Original source · versioned page text
Pack 4 C - Revised Architectural Plans highlighted changes
Plans and drawings: the text below has words only, no drawings.
a) lw ® q cr ae ® cose eo came ee: TTT TMT TTT, oe ee 7 SaDeTS Revise OSVELOPNENT APs ‘ABPUCATION < at | LEGEND INCLUSION OF STAFF/ PUBLIC AMENITIES & EOT REQUIREMENTS. ADJUSTMENT OF BUILDING ENVELOPE / \ PLANNING ARRANGEMENT [3] INTEGRATION OF PUBLIC PEDESTRIAN CONNECTIONS ‘Do net zal this weg. Vert al dinensons on se beere commencing Sry wore Copght o2bToBuenan. Th sang terns te propery oF ‘The Buchan Group Ausra Pry Ls. Reptedurioa wack ot pat wot or conent efoedden Fe RATIONALISATION OF WASTE \— MANAGEMENT STORAGE AND SERVCING NOOSA MARKETPLACE LOT.1 - SP222982: 2-20 HOFMANN DRIVE, LOT.4 - SP2465848: 2-18 HOFMANN DRIVE, NOOSA QLD Prjecttuer 716159 stave ‘Swe Petes 24/00/2010 9:26:16 PM OweTeoves 23.09.19 = ‘As indicated @Ai GO Drawing Tike DESIGN AMENDMENTS (PLAN) A-DA-9001 BUCHAN +61 7 3859 9222 / buchangroup.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.