Original source · versioned page text
2017-04-11 Planning & Environment Committee Agenda
The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 APRIL 2017 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Environment Committee Meeting dated 11 April 2017 regarding Application No. MCU16/0099 and OPW16/0218 for a Development Permit for a Development Permit for Material Change of Use for Service & Utility Type 3 (Tower) and associated Operational Works for Access situated at 23 Jirrima Crescent, Cooroibah and approve the application in accordance with the following conditions: A. Approve the application in accordance with the following conditions: PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Approved Plans Plan No. Rev. Plan/Document Name Date 4GYM-51-36-C000-C2 03 Overall Site Plan drawn by Aurecon 14/12/2016 4GYM-51-36-C000-C3 02 Site Setout Plan drawn by Aurecon 14/12/2016 4GYM-51-36-C000-C4 02 Site Elevation and Details drawn by Aurecon 14/12/2016 4GYM-51-36-C000-A1 02 Antenna Setout Plan drawn by Aurecon 14/12/2016 Building Height The maximum height of the structure must not exceed 46 metres above the finished ground level and the natural ground surface. Certification must be submitted to Council from a Licensed Surveyor which certifies that the monopole structure does not exceed the maximum height requirement of this Decision Notice. No lights are permitted to be attached to the telecommunications facility, except where required for aircraft hazard lighting purposes or similar. Noise Equipment, motors, electrical generators, compressors, etc must be suitably provided with noise reduction measures and located so as to prevent a noise nuisance beyond the boundary of the site and not exceed the levels specified in Table 1. TABLE 1 NOISE LIMITS AT A SENSITIVE RECEPTOR Noise level at noise sensitive place measured as the adjusted maximum PERIOD sound pressure level (LAmax, adj,T) 7am – 6pm Background noise level (LAbg,T) plus 5 dB(A) 6pm – 10pm Background noise level plus 5 dB(A) 10pm – 7am Inaudible NOISE LIMITS AT A COMMERCIAL PLACE Noise level at a commercial place measured as the adjusted maximum PERIOD sound pressure level (Lamax, adj,T) 7am – 6pm Background noise level (LAbg,T) plus 10 dB(A) 6pm – 10pm Background noise level plus10 dB(A) 10pm – 7am Background noise level plus 8 dB(A) Page 59 of 106
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.