Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20) · RAL18/0023

of 223

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

Deed of Variation to Infrastructure
Agreement
Noosa Shire Business Centre – Part (Lot 2 on SP 110885)


Noosa Shire Council (Council)


Stockwell NC Pty Ltd ACN 632 359 623 as trustee under instrument 719594542
(Applicant)


Stockwell Development Group Pty Ltd ABN 50 010 095 360 (Stockwell)




Contact - Sarah Macoun, Partner, [email protected]

BRISBANE                                                               PERTH

Level 8, Waterfront Place, 1 Eagle Street          T +61 7 3024 0000   Level 27, Allendale Square, 77 St Georges Terrace            T +61 8 9211 8111
Brisbane Qld 4000 Australia                        F +61 7 3024 0300   Perth WA 6000 Australia                                      F +61 8 9221 9100

PO Box 7822, Waterfront Place Qld 4001 Australia                       PO Box Z 5312, St Georges Terrace, Perth WA 6831 Australia

E [email protected]                                                                                            www.hopgoodganim.com.au
Full text of sections 2 to 119 (of 223)

Section 2

Table of Contents


1.    Definitions, interpretation and Commencement ...........................................................................1
      1.1 Definitions ..........................................................................................................................1
      1.2 Interpretation ......................................................................................................................2
      1.3 Parties ................................................................................................................................2
      1.4 Commencement .................................................................................................................3
2.    Variation .......................................................................................................................................3
      2.1 Infrastructure Agreement ...................................................................................................3
      2.2 Condition precedent ...........................................................................................................3
      2.3 Confirmation of liability .......................................................................................................3
      2.4 Time ...................................................................................................................................3
3.    Governing law and jurisdiction .....................................................................................................3
      3.1 Governing law ....................................................................................................................3
      3.2 Jurisdiction .........................................................................................................................3
4.    Miscellaneous ...............................................................................................................................4
      4.1 Legal effect ........................................................................................................................4
      4.2 Severability ........................................................................................................................4
      4.3 Further assurance ..............................................................................................................4
      4.4 Costs ..................................................................................................................................4
      4.5 Variation .............................................................................................................................4
      4.6 Counterparts ......................................................................................................................4
      4.7 Whole agreement ...............................................................................................................4
Schedule 1 Infrastructure Agreement .......................................................................................................6
Schedule 2 Variations ...........................................................................................................................113




HopgoodGanim Lawyers
1958131 - 20415602_1

Section 3

Deed of Variation
Date


Parties


Noosa Shire Council (Council)


Stockwell NC Pty Ltd ACN 632 359 623 as trustee under instrument 719594542 (Applicant)


Stockwell Development Group Pty Ltd ABN 50 010 095 360 (Stockwell)


Background

A.     The Land is the subject of the Infrastructure Agreement.

B.     Stockwell has lodged with the Council a development application for reconfiguration of a lot with
       respect to Lot 3 on SP246584, which is part of the Land.

C.     Council has publicly notified a draft New Noosa Plan, and subsequently resolved to proceed with it
       (as amended) and to give notice to the Minister requesting its adoption. When adopted by Council,
       the Draft New Noosa Plan will replace the current Noosa Plan 2006.

D.     The Draft New Noosa Plan includes a revised business centre framework plan for The Land which,
       among other things, shows indicative uses and development precincts, proposed roads, proposed
       pedestrian links and character landscape areas.

E.     Stockwell’s development application for reconfiguration of a lot responds to the Draft New Noosa
       Plan and has been designed to accommodate development in accordance with the Draft New Noosa
       Plan.

F.     The parties have agreed to amend the Infrastructure Agreement to align with the development intent
       for The Land as set out in the Draft New Noosa Plan, in accordance with the terms and conditions
       set out in the deed.


Now this deed witnesses


1.     Definitions, interpretation and Commencement

1.1    Definitions

       In this deed:

       Commencement Date means the date when the last party executes this deed.

       Infrastructure Agreement means the agreement dated 3 October 2003 between the Noosa Shire
       Council and the Applicant included as Schedule 1.




HopgoodGanim Lawyers                                                                             Page 1
1958131 - 20415602_1

Section 4

Deed of Variation
       Stockwell means Stockwell Development Group Pty Ltd ABN 50 010 095 360.

       Variations means the amendments to the Infrastructure Agreement as set out in schedule 2.

1.2    Interpretation

       (a)       Unless the contrary intention appears, a reference in this deed to:

                 (1)    a definition or expression used or defined in the Infrastructure Agreement has the
                        same meaning in this deed;

                 (2)    one gender includes the others;

                 (3)    the singular includes the plural and the plural includes the singular;

                 (4)    a person, partnership, corporation, trust, association, joint venture, unincorporated
                        body, Government Body or other entity includes any other of them;

                 (5)    an item, recital, clause, subclause, paragraph, schedule or attachment is to an item,
                        recital, clause, subclause, paragraph of, or schedule or attachment to, this deed and
                        a reference to this deed includes any schedule or attachment;

                 (6)    a party includes the party’s executors, administrators, successors, substitutes
                        (including a person who becomes a party by novation) and permitted assigns;

                 (7)    any statute, ordinance, code or other law includes regulations and other instruments
                        under any of them and consolidations, amendments, re-enactments or replacements
                        of any of them;

                 (8)    money is to Australian dollars, unless otherwise stated; and

                 (9)    a time is a reference to Brisbane time unless otherwise specified.

       (b)       The words include, including, such as, for example and similar expressions are not to be
                 construed as words of limitation.

       (c)       Where a word or expression is given a particular meaning, other parts of speech and
                 grammatical forms of that word or expression have a corresponding meaning.

       (d)       Headings and any table of contents or index are for convenience only and do not affect the
                 interpretation of this deed.

       (e)       A provision of this deed must not be construed to the disadvantage of a party merely because
                 that party or its advisers were responsible for the preparation of this deed or the inclusion of
                 the provision in this deed.

1.3    Parties

       (a)       If a party consists of more than one person, this deed binds each of them separately and any
                 two or more of them jointly.

       (b)       An agreement, covenant, obligation, representation or warranty in favour of two or more
                 persons is for the benefit of them jointly and each of them separately.

       (c)       An agreement, covenant, obligation, representation or warranty on the part of two or more
                 persons binds them jointly and each of them separately.




HopgoodGanim Lawyers                                                                                Page 2
1958131 - 20415602_1

Section 5

Deed of Variation
1.4    Commencement

       This deed commences and has effect on the Commencement Date.


2.     Variation

2.1    Infrastructure Agreement

       The parties agree that:

       (a)    The Infrastructure Agreement is varied by this deed only in the manner and to the extent
              described in the Variations; and

       (b)    The Variations to the Infrastructure Agreement come into effect on and from the
              Commencement Date.

2.2    Condition precedent

       (a)    This Variation Deed is subject to and conditional on each party unconditionally delivering a
              full and validly executed deed or counterpart of this deed to the other party.

       (b)    Each party must use all reasonable endeavours to procure the satisfaction of the condition
              specified in clause 2.2(a).

       (c)    If the condition in clause 2.2(a) is not satisfied then this deed will be of no force or effect and
              the parties will have the same rights and obligations which they had prior to the date of
              execution of the deed as if this deed had never been executed.

2.3    Confirmation of liability

       The parties:

       (a)    affirm that they are bound by the terms of the Infrastructure Agreement (as varied by this
              deed); and

       (b)    acknowledge that their obligations and liability under the Infrastructure Agreement are not
              discharged or varied by this deed except to the extent that this deed may otherwise expressly
              specify.

2.4    Time

       If, under the Infrastructure Agreement, time is of the essence in relation to the performance of an
       Obligation of a party, time remains of the essence in relation to that Obligation unless this deed
       specifies otherwise.


3.     Governing law and jurisdiction

3.1    Governing law

       This Variation Deed is governed by and construed in accordance with the laws of Queensland.

3.2    Jurisdiction

       Each party irrevocably:




HopgoodGanim Lawyers                                                                                 Page 3
1958131 - 20415602_1

Section 6

Deed of Variation
       (a)     submits to the non-exclusive jurisdiction of the courts of Queensland and
               the courts competent to determine appeals from those courts, with respect
               to any proceedings which may be brought at any time relating to this deed; and

       (b)     waives any objection it may now or in the future have to the venue of any proceedings, and
               any claim it may now or in the future have that any proceedings have been brought in an
               inconvenient forum, if that venue falls within clause 3.2(a).


4.     Miscellaneous

4.1    Legal effect

       Each party acknowledges and agrees for the benefit of each other party that this document is
       intended to take effect as a deed. Each party executes this document with the intention that it will be
       immediately legally bound by this document despite the existence of, but subject to, the conditions
       precedent contained in clause 2.2. To avoid any doubt, there will be no need for further delivery of
       this document following the satisfaction of the conditions precedent contained in clause 2.2.

