Decision Notice - Approved by Delegation of Authority - RAL26 0023 (As Published) · RAL26/0023
Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 25 September 2030,
unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
261149_001_PROP A Proposed Boundary Realignment – Lot 2 on 20/08/2026
SP269273 & Lot 1 RP184583
4. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Boundary Encroachments
5. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that:
a. all utility services and connections (e.g., electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement;
b. all existing crossovers and driveways, front and are wholly located within the lot they
serve or alternatively included within an easement;
c. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage Act
2002 and associated codes and requirements;
d. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot; and
e. all retaining walls and structures are fully contained within the lot they retain.
Services
6. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
7. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
8. Certification must be submitted to Council from all relevant service providers (Energex and
NBN) which certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Easements
9. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
10. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
11. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Page 2 of 5
Document Set ID: 25202885
Version: 4, Version Date: 29/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - RAL26 0023 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 144 KB (small file)
- File type
No other editions are linked here.