Dear Sir,

Re: Application 07/0738 for a Development Permit for an Industrial Business
    Type 1 (Warehouse) & Type 2 (Production, alteration, repackaging &
    repairing) situated at 64 Gateway Drive, Noosaville described as Lot 13
    SP170295

I refer to the above application for an Industrial Business Type 1 (Warehouse) & Type 2
(Production, alteration, repackaging & repairing) and wish to advise that following
preliminary examination of the plans, the following information is required to be
submitted:-

Land Use

1.      Please indicate waste storage areas on plans and further detail how the proposal
        complies with the Specific Outcome O13 of the Business Uses Code.

2.      It is considered that a development of this scale, with a number of smaller
        units/tenancies may generate traffic and parking demand that exceeds the
        minimum Vehicle Parking Requirements detailed in the Driveways and
        Carparking Code. Please provide a carparking and traffic generation report
        prepared by a suitably qualified person to address the requirements of Specific
        Outcome O9 of the Code. In this regard, it may be necessary to amend the plans
        to provide additional carparking spaces and/or reduced floor areas of the
        development.

3.      Please provide amended floor plans indicating end-of-trip facilities in accordance
        with Probable Solution S15.3 of the Driveways and Carparking Code.

4.      Please provide a noise and lighting assessment report prepared by a suitably
        qualified person to address the acoustic and lighting amenity issues raised in the
        Business Uses Code (specifically Outcomes O3 and O11) with respect to the
        residential areas to the west of the site and any noise attenuation measures that
        may be necessary.

        The acoustic report shall assess all potential noise sources and demonstrate how
        the development will not cause –


     Award Winner - Australian Clean Beach
       Challenge 2004 Litter Prevention
Full text of the other 6 pages

Page 2

                Excessive noise under Council’s Local Law No. 12 – Control of
                 Nuisances.

                Unlawful environmental nuisance under the Environmental Protection
                 Regulation 1998.

        It is noted that the existing development approval for the site (23074DA) involved
        a report of this nature, prepared by Cardno MBK (Qld) Pty Ltd, and this may be
        revised for the new proposal.

5.      It is noted that the development is adjacent to bushfire hazard and areas mapped
        in The Noosa Plan and includes signicant buildings between these areas and the
        access/egress provided via Gateway Drive.             Please provide a bushfire
        management report for the site prepared by a suitably qualified person and
        include any necessary recommendations on amended plans.

Land Development

6.      Please provide a detailed survey plan, prepared by a licensed land surveyor, of
        all existing features on site and on land adjacent to the site, such as any services
        (including their alignment, size, depth, invert level, etc) vegetation, topography of
        the land (contours) and any other relevant information. All level information shall
        be to the Australian Height Datum (AHD).
        Existing services that run through the site (including any easements) and existing
        vegetation to be retained should all be shown on the amended proposal plans.
        Where existing services are to be extended or new services are to be provided
        within the site, they should also be shown on the proposal plan to ensure that the
        proposed buildings do not conflict with such services.
7.      Demonstrate that the car park area (including all car park spaces, manoeuvring
        areas, and driveways) comply with Australian Standard AS2890.1 – Off-street
        Car Parking. Some issues to be addressed include:

        7.1. Demonstrate that adequate sight lines are available to and from Gateway
             Drive and internal to the site in accordance with section 3.2.4 of AS2890.1

        7.2. Demonstrating that a vehicle queue length on all driveways of at least 12m
             is provided (measured from the Gateway Drive property boundary into the
             site) whereby no parking spaces or manoeuvring areas are permitted in
             order to allow the free influx of traffic in accordance with section 3.4 of
             AS2890.1.

        7.3. Demonstrate that the car park will be suitable to cater for pedestrians. In
             this regard specific attention needs to be given to section 4.1 of AS2890.1.

        7.4. Demonstrate how it is intended to control vehicle speeds internal to the site
             given the long straight circulation aisles. In this regard speed humps or
             other similar devices may be necessary.




     Award Winner - Australian Clean Beach
       Challenge 2004 Litter Prevention

Page 3

        7.5. Demonstrate how safe pedestrian access is proposed to each of the
             Industrial Units, as the entrances to most of the proposed units is presently
             proposed directly off the main circulation aisle. The present proposal raises
             safety concerns and the applicant will need to provide a means of
             separating pedestrian and vehicle safety to avoid any conflicts between the
             two.
              In this regard a 1.5m wide walkway, raised above the level of the circulating
              road, may be required to the frontage of all of the Industrial Units to ensure
              adequate separation between pedestrians and circulating traffic, and to
              allow pedestrian friendly access to the proposed buildings.

              Provision of landscaping elements to the frontages of the industrial units
              should also be incorporated to soften the building façade, to create interest,
              and to assist in reducing vehicle speeds on the circulating aisle.
        7.6. To prevent vehicles from encroaching over proposed landscaped areas,
             wheel stops will be necessary to most of the proposed car parking spaces
             and these wheel stops should be shown on the amended proposal plan.