4.2    Severability

       If a provision of this deed is illegal, invalid, unenforceable or void in a jurisdiction it is severed for that
       jurisdiction and the remainder of this deed has full force and effect and the validity or enforceability of
       that provision in any other jurisdiction is not affected.

4.3    Further assurance

       Each party must promptly at its own cost do all things (including executing and delivering all
       documents) necessary or desirable to give full effect to this deed and the transactions contemplated
       by it.

4.4    Costs

       Each party is responsible for all its own costs incurred in the negotiation and performance of this
       deed including legal costs.

4.5    Variation

       An amendment or variation to this deed is not effective unless it is in writing and signed by the
       parties.

4.6    Counterparts

       This deed may be executed in any number of counterparts each of which will be considered an
       original but all of which will constitute one and the same instrument. A party who has executed a
       counterpart of this deed may deliver it to, or exchange it with, another party by:

       (a)     faxing; or

       (b)     emailing a pdf (portable document format) copy of,

       the executed counterpart to that other party.

4.7    Whole agreement

       This deed:

       (a)     is the entire agreement and understanding between the parties relating to the subject matter
               of this deed; and


HopgoodGanim Lawyers                                                                                     Page 4
1958131 - 20415602_1

Section 7

Deed of Variation
       (b)    supersedes any prior agreement, representation (written or oral) or
              understanding on anything connected with that subject matter.




HopgoodGanim Lawyers                                                                Page 5
1958131 - 20415602_1

Section 8

Deed of Variation
Schedule 1 Infrastructure Agreement




HopgoodGanim Lawyers                  Page 6
1958131 - 20415602_1

Section 9

:_J
�I
�-l       .e,.a;" .
                                         NOOSA SHIRE COUNCIL                                  -
-1
                                                  AND

                                            MIROSE PTY LTD

�!
-,    I
-1
      l

                                  INFRASTRUCTURE AGREEMENT

                      NOOSA SHIREBUSINESS, CENTRE - PART (LOT 2 ON SP 110885)




                                                                                              ........J



                                                                                              '      '
                                                                                              I




                                                                    Hopgood Ganim Lawyers
                                                                             ·GPOBox367
                                                                          Brisbane Q 4001
                                                                           Tel 07 3234 7777
                                                                           Fax07 3221 9290


 . l
 -l
          l
 r




 -l                                                                                 Page 7


[OCR of page images]
NOOSA SHIRE COUNCIL
AND

MIROSE PTY LTD

 

INFRASTRUCTURE AGREEMENT

NOOSA SHIRE BUSINESS, CENTRE — PART (LOT 2 ON SP 110885)

 

‘Hopgood Ganim Lawyers

GPO Box 367

Brisbane Q 4001
Tel 07 3234 7777
Fax 07 3221 9290

Page 7

Section 10

Page 8


[OCR of page images]
 

CONTENTS
INTERPRETATION....ccsssssssssssssseeeessssessssesssesssstansesenssensssssssnssssssestanentenecceessssec sateeeeeeees 4
1.1 NAMIC seescsssssssssetnnsessnnseessessneneesensssetnsesnssesunsssesistsissssetanensseuuatsescesasisunaseeees 4
1.2 Commencement ..

1.3 -  Terminatione.....ccccccccccocsseeee

   
  

4
4
1.4 Interpretation 4
1.5 Definitions........ 6
1.6 Other Expressions sateeeesseeseseneneees wees )
1.7 When Development Approvals Take Effect 10

 

3.1

3.2

3.3

OPEN SPACE......

4.1 OSA and OSB (Open Space Areas A and B) o....sscsssssssssssssesessesesssasssssescsssssescecce 10
4.2 Deemed Contribution to Community Infrastructure ~ Public Open Space ........... 10

4.3 Deemed Contribution to Community Infrastructure ~ Private Open Space.
4.4 Future Conditions/Infrastructure Charges
4.5 Future Buffers to Open Space Areas

  

 

 

DRAINAGE/WATERWAY MANAGEMENT............ ‘
5.1. External Stormwater Works......cssssssssssssussssussssseussstesssssssssssstusisseeeseceeseesece 11
EXTERNAL ROADWORKS ...scssssssssssesesesssetssssssssseessstsntusattisssesussssusasseunseeeneee 1

  
  
  

6.1 Design Standards o.........ccccscssscssssssscssesessscsssesesesssssesecece
6.2 ‘Eenie Creek Road ..
6.3 Walter Hay Drive...
6.4 Timing for Payment

 

6.5 Dedication for public road purposes for Walter Hay Drive............ : 15
6.6 Surplus Parts of Existing Road Reserve w.sccssecsssssssnssensntesssssecssseen 16
OWNERSHIP OF INFRASTRUCTURE ..ssssssssssssssesssessesstsentssstsesstsssstsseneseeeeeeecce 16

7.1 Infrastructure within the Proposed Development
72 Infrastructure External to the Proposed Development

 
    

CONDITIONS PRECEDENT ....sssscsssssssssnstsstnssssessessusnstnttnattsssinassiassesuseenseeeec, 16

8.1 Conditional Upon Approval of Development Application...
8.2 Infrastructure Agreement Terminates .......cccccssssesccssseeeeccoes
8.3 Conditional Upon Applicant Becoming Owner of Land...
8.4 Failure to Complete Contract

Section 11

Page 9


[OCR of page images]
 

 

  

 

   

 
  
 
  
 
 
 
 

9

10
10.1 Description of Stage 1 and Future Stages
10.2 Intent re Stage 1 and Future Stages

10.3 Extent of Immunity of Future Stages of the Shire Business Centre on the Land

from Infrastructure Conditions/Charges

10.4 Future Stages Not Immune From Urban Water Cycle and Sewerage Headworks

Contributions/Charges o.........ccsssssssssssssssssssscsssssssssssssssesesesssssssasssssssiosesseeesesceeesec 18

10.5 Future Stages of the Shire Business Centre not on the Land as contemplated by

Master Plam 2 .....ssssccccscssssssssssssnsnessessssssessessessssesessasussssevseessssssessessssssvesessssssesssscsese 18
11 GST woes eseeseccccsseonsussssnsesssssssscssssonessnsmusssssssessesssnsssnevssssessssasarsesssnsesussessssssssstasneceseesecccoses 18
TLL Definitions... ec ecsssssscsssssscesssnscssssecsssssesecsssusessusessusenasacseseseccees
11.2 -Payment of GST
12 NOVATION OF DEED UPON SALE

12.1. Restriction on the right to Sell the Land ..sssscsssesssssssssssssecooseosesss

12.2. Applicant Remains Liable Until Purchaser Signs

12.3. Restriction not to apply to subdivided Lots

13 SERVICE ....sscsssssssssescsssseesssssessssssneecesesssssssssssssssessssssssusseesssuvsessuusssssssssesserasssassessssssssssssessees 20

13.1 Service by prepaid pOSt.....ccsssccsssssesessececsescseeees

13.2 Service by poSt.......cceccesessesees

13.3. Proof of service

_ 13.4 Form of Notice
14 MISCELLANEOUS .....sssssssssssssssssesssesescessessssssssessssssssesssssssssscerssssesessessssssssssauiusesesseeatuesses 21

14.1 Payment of costs

14.2 Time. eeececsssses ences

14.3 Place for payment of monies..............

4A WAV ET eeessecssssssecsssessssessserecsucesseenaes

14.5 Laches and delay..

14.6 Power of entry...

14.7 Severance... eccsesseseseecteneee

14.8 Warranty of authority...

14.9 Further assurances...

14.10 Force Majeure ..............

14.11 Amendment of document......c.ccccssssssssesssscsescsssecesssusssssssssscssstsseveccesseeecceceses,
Annexure 1 — Decision Notice DA 22803 dated 18 August 2003.00.00... e.cccccccseesceseececeussseeece 25
Annexure 2 — Plan of Open Space Areas........cccccccccessesssssessssecsseessceccassecteceeseeecce cece 26
Annexure 3 — GHD Plan 41 — 12240-C027 o......ccccsesccssssssscesseessecsececcsssessuececeesceseeeseee 27

Page 9

Section 12

Page 10


[OCR of page images]
 

Annexure 4 — Funding responsibilities for Walter Hay Drive oe. eceeccceceeeeee Veeteeeeeeaeeeees 28
Annexure 5 — Master Plan 2 endorsed 10 April 2003 .......ccecceeceeesesseescesscessececteceseseseens 29
Annexure 6 — Plan showing Public Road required from the Land for Walter Hay Drive ......... 30
SCHEDULE 1 - AGREEMENT DETAILS 24
Page 10

Section 13

Page 11


[OCR of page images]
 

Page 4

THIS AGREEMENT is made on the date stated in item 1 of Schedule 1.

