Council archive · source document
OPW11/0155 Development Application part 1 of 1 Cover Letter IDAS Form 1 & 2, Checklist 4 Owners Consent Letter Application Information Letter 49 David Low Way Noosa Heads
12.2 Is that proposed operational work to be carried out in a wild river area declared under the Wild R1versAct2005?
No • You must complete Marine plants and declared fish habitat areas-/DAS form 26 NJ /ic
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
Yes
12.3 Is all of the proposed operational work for specified works under the Wild RiversAct 2005?
No
q
Yes • Unless the application is consistent with any property development plan applying to the land, then this
q
aspect of the development is prohibited development
• You must complete Marine plants and declared fish habitat areas-/DAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
• End of part 12 of this checklist
12.4 Is any of the proposed operational work to be carried out in a wild river high preservation area?
4
El No • Unless the application is consistent with any property development plan applying to the land, the
assessment manager must refuse to receive it
• You must complete Marine plants and declared fish habitatareas-/DAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
Yes • This aspect of the development is prohibited development
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 7
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 3
• Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, item 9
• Sustainable Planning Regulation 2009. schedule 7, table 2, items 26
• Fisheries Act 1994, section 76DC
• Fisheries Regulation 1995, section 706
1perational work checklist-IDAS checklist 4
Version i. o 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW11/0155 Development Application part 1 of 1 Cover Letter IDAS Form 1 & 2, Checklist 4 Owners Consent Letter Application Information Letter 49 David Low Way Noosa HeadsRelated documentApplication case desk ↗
About this file
- File size
- 8.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.