        7.7. Staff car park spaces on a development of this scale, with 44 different
             Units/tenancies, is inappropriate and will not function adequately. In
             accordance with AS2890.1, staff car parks cannot be intermingled across
             the development but instead need to be kept together if they are to work
             properly. This however will be difficult to achieve in practice on this
             development due to the size of the site. As such all spaces on site should
             be sized as standard spaces 2.6m wide x 5.4m long, unless the space is
             obstructed by an adjacent wall or fence, in which case the space will need
             to be at least 300mm wider to allow access and room for car doors to open.

        7.8. Provide at least 4-disabled carpark spaces (evenly distributed across the
             development to maximises their usage) each with a minimum dimension of
             3.2m wide x 5.4m long.

8.      Demonstrate that the car park area (including all loading areas, manoeuvring
        areas, and driveways) comply with Australian Standard AS2890.2 – Commercial
        Vehicle Facilities. The issues addressed shall include:

        8.1. Demonstrate that a 19m-semi trailer is capable of entering and leaving the
             site in a forward gear with provision for such vehicle to be safely parked for
             loading and/or unloading without restricting the operation of the industrial
             facility. In this regard a designated semi trailer loading area needs to be
             provided and this should be shown on the amended proposal plans along
             with the swept path of this vehicle.

        8.2. Demonstrate how it is intended to safely load and unload all trucks and
             commercial vehicles, as there is concerned that these activities occurring in
             a common area could other users of the site at risk. In this regard, it may
             be necessary to provide additional loading bays to adequately serve the
             site.




     Award Winner - Australian Clean Beach
       Challenge 2004 Litter Prevention

Page 4

9.      Demonstrate that adequate sight lines are available to all proposed pathways,
        with consideration given to cyclists who will be travelling at higher speeds than
        pedestrians and therefore will require greater sight distances. In this regard the
        positioning and alignment of the pathway between Units 10 & 11 (and linking to
        the Gateway Drive cul-de-sac) is considered dangerous in a number of different
        ways and will need to be reviewed.

10.     A 2m wide pathway should be provided around the cul-de-sac frontage of the
        development and this should be shown on the amended proposal plans.

11.     Illustrate the proposed finished floor levels of the proposed building and car
        parking areas on the plans and elevations. Also provide a series of sections
        through the site to demonstrate the relationship between the natural landform
        and the proposed industrial development.

12.     Indicate on the proposal plans the extent of cut/fill earthworks anticipated for the
        proposed development (including the extent of any batters and/or retaining walls)
        and provide an estimate of the volume of earthworks likely to occur in order to
        develop the site as proposed.

13.     Illustrate on the proposal plan any retaining walls that may be necessary to
        support any fill material placed on site and also indicate the height of these
        retaining walls. An indication of the type of retaining walls to be constructed
        should also be given.

14.     Demonstrate that each industrial unit will be capable of draining all effluent waste
        by gravity means to Council’s sewerage reticulation network (i.e. without the need
        for pumps).

15.     Demonstrate how internal access for maintenance purposes (by the owner and/or
        Council) will be given to the southeast corner of the site where at least part of the
        development will need to be connected to sewer. In this regard the proposal
        does not provide access to this part of the site due to existing developments,
        likely future developments, and due to extensive vegetation in this area. To this
        end it is noted that the previous approval over the site (23704DA) had proposed
        a carparking area in this part of the site and as such access would be more
        readily available by the owner and/or Council if needed.
        In this regard, an access may need to be provided between Units 29 & 30 or
        alternatively have Unit 29 setback sufficiently from the eastern boundary to allow
        access past the building and to the south east corner of the site.
16.     Illustrate on the proposal plans the location of the electrical substation and the
        location of the fire hydrant booster boxes that are likely to be required in order to
        serve the proposed development, with consideration given to how maintenance
        and/or emergency vehicle access to these services will be obtained.

17.     Provide certification from a Registered Professional Engineer Queensland
        demonstrating that each industrial unit will be above the estimated 1 in 100 year
        Average Recurrence Interval design storm (Q100). In this regard it is likely that
        the rear of the site will be subject to flooding from the Noosa River and Lake
        Doonella.




     Award Winner - Australian Clean Beach
       Challenge 2004 Litter Prevention

Page 5

18.   All existing drainage flow paths that enter the site, whether overland or within a
      pipe, shall be accepted and safely carried through the site. In this regard
      Gateway Drive will act as an overland flow path in a major storm event and due
      to the grade of this road stormwater runoff will be directed into and across the
      subject site towards Lake Doonella at the rear. This overland flow will therefore
      need to be taken into consideration with the design of the industrial development
      and an appropriately sized flow path provided through the site to safely carry this
      volume of water past the Industrial Units.
      As such, please arrange a Registered Professional Engineer Queensland to
      design the overland flow path through the site, with consideration given to the
      actual drainage catchment and the future development potential for the area that
      will see further industrial developments and a likely increase in runoff.
      This overland flow path will need to be shown on the proposal plans for Council
      to review and ascertain the level of impact.
19.   Demonstrate how the site is proposed to be drained such that there is no impact
      to any of the adjacent land and no increase in run-off for storm events up to and
      including a 1 in 100 year Average Recurrence Interval design storm (Q100).
      Consideration will also need to be given to the likely contaminants that could be
      expected off an industrial site and to erosion caused by concentrated flows that
      scour the natural landform. It is noted that the present proposal does not give an
      indication of the extent of scour that could occur nor the measures that will be
      necessary to avoid the affects of scouring.