. BETWEEN The Council

AND The Applicant

RECITALS

A The Land is part of an area designated for the Shire Business Centre under the Strategic
Plan.

The Applicant has contracted to-purchase the Land.
The Council has issued to the Applicant a decision notice approving a development permit

for a material change in use over part of the Land for the purpose of Stage 1 of the Shire
Business Centre.

D The Council and the Applicant wish to enter into an.agreement about Development
Infrastructure Items to be provided or funded by the Applicant pursuant to the provisions
of Chapter 5 of the Integrated Planning Act 1997 Part 2 — Infrastructure Agreements.

IT IS AGREED
1 INTERPRETATION
1.1 Name
This.document may be referred to in accordance with item 2.
1.2 Commencement
This document commences on the Commencement Date.
1.3 Termination
This document ceases to have effect, subject to clauses 8 and 9:

a. . one year after the expiry of development on the land in accordance with MP2 has
been achieved; or

b. ona date upon which the parties agree in writing.
whichever first occurs.
14 Interpretation
a. In this document, unless a contrary intention appears, reference to:
@) a clause is to a clause in this document; and .

(i). _ the singular includes the plural and vice versa; and

Page 11

Section 14

Page 12


[OCR of page images]
 

L

Page 5

(iii) any gender includes all other genders; and

(iv) a person includes a firm, a corporation, an association and a body, whether
incorporated or not and a government or statutory body or authority; and

(v) legislation (including subordinate legislation) includes:
(A) _ statutory instruments made under the legislation; and

(B) consolidations, amendments, re-enactments or replacements of the
legislation; and

(vi) writing includes any mode of representing or reproducing words in tangible
and permanently visible form and includes facsimile transmission; and

(vii) this or any other document includes the document as varied or replaced and is
not affected by any change in the identity of the parties.

. The clause headings appearing in this document are inserted for convenience of

reference and do not affect the construction of this document.

If any words are italicised or otherwise printed differently, this has been done for
convenience only and does not affect the construction of this document.

. Whenever more persons than one constitute a party all the covenants, agreements,

conditions, restrictions and provisos on the part of that party contained or implied in
this document bind those persons jointly and each of them severally.

This document is in all respects to be interpreted in accordance with the laws of the
State of Queensland, and the parties irrevocably and unconditionally submit to the non-
exclusive jurisdiction of the courts of that state and any courts which have jurisdiction

to hear appeals from them, and waive any right to object to proceedings being brought
in those courts.

Nothing contained in this document affects, prejudices or derogates from the
requirements of any statute or from the tights, powers and authorities of the Council
under the provisions of any statute or under any declared policy of the Council.

. An inclusive definition, or an example or particularisation of a provision, does not limit

but may extend that definition or provision.

Where a word or expression is defined, other parts of speech and grammatical forms of
that word or expression have a corresponding definition.

All Schedules to this document form part of this document, and a reference to an item
is a reference to an item in Schedule 1.

Terms used in the Conditions of Approval which are not otherwise defined in the

Conditions of Approval or in Clause 1.5 (Definitions) shall have the meanings
assigned to them in the Planning Scheme.

Page 12

Section 15

Page 13


[OCR of page images]
1.5

 

Page 6

Definitions
In this document:

“Act” means the Integrated Planning Act 1997 and includes the Local Government
(Planning .and Environment) Act 1990 and the Local Government (Planning &
Environment) Regulation 1991 to the extent. that they are relevant to the Development
Application, the Conditions of Approval and the Proposed Development by operation of
the Integrated Planning Act 1997 or the Acts Interpretation Act 1954.

“Agreement” means this Infrastructure Agreement and that term is interchangeable with
the term “document” wherever used

“Appeal” means an appeal to the Court under the Act.

“Applicant” means the person described in and having its address at the place described
in item 4 and includes: :

a. successors and permitted assigns in the case of a corporation, association or other body
whether incorporated or not;

b. executors, administrators and permitted assigns in the case of a natural person; and

c. any person who enters into a Deed of Novation with the Council in respect of this _
Agreement.

“Approved Plan of Development” means:
a. the plans referred to in the Conditions of Approval; or

b. in the absence of plans referred to in the Conditions of Approval, the plans submitted
with the Development Application to which the Conditions of Approval relate.

“Authority” means all authorities or instrumentalities (other than the Council), which have
jurisdiction over the Works.

“Building” has the meaning given in the Act.

“Chief Executive Officer” means the Chief Executive Officer of the Council and includes
the person (if any) for the time being acting as Chief Executive Officer of the Council.

“Commencement Date” means the date stated, in item 1.

“Conditions of Approval” means the conditions (if any) imposed by the Council and
contained in the Decision Notice issued by the Council in respect of the Development
Application, and as varied by the Court in the event of an appeal against the Council’s
decision in respect of the Application.

“Council” means the Local Government described in item 3.
“Council's Agents” includes the Council's members, officers, agents, servants, employees,
contractors and subcontractors, and agents and-servants of the Council's contractors and

subcontractors.

Page 13

Section 16

Page 14


[OCR of page images]
eh LLL

ved,

Page 7

“Court” means the Planning and Environment Court and in the event of an appeal against
a decision of the Planning and Environment Court includes the Court of Appeal of the
Supreme Court of Queensland and the High Court of Australia in the circumstances of
applications for leave to appeal and appeals to those Courts. :

“Decision Notice” means the negotiated decision notice 22803 DA dated 18 August 2003
issued to the Applicant by Noosa Council on 21 August 2003 -in respect of Stage 1 of the
_Shire Business Centre, a copy of which is Annexure 1.

“Demaining Agreement” means an agreement dated 20 April 2001 (as varied by the
parties from time to time), between the Main Roads Department and Noosa Council, which
includes funding arrangements for the Walter Hay Drive Construction andthe construction
of Eenie Creek Road Stage 2.

“Department” means the government department or public sector unit which administers
the Act, unless its use is in the context of the Main Roads Department.

“Development” has meaning given in the Act.

“Development Application” means the application made under the Act by the Applicant
to the Council described in item 6. :

“Development Approval’ has the meaning given in the Act.

“Development Infrastructure Item” has the meaning given in the Act.
“Development Permit” has the meaning given in the Act.

“Do” in relation to Works includes carry out, provide, perform and undertake.

“Kenie Creek Road Stage 1” means Eenie Creek Road between its intersections with
Eumundi-Noosa Road and Reef Street, inclusive of its connections to these intersections.

“Eenie Creek Road Stage 2” means Eenie Creek Road between Reef Street and its
intersection with Cooyar Street via Langura Street.

“Force Majeure” means an event:

a. being a decree of the Commonwealth Government or the State Government, an act of
God, industrial disturbance, act of public enemy, war, international blockade, public
riot, lightning, flood, earthquake, fire, storm or other event whether of a kind herein
specified or otherwise; and : :

b. which is not within the control of the party claiming Force Majeure; and

which could not have been prevented by the exercise by that person of a standard of

foresight, care and diligence consistent with that of a prudent and competent person under

the circumstances.

“Future Stage” means any subsequent development of the Shire Business Centre.

“Infrastructure Charges” has the meaning given in the Act.

Page 14

=

na

Section 17

Page 15


[OCR of page images]
 

Page 8

“The Land” means the land described in item 5 and includes:
a. any estate or interest in, on, over or under the land; and
b. the airspace above the surface of the land and any estate or interest in the land; and
c. the subsoil of the land and any estate or interest in the subsoil; and
d. any part or parts of the land; and
e. any estate or interest created in respect of any of the above matters.
“Local Government” has the meaning given in the Local Government Act 1993
“Lot” has the meaning given in the Act.

“Main Roads Department” means the government department or public sector unit
responsible to the Minister for Transport and Minister for Main Roads.

“Manager” means the officer of the Council who heads the directorate or section of the

Council having responsibility for the subject matter in relation to which the term is used: -

and includes the officer (if any) for the time being acting as the head of that directorate or
section of the Council. ,

“Master Plan 2” means The Shire Business Centre Master Plan: Stage 2 (MP2) adopted
by the Council on 10 April 2003 a true copy of which is contained in Annexure 5.

“Notice” means any certificate, demand or notice to be made, given or served by a party
under this document.

.

“Open Space Area A” means the part of OS1..which-is coloured blue on the plan in
Annexure 2 wee :

“Open Space Area B” means the part of OS2 which is coloured green on the plan in
Annexure 2

“Open Space Area C” means the area shown as “OS3” on Master Plan 2 which is
proposed to be maintained as Private Open Space substantially in its natural state for the
preservation of visual amenity and is coloured red on the plan in Annexure 2

“Open Space Area E” means the area shown as “OSS” on Master Plan 2 which is
proposed to be maintained as Private Open Space substantially in its natural state for the
preservation of visual amenity and is coloured yellow on the plan in Annexure 2

“Open Space Area G” means the area shown as “OS7” on Master Plan 2 which is
proposed to be maintained as Private Open Space substantially in its natural state for
environmental drainage and ecological purposes and is hatched on the plan in Annexure 2

“OS1”, “OS2”, “OS3”, “OSS” and “OS7” means the relevant open space areas bearing
those numerical designations as shown on Master Plan 2

“Planning Scheme” means the planning scheme for Noosa Shire gazetted May 1985 in
force at the date of this document.

