of this Decision Notice.
*(Refer to Advisory Note)
38. A review and certification of the Bushfire Management Plan is required every 5 years to
ensure its currency and must be submitted to Council from a qualified person*.
*(Refer to Advisory Note)
Environmental covenant
39. A vegetation protection covenant must be registered against the title/s of the property
over the area identified as the 1.8ha Proposed Offset Planting Area as shown on the
Approved Plans pursuant to Section 97A of the Land Title Act 1994. The covenant
document and a survey plan must be submitted to Council for endorsement prior to
lodgement with the relevant titles authority for registration of title. The covenant
document must:
a. incorporate the requirements of this Decision Notice
b. include Noosa Council as Covenantee reference Queensland Land Title Registry
Standard Terms Document No. 715597513.
40. The vegetation protection covenant document must be registered with the titles office
before the commencement of the use of the expanded Resource Recovery Area.
ENGINEERING
Earthworks and Retaining Walls
41. All fill and associated batters must be contained entirely within the approved use area
and must be designed and certified by a suitably qualified person.
Acid Sulfate Soils
42. An Acid Sulfate Soils Investigation Report must be prepared to mitigate the risk of acid
sulfate soils on the adjacent bushland /wetland areas.
All requirements and recommendations of the Acid Sulfate Soils Investigation Report
must be certified by a suitably qualified person*.
*(Refer to Advisory Note)
STORMWATER
43. Prior to the construction of the pad area for the expansion of the Resource Recovery
Area (RRA) and the relocation of the HES basin, provide an updated SWMP, which is
based on the Covey’s Stormwater Management Plan (M25-0042Rpt, Issue A) dated
February 2025 and which addresses the following:
a. Specify the final HES basin detail from the range of options presented in the report,
including consideration of whether a Type-B HES basin may present a lower-risk
option compared to the flap-gated arrangement proposed to prevent back-flows
into the Type-A arrangement as currently proposed;
b. Include all details for the sizing and proposed levels of the HES basin within the
body of the report, based on recent detailed survey at the point of discharge and
downstream; and
c. Include construction-phase erosion and sediment control plans which document
how the transition from the current HES basin location to the ultimate location
(including filling for the RRA pad) will be achieved.
Page 6 of 72
Document Set ID: 24377726
Version: 13, Version Date: 23/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.