20.   On review of the Stormwater Quality Management & Assessment Report by
      Callaghan & Toth it is noted that a number of different devices are proposed to
      manage and treat stormwater runoff. In this regard please indicate on the
      Architectural plans these devices (i.e. once they have been correctly sized to
      cater for the Q100 flow), particularly when they are proposed to be located above
      ground (such as rainwater tanks), as Council will need to review the devices in
      context with the proposed buildings and carpark. As such the Architectural plans
      and elevations will need to be reviewed.

21.   Please provide a detailed Traffic Report assessing the impacts of the proposed
      development and making recommendations as to the level of upgrading works
      that may be necessary to the road network to cater for the development. Traffic
      generation rates should be based on a worst-case scenario for the actual Uses
      proposed (including the Café and Outdoor Dining Area particularly if that is what
      is going to be ultimately proposed by the applicant).

22.   Please submit a copy of the Environmental Management Plan for the site, and
      incorporate the relevant aspects of the Acid Sulphate Soil Report, the Stormwater
      Quality Management & Assessment Report, the Ecological Assessment Report,
      the Traffic Report, and any other site-specific reports.

23.   It is noted that some of the outcomes proposed and recommended by the various
      reports submitted with the proposal are in conflict with one another. In this regard
      each individual consultant should be given copies of the other consultants reports
      to review and to ensure that they each have a workable and consistent approach
      to developing the site. The applicant should then review the various reports to
      ensure consistency prior to resubmitting the amended reports to Council.




  Award Winner - Australian Clean Beach
    Challenge 2004 Litter Prevention

Page 6

Environmental Services / Works

24.   It is requested that further discussions are held with Council to confirm an
      appropriate layout for the bicycle path any fire fighting access path necessary to
      protect the development. Appropriate connectivity is also required with other
      development currently being assessed in the area.

Environmental Health

25.   Please submit a Waste Management Plan (Operational) in accordance with
      Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
      Commercial and Industrial Premises”, for the day-to-day operation of the
      development.
      It is critical that waste areas are properly planned. A copy of Planning Scheme
      Policy No. 9 explaining exactly how to predict waste quantities and design waste
      areas is available from Council or online. The Plan shall include the following
      information: -
         The types of waste that will be generated from the activities approved within
          the development.

         Estimated volumes or tonnage of both recyclables and waste generated.

         Methods to be used for dealing with garden waste.

         Initiatives to minimize waste either by waste prevention, reduction, re-use or
          recycling.

         Description of procedures for getting all waste to the bins; the storage of bins
          and the collection of bins by the contractor.

         A description of the design details of waste storage and recycling areas
          including size, location, elevation and floor plan, methods of bin washing and
          system to prevent storm water getting into sewer via the bin wash.

         A description of types and volume of waste storage containers to be used.

         The waste and recycling storage area shall include the provision of containers
          for all waste and recycling materials including putresable matter, non-
          recycling waste, paper/ cardboard, glass, aluminum/steel cans, waste oil,
          styrofoam boxes, etc, and bin washing facilities connected to sewer.

         A detailed description of vehicular access to collect waste. Where collection
          is off street, access must allow vehicles to enter and leave the site in a
          forward direction.

26.   The application has not addressed the typical uses that may be anticipated, and
      hence has not allowed for associated infrastructure, vehicle wash down bays,
      sound-proof walls, grease traps etc. Given the difficulty in retrofitting such
      infrastructure consideration should be given to their provision at this stage.
Please provide six (6) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.



  Award Winner - Australian Clean Beach
    Challenge 2004 Litter Prevention

Page 7

Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.
Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this Information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-

1.      all of the information requested; or

2.      part of the information requested together with a letter asking the assessment
        manager and each referral agency to proceed with the assessment of the
        application; or

3.      a letter:-

        3.1. stating that you do not intend to supply any of the information requested;
             and

        3.2. asking the assessment manager and each referral agency to proceed with
             the assessment of the application.
The above information is required to be submitted, prior to assessment of the
application. If any further matters arise as part of assessment of this application, you
will be advised accordingly.

Should you have any further queries in relation to the above, please do not hesitate to
contact me on the above number.

Yours faithfully,



Denis Wallace
ASSISTANT PLANNING OFFICER




     Award Winner - Australian Clean Beach
       Challenge 2004 Litter Prevention

Used in these records

About this file

File size
28 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 Request for Further Information - 010.2007.00000738.001 [As Published].pdf · 28 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.