Page 15

Section 18

Page 16


[OCR of page images]
 

1.6

Page 9

“Present Designation” means the area, precinct or zone in which the Land is presently
included under the Planning Scheme as described in item 7.

“Private Open Space” means open space land which is retained in private ownership and
maintained privately.

“Proposed Development” means the Development of the Land proposed in the
Application as amended by any Conditions of Approval.

“Public Office” has the meaning given in the Local Government Act 1993.
“Public Open Space” means open space land which is publicly owned and maintained.
“Reconfiguring” has the meaning given to reconfiguring a lot in the Act

“Sell” includes transfer, dispose of, and alienate and “Sale” has the corresponding
meaning.

“Shire Business Centre” means the Shire Business Centre for Noosa planned for

development on land including the Land and described in Section 19.3 of the Strategic
Plan.

“Site works” means any works approved by a development permit for operational work in
association with the proposed development, but excluding infrastructure works, which the
Applicant is required to construct or for which the Applicant is to make a contribution
under this Agreement.

“Stage 1” means the first stage of development of the Shire Business Centre described in
the Development Application and approved under the Decision Notice, unless otherwise
used in the context of Eenie Creek Road.

“Strategic Plan” means the 1997 Strategic Plan for Noosa Shire.

“Use” has the meaning given in the Act.

“Walter Hay Drive” means the proposed road formerly known as the Southern Access
Road between Emu Mountain Road and Eenie Creek Road, and which traverses the Land
as shown on the plan adopted by the Council as the proposed alignment of the road on 1
May 2003, as further modified by GHD plan 41-12240-C027 revision B, or as varied by
subsequent detailed design. ,

“Walter Hay Drive Construction” means thé“construction of a two lane two way road
between Emu Mountain Road and Eenie Creek Road, excluding works on Walter Hay
Drive, which the Applicant is required to construct or for which the Applicant makes a
monetary contribution under this Agreement. .

“Works” means the infrastructure works, which the Applicant is required to construct or
for which the Applicant makes a contribution under this Agreement.

Other Expressions

If a term is not defined in this document it shall unless the context otherwise requires, have
the meaning given to it by:

Page 16

Section 19

Page 17


[OCR of page images]
 

17

3.1

3.2

3.3

Al

4.2

Page 10

a. the Act; or

b. the Macquarie Dictionary in the absence of a definition in the Act.
When Development Approvals Take Effect.

If a provision of this Agreement refers to a Development Approval taking effect in
accordance with the. Act, and there is an appeal to the Court affecting the Development
Approval, the appeal will not be taken, for the purposes of this Agreement, to be “finally
decided” in terms of Section 3.5.19(c) of the Act until all appeals to the Court of Appeal
and the High Court of Australia, and any remittance of the primary appeal back to the
Planning and Environment Court, have been finally decided and no other appeal affecting
the decision of the Planning and Environment Court is possible.

INFRASTRUCTURE AGREEMENT

This document is intended to constitute an infrastructure agreement under the Act.

OBLIGATIONS OF PARTIES
Compliance of Council

The Council shall comply with the terms of this document subject to the provisions of
Clauses 8 and 9.

Compliance of Applicant

The Applicant shall comply with the terms of this document subject to the provisions of
Clauses 8 and 9.

'

Time for Compliance

All obligations that the Applicant is required to comply with pursuant to this Agreement
shall be so done or paid within the time respectively provided in this document.

OPEN SPACE
OSA and OSB (Open Space Areas A and B)

The Applicant shall dedicate Open Space Area A and Open Space Area B for the purposes

of public open space — conservation and waterways protection in accordance with the
Conditions of Approval. :

Deemed Contribution to Community Infrastructure — Public Open Space

The Council recognises that the dedication of Open Space Area A and Open Space Area B,
comprising approximately 12.63 hectares (subject to survey) as public open space, is an
appropriate commitment of land to meet the environmental needs-of the Land on the part

of the Applicant and shall be taken to be a contribution by the Applicant to community
infrastructure.

Page 17

Section 20

Page 18


[OCR of page images]
 

5

6

43

4.4

4.5

5.1

6.1

Page 11

Deemed Contribution to Community Infrastructure — Private Open Space

space, and its on-going maintenance, is a commitment on the part of the Applicant of land
to meet the environmental requirements associated with the proposed development and

shall be taken to be equivalent to a contribution by the Applicant to community
infrastructure.

Future Conditions/Infrastructure Charges

Having regard to the matters Stated in Clauses 4.2 and 4.3, the Council agrees that unless
otherwise requested or agreed to by the Applicant:

(a) Applications for development approvals in respect of Future Stages on the Land
shall be immune from conditions requiring; and

(b) The Land shall be immune from future infrastructure charges or levies in respect
of

any further dedication of land, and any acquisition of other land.
contributions or charges on account of parks, conservation reserves

DRAINAGE/WATERWAY MANAGEMENT

External Stormwater Works

Nothing in this Agreement affects the ability of the Council to lawfully impose conditions
requiring the construction or augmentation of stormwater systems external to the site in
response to applications for Development Approvals relating to Future Stages of the Shire
Business Centre.

EXTERNAL ROADWORKS

Design Standards

The following design and construction standards shall apply to roadworks constructed
under this document and the Conditions of Approval:

Page 18

Section 21

Page 19


[OCR of page images]
 

fo fo bo fl

6.2

Page 12

a. The design of the horizontal and vertical alignment shall comply with latest Main
Roads Road Planning and Design standards, (also available from the internet).

_b. Vehicle design speeds through roundabouts shall not fall below 30 kph and the

differential design speed within adjacent elements of the roundabout should not vary by
more than 10 kph.

c. Pavement design shall take into account projected traffic volumes for a design life of
20 years.

d. Designs shall employ best engineering practice conform to appropriate Australian
standards, and road user safety must be of paramount consideration, and be
accompanied by a road safety audit report.

e. The Manager Land Development shall approve all designs for works to be designed
and / or constructed by the Applicant prior to commencement of work.

Eenie Creek Road

6.2.1 Upgrade of Eenie Creek Road from Eumundi Noosa Road to Walter Hay Drive
from two lanes to four lanes

The Applicant shall, at no cdst to the Council, design and construct an upgrade of Eenie
Creek Road from Eumundi Noosa Road to Walter Hay Drive from two lanes to four lanes
in accordance with the Conditions of Approval.

6.2.2 Access intersection with Eenie Creek Road

The Applicant shall design and construct the access intersection with Eenie Creek Road in
accordance with the Conditions of Approval.

The Applicant shall dedicate any land required for the access intersection at no cost to the °
Council, including any land that may be required to facilitate the type of intersection
referred to in Clause 6.2.3.

6.2.3 Future Impacts on the Arterial Road Network

Should the Council and the Applicant agree that the access intersection to the Shire
Business Centre on Eenie Creek Road is unsatisfactory because there are adverse impacts
on the arterial road network or to the traffic management of the Shire Business Centre, the
Council may permit the Applicant to make adjustments to the type of intersection and any
such works shall be undertaken by the Applicant ‘at no cost to the Council. Nothing in this
clause: shall prevent the Council from lawfully conditioning an application for a
development permit for a future stage of the Shire Business Centre so as to require the
access intersection to be upgraded.

The Manager Land Development shall approve the design of any modifications to the type
of intersection.

6.2.4 Upgrade of Eenie Creek Road from Walter Hay Drive to Reef Street from two
lanes to four lanes

Page 19

Section 22

Page 20


[OCR of page images]
 

6.3

Page 13

The Applicant shail, at no cost to the Council, construct two additional westbound lanes on
Eenie Creek Road between its intersections with Walter Hay Drive and Reef Street in
accordance with the Conditions of Approval.

6.2.5 Access to Lot 1 on RP215933 — Childcare Centre

Access to existing Childcare Centre on Lot 1 on RP215933 shall be retained at all times by
the Applicant in accordance with the Conditions of Approval.

6.2.6  Eenie Creek Road Stage 2

‘For avoidance of doubt it is agreed that the Applicant is not required to construct any part
of Eenie Creek Road Stage 2 and that the Council will use its best endeavours to complete
its construction by June 2005.

