Council archive · source document
OPW15/0203 - Operation Works Application 1 of 2
A statement about how the proposed development addresses the local government's planning schemes and any other planning documents relevant to the application. Cc] Confirmed N/A A statement addressing the relevant part(s) of the State Development Assessment Provisions (SDAP). CO Confirmed Xx Not applicable Applications for building work (including extensions and demolition that i is assessable development) | Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are recommended scales) which show the following: ¢ the north point * the intended use of each area on the floor plan (for commercial, industrial or mixed use developments only) * the room layout (for residential development only) with all rooms clearly labelled * the existing and the proposed built form (for extensions only) * the gross floor area of each proposed floor area. CT] Confirmed Not applicable C ..Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are recommended scales) which show plans of all building elevations and facades, clearly labelled to identify orientation (e.g. north elevation). i Confirmed Not applicable Plans showing the size, location, proposed site cover, proposed maximum number of storeys, and proposed maximum height above natural ground level of the proposed new building work. Cl Confirmed EX] Not applicable Plans showing the extent of any demolition that is assessable development. Cc] Confirmed Not applicable Applications for operational work involving earthworks (filling and excavating) Drawings showing: * existing and proposed contours * areas to be cut and filled * the location and level of any permanent survey marks or reference stations used as datum for the works * the location of any proposed retaining walls on the relevant land and their height © the defined flood level (if applicable) the fill level (if applicable). C] Confirmed i Not applicable Applications for operational work involving roadworks Drawings showing: * existing and proposed contours * the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points ¢ information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) * kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) * edge of pavement where kerb is not constructed * position and extent of channelisation * location and details of all traffic signs, guideposts, guardrail and other street furniture * pavement markings including details on raised pavement markers CL Confirmed xX Not applicable IDAS form 6~-Building or operational work assessable against a planning scheme Version 3.0-—-1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0203 - Operation Works Application 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 627 KB (small file)
- File type
No other editions are linked here.