OPW11/0155 Development Application part 1 of 1 Cover Letter IDAS Form 1 & 2, Checklist 4 Owners Consent Letter Application Information Letter 49 David Low Way Noosa Heads

of 45

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Section reference:
•       Sustainable Planning Regulation 2009, schedule 7, table 3, item 3
•       State planning policy 2/02: Planning and managing development involving acid sulfate soils, section 3.6




    Part 4-Easements and substations


    4.1 Is the filling or excavation associated with reconfiguring a lot?


        7rNo

          Yes           Go to question 4.5
    1-1

    4.2 Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
    the Electriclty Act 1994?


          -
        ]- No       •   Go to question 4.5

          Yes



    4.3 Is any of the proposed operational work to be located wholly or partly in the easement?




          Yes           This application requires assessment by the entity responsible for the easement as an advice agency
    I

    4.4 Is any of the operational work to be located wholly or partly within io metres of a substation site under the
    Electriclty Act 1994?


              No

              Yes   •   This application requires assessment by the entity responsible for the substation as an advice agency
    1-1


    4.5 is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number i issued
    under the Petroleum Act 1.923 for the construction or operation of the Moonie to Brisbane strategic pipeline?


              No    •   End of part 4 of this checklist

    q Yes           •   This application requires assessment by the pipeline licence holders as an advice agency



    4.6 Is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping and not
    associated with reconfiguring a lot?


    LI No           •   End of part 4 of this checklist

    q Yes           •   This application requires assessment by the pipeline licence holder as an advice agency


                                                                                Operational work checklist-IDAS checklist4
                                                                                              Version r. o 18 December 2009

Used in these records

About this file

File size
8.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0155 Development Application part 1 of 1 Cover Letter IDAS Form 1 & 2, Checklist 4 Owners Consent Letter Application Information Letter 49 David Low W.pdf · 8.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.