6.2.7 Cycle Ways / Bicycle lane from Shire Business Centre to Eumundi Noosa Road

The Applicant shall construct a 2m wide pedestrian/bicycle pathway on Eenie Creek Road
from the Shire Business Centre to the intersection of Eenie Creek Road and Eumundi
Noosa Road in accordance with the Conditions of Approval.

6.2.8 Design Costs for Eenie Creek Road

The Applicant shall pay to the Council its reasonable costs incurred for the design of two
westbound lanes of Eenie Creek Road between Reef Street and Walter Hay Drive referred
to in clause 6.2.4. The Applicant shall be responsible to undertake the design of Eenie
Creek Road between Walter Hay Drive and Eumundi Road inclusive of the access to the
Shire Business Centre at no cost to Council

,

6.2.9 Supervision

The Applicant shall pay to Council for the reasonable costs incurred by the Council in
supervising the construction of works referred to in clause 6.2.

Walter Hay Drive

6.3.1 Alignment

Works required in Walter Hay Drive shall be generally in accordance with Council’s
approved alignment as indicated in the planning and design concept for Walter Hay Drive,
approved by Council on 1 May 2003, as further modified by GHD plan 41-12240-C027
revision B in Annexure 3, or as subsequently approved by Council for the detailed design.

6.3.2 Funding Responsibilities

This document acknowledges that Walter Hay Drive Construction is being funded as a two
lane two way road pursuant to a Demaining Agreement by the Main Roads Department
and that changes to alignment will become necessary to accommodate a northern and a
southern roundabout to the Shire Business Centre off Walter Hay Drive. The design of the
road and bridgeworks prepared by GHD has included all works required to construct
Walter Hay Drive inclusive of these two roundabouts.

Page 20

Section 23

Page 21


[OCR of page images]
 

Page 14

The extent of funding responsibility of the Applicant to make a monetary contribution
under this infrastructure agreement is shown in Annexure 4 and includes:

a. a northern roundabout on proposed Walter Hay Drive providing access to the
proposed development and associated road work;

b. two northbound lanes on Walter Hay Drive between Eenie Creek Road roundabout
and the northern roundabout on proposed Walter Hay Drive providing access to the
proposed development referred to in clause 6.3.2 a; and

¢. a southern roundabout providing access to the proposed development on the section
of the proposed Walter Hay Drive to the south of the roundabout referred to in clause
6.3.2 a and associated road work. :

6.3.3 Southern Roundabout

The.parties agree that:

a. The southern roundabout access referred to in clause 6.3.2 ¢ is not required in respect
of the Development Application;

b. The Applicant could be lawfully conditioned to provide the southern roundabout in

connection with an application for a Development Approval for a Future Stage;

c. Additional construction costs would be incurred in altering Walter Hay Drive to
include the southern roundabout when a Future Stage is developed;

‘| The Applicant will make a monetary contribution to enable the southem roundabout

to be constructed contemporaneously with the construction of Walter Hay drive, to
avoid the additional costs referred to in clause 6.3.3 c.

6.3.4. Design and Supervision Costs (erent

The Applicant agrees to pay:

a.  Council’s reasonable design. costs for the works in clauses 6.3.2 a to c inclusive; and

b.  Council’s supervision / administration costs for the works in clauses 6.3.2 a to c
inclusive calculated at 2.5% of the estimated cost of Walter Hay Drive Works as
determined by clause 6.3.6.

6.3.5 Timing of Walter Hay Drive Works

The Council agrees to have the works listed in clauses 6.3.2 a to b completed by 31*
January 2006.

The Council also agrees to use its best endeavours to have the remaining works for Walter
Hay Drive Construction completed by 31" January 2006.

6.3.6 Cost of Walter Hay Drive Works

Page 21

Section 24

Page 22


[OCR of page images]
 

 

6.4

6.5

Page 15

For the works listed in clauses 6.3.2 a to c inclusive, the amount of contributions shall be
determined in accordance with certified progress claims for the relevant works in
accordance with Clause 6.4.

6.3.7 Applicant not required to construct Walter Hay Drive

For avoidance of doubt, but’ subject to the provisions of clause 6.3.2, it is agreed that the

Applicant is not required to construct any part of Walter Hay Drive, such construction
being the responsibility of the Council.

6.3.8  Pedestrian/bicycle underpass under Walter Hay Drive

The Applicant shall contribute to Council for a pedestrian/bicycle underpass under Walter
Hay Drive. The amount of contribution shall be assessed as 50% of the cost of

constructing the underpass, determined in accordance with certified progress claims for the
relevant works in accordance with Clause 6.4.

The underpass works shall include the structure, headwalls, lighting, drainage and
associated works required by the roadworks contract documentation.

The Applicant shall construct bike paths between the pedestrian/bicycle underpass under
Walter Hay Drive and under Eenie Creek Road to the proposed development within road
Teserve at no cost to the Council to the reasonable satisfaction of the Manager.

Timing for Payment

Any works to be paid for by the Applicant by way of contribution to the Council shall be
the subject of an itemised progress claim certified by the Superintendent appointed by the
Council to administer a contract to be let for Walter Hay Drive Construction and the
relevant works being the subject of the contribution. -

Within 14 days of being advised by the Council in writing that a progress payment has
been certified for works in respect of which the Applicant is required to make a
contribution (including the provision of a copy of the certified progress claim) the
Applicant shall pay to the Council the amount so certified for the relevant works.

Within one month of being advised by the Council in writing of other costs the Applicant

is required to meet pursuant to this Agreement, the Applicant shall pay to the Council the
amount so advised.

Dedication for public road purposes for Walter Hay Drive

The Applicant shall dedicate to the State for the purposes of public road land shown in
Annexure 6 for the proposed Walter Hay Drive at no cost to the Council. The final
boundaries and area required to be dedicated is subject to survey and the Applicant shall

submit for approval and sealing by the Council a Survey Plan excising the area to be
dedicated:

a. within 12 months of the Development Permit taking efféct.in accordance with the
Act; or

Page 22

Section 25

Page 23


[OCR of page images]
Lo bo

oo

—

6.6

71

7.2

8.1:

8.2

8.3

Page 16

b. subject to this Agreement having become unconditional pursuant to Clauses 8 and
9, within 1 month of Council advising the Applicant that it has advertised tenders
for the Walter Hay Drive Construction; or

c. contemporaneously with the dedication of Open Space required in Clause 4.1.
whichever is the earliest.
Surplus Parts of Existing Road Reserve

The Council acknowledges that the Applicant will seek to acquire any portions of the
existing road reserve that is generally in the location of the proposed Walter Hay Drive,
adjoining the Land and which is not required for the purposes of Walter Hay Drive. The
Council agrees to support any application made by the Applicant to the Department of
Natural Resources and Mines to acquire any such surplus land for inclusion in the Shire
Business Centre.

OWNERSHIP OF INFRASTRUCTURE
‘ Infrastructure within the Proposed Development

The Applicant will own infrastructure constructed on the Land excluding infrastructure

’ contained in public road dedicated from the Land.

The Applicant agrees to construct and maintain infrastructure constructed on the Land to a

standard acceptable to the Manager until such time as either the Council or the State’

accepts the ownership of infrastructure.

Nothing in this clause binds either the Council or the State to accept ownership of ,

infrastructure within the development. ‘
Infrastructure External to the Proposed Development:

The Council or the State will own infrastructure external to the Land, including works
provided by the Applicant for Walter Hay Drive and Eenie Creek Road.

CONDITIONS PRECEDENT
Conditional Upon Approval of Development Application

This Agreement is conditional upon the Decision Notice taking effect in accordance with
Section 3.5.19 of the Act.

Infrastructure Agreement Terminates

If the Decision Notice does not.take effect in accordance with Section 3.5.19 of the Act,
then this Agreement will automatically cease and determine.

Conditional Upon Applicant Becoming Owner of Land

This Agreement is conditional upon the Applicant completing its purchase of the Land in

accordance with the terms of the contract of sale between the Applicant and the owner of /

the Land.

Page 23

be

Section 26

Page 24


[OCR of page images]
 

—L

col

od

10

8.4

9.1

10.1

10.2

10.3

Page 17

Failure to Complete Contract

If the Applicant does not complete the purchase of the Land in accordance with the terms
of the contract of sale referred to in Clause 8.3, then this Agreement may be terminated by
either party giving written notice of termination to the other.

CONDITIONS — SUBSEQUENT
Lapse or Cancellation of Permit
If the Development Permit:
9.1.1 lapses in accordance with Section 3.5.21 of the Act; or

9.1.2 is cancelled upon the request of the Applicant in accordance with Section 3.5.26
of the Act

then, to theextent that this Agreement is not completed, this Agreement will automatically
cease and determine.

FUTURE STAGES OF SHIRE BUSINESS CENTRE

The Shire Business Centre shall be developed in accordance with Master Plan 2, in stages
consistent with the needs of the community.

Description of Stage 1 and Future Stages

a. The Development Application relates to Stage 1 of the Shire Business Centre being
a Retail Centre of 18,300m? TUA, a Showroom/Homemaker Centre of 7,000m?
TUA and a Commercial and Business component of not more than 5,000m? TUA.

b. Future stages of the Shire Business Centre on the Land as contemplated by Master .
Plan 2.

c. Future stages of the Shire Business Centre on land other than the Land as
contemplated by Master Plan 2.

Intent re Stage 1 and Future Stages

This Agreement is intended to give the Applicant certainty as to the contributions and/or
infrastructure charges that will be payable by it or its successors in title in respect of Stage
1 and future stages of the Shire Business Centre on the Land and also to give the Council
correlative certainty as to the contribution to the community that will be made by the
Applicant.

Extent of Immunity of Future Stages of the Shire Business Centre on the Land from
Infrastructure Conditions/Charges

a. Subject to Clause 10.3b, provided that the intensity of development of a Future
Stage does not exceed Master Plan 2, and subject to the provisions of clauses 6.2.3
and 10.4, the Council agrees that having regard to the contributions and physical
infrastructure provided for in this Agreement and the Conditions of Approval in
respect of roads, cycle ways, parks, open space, nature conservation, public

Page 24

Section 27

Page 25


[OCR of page images]
 

11

10.4

10.5

11.1

Page 18

recreational facilities (land, cycle and pedestrian pathways), bushland preservation,
urban drainage, water quality, or waterway management, the Applicant and its
successors in title shall not be required in respect of Future Stages of the Shire
Business Centre on the Land to undertake work, pay contributions (by way of
conditions imposed on any application) on account of, nor to pay infrastructure
charges levied in accordance with the Act for works external to the Land relating to
roadworks, cycle ways, parks, open space, nature conservation, public recreational
facilities (land, cycle and pedestrian pathways), bushland preservation, water
quality, or waterway management.

b. The Applicant may be required to undertake work, pay contributions, or pay
infrastructure charges to the extent that the intensity of the development proposed

for a Future Stage exceeds the intensity of development envisaged under Master
Plan 2.

c. For avoidance of doubt, the references to intensity of development in Clauses 10.3a
and b have regard to the extra demand that would be placed upon infrastructure ©
through any increase in the intensity of development.

Future Stages Not Immune From Urban Water Cycle and Sewerage Headworks |
Contributions/Charges

a. Notwithstanding the provisions of Clause 10.3, the Applicant accepts that it will be
required to pay headworks charges for water supply and sewerage infrastructure
external to the Land by way of conditions or infrastructure charges, lawfully levied
at the rates applicable at the relevant time or times in respect of applications for
development approvals for Future Stages of the Shire Business Centre on the Land.

b. For avoidance of doubt, the Applicant shall not be required to pay any further
contributions or infrastructure charges for water supply or sewerage infrastructure
consequent upon the approval of further Development Applications for Stage 1
above those required by the conditions of approval. :

Future Stages of the Shire Business Centre not on the Land as contemplated by Master
Plan 2

With regard to any application for a development permit for Future Stages of the Shire
Business Centre not on the Land, whether or not made by the Applicant, this Agreement
notes that Council, at its special meeting of 30" July 2003, Council resolved that it was not
satisfied that infrastructure required by the Conditions of Approval is of such benefit to the
owner of lot 1 on RP 215933 that would require a. reimbursement by the owner to the
Applicant ,

The Council may, however, consider reimbursement to the Applicant if Council receives a
contribution other than from the Applicant toward the cost of intersection works required
by Clauses 6.2.2 or 6.2.3.
GST

Definitions

In this clause:

Page 25

Section 28

Page 26


[OCR of page images]
 

11.2

Page’ 19

“taxable consideration” means any act or thing done pursuant to or in consequence of this
document which is consideration for a taxable supply by the Council.

“consideration” has the meaning given in A New Tax System (Goods and Services Tax)
Act 1999,

“GST” has the meaning given in 4 New Tax System (Goods and Services Tax) Act 1999.
“GST Act” means the A New Tax System (Goods and Services Tax) Act 1999.

“taxable supply” has the meaning given in A New Tax System (Goods and Services Tax)
Act 1999,

Payment of GST

a. Any amount to be paid to a party (“the Supplier”) by the other party (“the
Recipient”) under this Agreement which is consideration for a taxable supply made
by the Supplier shall be increased by the amount of GST which the Supplier is
obliged to pay in respect of that taxable supply pursuant to the GST Law, the
intention being that the Recipient shall reimburse the Supplier that amount of GST in
addition to the consideration otherwise expressed herein as payable in respect of that’
taxable supply.

b. The Recipient must pay the GST contemplated in clause 11.2a:

@ on demand upon receipt of a tax invoice for the relevant taxable supply
issued by the Supplier which complies with the GST Law; and

(ii) in the same manner as the Recipient is required to pay for the taxable
supply to which the GST contemplated in clause 11.2a relates,

unless otherwise agreed by the parties.*"

c. Any amount to be paid by a party (“Reimbursing Party”) to the other party
(“Reimbursed Party”) under this Agreement which is not consideration for a taxable
supply made by the Reimbursed Party to the Reimbursing Party shall be reduced by
the amount of input tax credits to which the Reimbursed Party is entitled in respect
of the creditable acquisition for which reimbursement is being sought, the intention
being that the Reimbursing Party only reimburses the Reimbursed Party for the net
cost of the acquisition. ,

d. Without limiting the foregoing provisions of this clause 11 in any manner, if a
payment to satisfy a claim or a right to claim under or in connection with this
Agreement (for example, for misleading or deceptive conduct, misrepresentation, a
breach of any warranty, an indemnity, or for reimbursement of any damages or
expense) gives rise to a liability to pay GST, the payer must pay, and indemnify the
payee against, that amount of GST.

e. Ifa party has a claim under or in connection with this Agreement whose amount

depends on actual or estimated revenue or which is for a loss of revenue, revenue
must be calculated without including any amount received or receivable as

Page 26

=

Section 29

Page 27


[OCR of page images]
 

12

13

12.1

12.2

12.3

13:1

13.2

Page 20

reimbursement for GST (whether that amount is separate or included as part of a
larger amount).

NOVATION OF DEED UPON SALE
Restriction on the right to Sell the Land

Subject to Clause 12.3 (Restriction not to apply to subdivided Lots), the Applicant shall not
Sell the Land or a precinct within the Land as shown on. Master Plan 2, prior to the
performance and fulfilment of the Applicant's obligations under this document unless the
purchaser shall enter into a deed of novation of this document with the Council whereby
the purchaser becomes contractually bound to the Council to perform and fulfil the
provisions of this document or such of them as remain unperformed or unfulfilled by the
Applicant at the time of such Sale.

Applicant Remains Liable Until Purchaser Signs
Until the proposed purchaser executes and delivers the required deed of novation or in the

event of a Sale being made otherwise than in compliance with clause 12.1 (Restriction on
the right to Sell the Land):

a. the Applicant remains liable for the performance and fulfilment of this document

as though no Sale had taken place; and

b. the Applicant shall perform and fulfil such of its obligations under this document
as have not been performed and fulfilled immediately or at such other time or
times as the Council stipulates, even if the time or times otherwise appointed for
such performance and fulfilment have not then arrived.

Restriction not to apply to subdivided Lots _

Clause 12.1 (Restriction on the right to Sell the Land shall not apply to a Sale in the ©

ordinary course of entering into agreements to Sell Lots which conform to a design

approved by the Council and are shown on a registrable Plan for the Reconfiguring of the .

Land or a Building Format Plan consented to by the Council.
SERVICE
Service by prepaid post

A Notice is sufficiently made, given or served by a party if left at or forwarded by prepaid
post in an envelope addressed to the other party or any ‘of them (where there are more
persons than one comprising the Applicant) at the address specified in Schedule 1.

Service by post

A Notice if sent by prepaid post is deemed to have been made, given or served at the time
when in the due course of the post it would be delivered at the address to which it is
directed whether or not it is actually received.

Page 27

Section 30

Page 28


[OCR of page images]
 

Page 21

13,3 Proof of service

In proving service of a Notice made, given or served by the Council it is only necessary for
the Council to certify to that effect under the hand of the Chief Executive Officer. In
proving service of a Notice made, given or served by the Applicant it is only necessary for
the Applicant to certify to that effect under the hand of a director of the Applicant.

13.4 Form of Notice
a. A Notice given by a party must be in writing and signed by the party.

b. A Notice given by a party may be signed by an officer of that party or the solicitor for
that party.

c. A party receiving a Notice is not obliged to enquire as to the authority of the person
signing the Notice.

14 MISCELLANEOUS

14.1 * Payment of costs

The Applicant shall pay its own costs and Council’s reasonable costs of and incidental to
the preparation of this agreement.

14.2 Time
Time is, in all cases, of the essence.

14.3 Place for payment of monies

e

All monies payable to a party under this document are payable free from all deductions at
the address of that party specified in Schedule 1... - .

14.4 Waiver

No waiver by either party of any breach by the other party of any of the provisions of this
document shall be implied against the other party or be otherwise effective unless it is in
writing under the hand of the Chief Executive Officer or a director of the Applicant.

14.5 Laches and delay
No laches or delay by the Council or the Applicant at any time or times.in enforcing any of
its rights, powers and the like under this document prejudice or affect those rights or
powers.

14.6 Power of entry
The Applicant shall permit the Council and the Council's Agents authorised by the Chief
Executive Officer, at all reasonable times during the operation of this document to enter
into and upon the Land for the purposes of:

a. examining and inspecting the state and condition of the Land; and

Page 28

Section 31

Page 29


[OCR of page images]
 

14.7

Page 22

ascertaining whether the obligations of the Applicant under this document have been
duly performed and fulfilled; and

making good at the-cost and expense of the Applicant any breach of such obligations
provided that a Notice shall be given to the Applicant before such expenditure is
incurred;

exercising the Council's rights under this document to enter into and upon the Land;
and

works associated with the Walter Hay Drive Construction.

Severance

“if any provision of this document cannot be given effect or full force and effect by reason
of statutory invalidity that provision shall be severed or read down but So as to maintain
and uphold so far as possible the remaining provisions of this document.

14.8

_ Warranty of authority

Any person signing this document:

(a)

(b)

as attomey of any party warrants to the other parties that at the date of execution
that person has not received any notice or information of the revocation of the
power of attorney appointing that person; and

as an authorised officer, agent or trustee of any party warrants to the other parties
that at the date of execution that person has full authority to execute this document
in that capacity. .

14.9 Further assurances

Each party agrees at its cost to do everything reasonably necessary to give effect’to this ©

document.

14.10 Force Majeure

(a)

(b)

(c)

If a party is unable by reason of an event of Force Majeure to carry out its
obligations under this document, that party must give a Notice to the other party
advising of the event of the Force Majeure as soon as it is reasonably practicable
after the event of a Force Majeure.

If a party gives a Notice advising of an event of Force Majeure, that party’s
obligations will be suspended during the period for which the event of Force
Majeure or its effect extends.

Where the obligations of a party are dependent upon the occurrence of specified
circumstances, then the party will be relieved of its obligations for so long as there
is a change or deviation or non-occurrence of those circumstances arising from a
matter beyond the party’s control.

Page 29

oe

Section 32

Page 30


[OCR of page images]
 

14.11

(@)

()

Page 23

Amendment of document

Despite any provision of this document, the Council and the Applicant may at any
time agree to vary the terms of this document.

No modification, variation or amendment of this agreement is of any force or
effect unless:

@) it is in the form of an amendment agreement and has been signed by the
parties; and
dp where relevant the amendment agreement complies with the requirements
_ of the Act.

Page 30

Section 33

Page 31


[OCR of page images]
 

ITEM 1

ITEM 2

ITEM 3

ITEM 4

ITEM 5

ITEM 6

ITEM 7

Page 24

SCHEDULE 1 —- AGREEMENT DETAILS ‘

Date 4s rl OCTR BER, AQoos.

Name of Agreement

Council
Name of Local Government

Address of Public Office

» Applicant

Name

Address of registered office
Land

Description

County

Parish

Area

Title Reference

Address

Development Application

Noosa Shire Business Centre - Part (Lot 2 on
SP 110885) .
Infrastructure Agreement

Noosa Shire Council

9 Pelican Street, Tewantin Qld 4565

Mirose Pty Ltd ACN 010 278 118 °

Unit 10, 211 Montague Road

West End Qld 4101

Lot 2 on SP 110885

March +

Tewantin a i
50.77 hectares

50223083

Eenie Creek Road, Noosaville

Application for a Development Permit for Material Change of Use for Stage 1 of the:
Shire Business Centre on part of the Land described by metes and bounds lodged with |
the Council as Assessment Manager under the Act on 19 June 2002 as amended in
response to the Information Request on 6 November 2002.

Present Designation
Zones

Strategic Plan Designations

Future Urban and Rural Pursuits
Shire Business Centre; Rural Conservation and

Open Space — Conservation and Waterway
Protection

Page 31

Section 34

Page 32


[OCR of page images]
 

Annexure 1 — Decision Notice DA 22803 dated 18 August 2003

Page

Page 32

25

Section 35

Page 33


[OCR of page images]
 

 

 

ea Mee Formé - Negotiated Decision Notice

INTEGRATED PLANNING ACT 1997, $3.5.15, IDAS DEVELOPMENT APPLICATION

File No: 22803 DA Date of Decision: 14 August 2003
4 : APPLICANT DETAILS
Name: MIROSE PTY LTD
Postal address: ATTN: GEORGIE MOTT C/- STOCKWELL, PO BOX 3144 SOUITH BRISBANE QLD 4101
Phone no: 3004.6833 Fax no: 3004.6899 Mobile: 0402 131979

[2 PROPERTY DESCRIPTION

Street address: | NONE EENIE CREEK ROAD

Suburb/locality | NOOSAVILLE

Real property PART OF LOT 2 ON SP 110885, PARISH OF TEWANTIN, COUNTY OF MARCH
description:

13. OWNER DETAILS

 

 

 

 

 

 

Name: , JOHN S & KATHLEEN M HOFMANN
Postal address: "WEYBA RANCH" PO BOX 354 NOOSA HEADS Postcode: 4567

4. REFERRAL AGENCIES : |
Referral Agency Address ‘ Basis
Department of Main Roads PO Box 183 Gympie 4570 Advice
Department of Natural Resources & Mines PO Box 573, Nambour Qld 4560 Advice
Environmental Protection Agency Environmental Health Section Concurrence
(devolved to Noosa Council) PO Box 141, Tewantin Qld 4565

|5.__ APPLICATION TYPE |
Development Development Details Preliminary Development

Approval Permit

Material Change of Use Shire Business Centre - Stage 1 NO YES

[6 DECISION DETAILS |

 

Council on 1 May 2003, decided to:-
A. Grant a preliminary approval subject to conditions.

B Advise that the bank guarantee for $75,000 submitted as Part of the fee for the assessment of the
application, is to be called up by Council to cover the costs incurred.

In relation to the representations made about tl
Council on 14 August 2003, resolved to iss
subject to conditions.

he issue of a preliminary approval and a number of conditions,
ue a Negotiated Decision Notice granting a Development Permit,

Page 33

Section 36

Page 34


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice

i7. APPLICABLE CODES

«Not applicable,

 

8. SUBMISSIONS

3341 properly made submissions were received. 1125 not properly made submissions were received.

 

9. CONDITIONS

The approval is subject to conditions. Noosa Council's conditions are attached. The Environmental Protection
Agency conditions as a concurrence agency:are also attached.

 

i 10. | FURTHER DEVELOPMENT PERMITS REQUIRED |

Type of Development Permit required
Building Works

Operational Works

Subject of the required Development Permit

Shire Business Centre - Stage 1

Roadworks, landscaping, car parking and access, frontage

works, stormwater disposal, sediment and erosion control and
earthworks

 

[11. _ RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

 

| 12. | ASSESSMENT MANAGER

Name: Noosa Council Signature:

Lescaneiif |

 

DEGISION:NOTIGE HISTORY.
* Original Decision:Notice t:Nay:2003. /

}s Negotiated Decision. Notice: with’ an:amendirient:to.a.
development :permit:and -anumbersof ‘conditions: 14:

  

  

 

a
DP Date: 18/08/2003

 

August:2003.

 

A o:\databaselonestop\decision.doc

Page 34

Section 37

Page 35


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice ° . 3

Kacy NOOS, Noosa Council Conditions

INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

 

 

1. Deleted.

2. All revised architectural, engineering, management plans, audits and further information required by
these conditions shall be to the reasonable satisfaction of Council and be submitted to the Council at
the cost of the applicant for approval with an application for a development permit for operational

- works or when otherwise required by these conditions. The cost of assessment of such material by
the Council or its consultants shall also be at the applicant's cost. The applicant shall implement the
Tecommendations of the approved pians and reports.

Definitions

3. For the purpose of this development permit the following definitions will apply:
MP2 - Shire Business Centre Master Plan: Stage 2 adopted by Council on 10 April 2003
OS1 — Open Space (Environmental) in accordance with MP2
OS2 — Open Space (Environmental) in accordance with MP2
OS3 — Open Space (Preservation of visual amenity) in accordance with MP2
OS5 — Open Space (Preservation of visual amenity) in accordance with MP2
OS7 — Open Space (Environmental Drainage) in accordance with MP2

Approved Plans — means the Architectural plans prepared by B+N and CCN Architects, more
Particularly described in Condition 4.2

TUA - Total Use Area as defined by the Schedule to the Planning Scheme with the exception that the
words, “plus any other area of the site which is also used or intended for use for the same purpose”
are removed from the definition.

SBC - Shire Business Centre
Approved Plans

4, With regard to the approved plans for the development:

4.1. The development shall be undertaken generally in accordance with the approved plans unless
otherwise stated in these conditions.
4.2. The drawings approved for the development are (“Approved Plans’):
Q0201.01.1b/U - Site Plan
Q0201.01.b/U - Overall Site Plan
Q0201.02.1b/S - Retail Site Plan
Q0201.03.1/S - Retail Roof Plan
Q0201.04.1/S - Retail Elevation
Q0201.04,2/S - Retail Elevation
Q0201.05/S - Retail Elevation
Q0201.06/S - Retail Sections
Q0201.07/S - Retail Sections
Q0201.08/U - Showroom Site Plan
Q0201.09.1/T - Showroom Elevations
Q0201.09.2/T - Showroom Elevations

A oAdatabase\onestop\decision.doc Page 35

Section 38

Page 36


[OCR of page images]
=
| NOOSA COUNCIL IDAS Development Application Decision Notice

_ Q0201.10b/S - Commercial Site Plan
| Q0201.11.1/S - Commercial/Business Elevations

Q0201.11.2/S - Commercial/Business Elevations
~ | Q0201.15/S - Retail Environmental Control Systems

Scale and Types of Uses

“| 5. The uses allowed on the subject site and the scale of those uses are as follows:

5.1. The shop floor space for the Retail Centre shall not exceed 18,000m?,TUA. The uses
_ | nominated on the approved plans shall generally accord with the following TUA’s:

|

‘| oo

Supermarket (Shop) 3,500 m?

Mini-Major (Shop) 1,200 m?

Discount Department Store (Shop) 6,500 m?

Speciality Retail (Shop) & Professional Offices 6,800 m2
Restaurants 200 m?

Centre Manager 115 m?

Staff Areas 50 m?

Public Toilets 150 m?

Service Station 100 m?

~ | 5.2. The uses allowed in the Retail Centre are:

|

|

| 5.3. The Showroom/Homemaker floor s

Shops

Professional Offices
Commercial Premises
Commercial Services
Restaurants

Service Station

Service Shops

Fast Food Premises
Medical Centre

Outdoor Entertainment, and

Special Purposes

TUA. The uses allowed in the Showroom component are:

i

A o:\database\onestop\decision.doc

Showroom

Commercial Premises
Commercial Services

Medical Centre

Professional Offices
Warehouse

Educational Establishment, and

Special Purposes

pace for the showroom component shall not exceed 7,000m?

Page 36

Section 39

Page 37


[OCR of page images]
| NOOSA COUNCIL IDAS Development Application Decision Notice 5

: | 5.4. The commercial and business floor space for the Commercial and Business component shall

not exceed 5,000m2 TUA. The uses allowed within the Commercial and Business component
are:

. Commercial Premises

. Commercial Services

. Medical Centre

. Professional Offices

. Warehouse

. Educational Establishment, and

. Special Purposes

Staging of Development

_ 6. With Regard To The Development Staging:-
6.1, A Discount Department Store must be constructed as part of the Retail Centre component.
_ 6.2. The 5,000m? Commercial/Business component must be constructed concurrently with the
construction of the Retail Centre component.
6.3. The Retail Centre component shall not commence until at least 40% of the proposed
- Commercial/Business component of floor space is contracted for sale or lease. Proof of the |
contracts of sale or lease shall be submitted to Council prior to the Retail Centre component
commencing use. :
_ Homemaker/Showroom components are excluded from the above provisions.

Building Design

_ 7, The building design for the Retail Centre development shall be generally in accordance with the

_ 7.3.

 

7.1,

7.2.

7.4,

7.5.

7.6.

7.7.

approved plans subject to such modifications as are required in order to address the following:

Deleted.

‘

Provide a lit continuous. pathway along the entire northern frontage of the Retail Centre to
connect the precincts on either side to the east and west of the SBC site.

A pedestrian/cycleway link is to be maintained beside the OS7 area on the westem side to
provide a north south link through the site. Once the internal loop road is completed the service
vehicles entering this area of the site are to be limited with priority maintained for pedestrians
and cyclists. Works required in order to prevent conflict between pedestrians/cyclists and
vehicles are designed by a Registered Professional Engineer and are to be implemented.

Any pathways shall remain open during business hours to allow for free unhindered access.

The detailed design treatment of the service vehicle and pedestrian/cycleway adjacent to the

* open space area (OS7) shall be provided with an application for operational works. The sealed

area beside OS7 shall be utilised as a pedestrian/cycleway providing access beside the OS7
corridor to link with the intemal ring road and other parts of the site. The treatment of this area
shall be to the satisfaction of Council.

Amenities shall be provided for the Retail Centre generally in accordance with the approved
plans and shall include provision for parent rooms.

The design shail include light-weight elements such as colorbond and timber that are consistent
with “Noosa Character” to the reasonable satisfaction of the Manager - Land Use. The applicant
shall provide a copy of the design drawings detailing the features that are consistent with
“Noosa Character’ prior to the issue of a development permit for building works.

A o:\database\onestop\decision.doc Page 37

Section 40

Page 38


[OCR of page images]
 

 

NOOSA COUNCIL IDAS Development Application Decision Notice 6

7.8. A Public Art Plan shall be submitted specifying street furniture and art forms to be provided
throughout the development prior to the issue of a development permit for building works and to
the reasonable satisfaction of the Manager - Land Use. The street furniture and art forms shall
be related to a theme that reflects the cultural heritage of the area.

The preferred approach to integrated public art is to include artist in project development teams
at the outset of capital works planning and delivery. :

The public art can involve the commission of designers to create functional items for internal
and external environments that may include, but not limited to, chairs and seating, desks and
tables, filing and storage items, lighting, door handles, carpet, textiles and fabrics, and the
design and treatment of floors, paving, walls, windows, doors, fencing, lifts and stairwells. It
can involve the purchase of existing works to be Permanently sited in public places or the
provision of community cultural facilities.

8. The building design for the Showroom component shall be generally in accordance with the approved
Plans subject to such modifications as are required in order to address the following:

8.1. The buildings and service area on this part of the site shall be relocated further from the Eenie
Creek Road and Walter Hay Drive frontages so as to allow for a 10 metre wide open space
‘area (O53) within the subject site, with the exception of the 5 metre (approximately) strip of
"service roadway in the vicinity of Showroom Building D. The existing native vegetation within

the open space area (OS3) shall be protected to screen the development from these roadways.

A 1.8 metre fence painted green is to be erected beside the service road to help screen the
‘back of house’ area.

8.2. The buildings shall not exceed a maximum length of 50 metres in any one plane without
articulation of at least 2 metres being provided.

8.3. The length of any building shall not.exceed 80 metres.

8.4. The building design shall incorporate sufficient pedestrian/cycle pathways between buildings to
provide unimpeded access to the pedestrian tunnels (existing & proposed). To this end the
following shall be provided:

8.4.1. Open space areas shall have a width of not less than 10 metres between the
buildings to allow for the proposed pathways. Pathways are to be enhanced by
landscaping comprised primarily of endemic species.

8.4.2, One open space area is to align with the existing tunnel under Eenie Creek Road
west of the existing roundabout. .

8.4.3, One open space area is to align with the Proposed pedestrian pathway under Walter
Hay Drive to the east of the existing roundabout.

8.5. Deleted.

8.6. The design shall include lightweight elements such as colorbond and timber that are
consistent with “Noosa Character’ along with some pitched roofing, roof overhangs, window
hoods and colour banding using muted earth tones generally in accordance with the
approved plans to the reasonable satisfaction of the Manager - Land Use. The applicant
shall provide a copy of the design drawings detailing the features that are consistent with
“Noosa Character” prior to the issue of a development permit for building works.

8.7. Deleted.

9. A maximum of four flagpoles are allowed to be erected within the development. The flagpoles are not
to be used for advertising purposes.

10. Deleted.

Ao:\database\anestop\decision.doc
Page 38

Section 41

Page 39


[OCR of page images]
Z NOOSA COUNCIL IDAS Development Application Decision Notice

| 11.
1

12.

— 43.

: | : 14.

. | . 15.

~ 16.

 

7

The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the
AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products -
Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2).
All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and
washing machines are excluded from this requirement.

Dedication and Management of Open Space

The applicant is required at its cost to dedicate to the Crown for environmental park purposes the land
shown hatched in red (defined by Annexure 1), labelled OS1 and OS2 {less an area of land having a
width of 40 metres adjacent to E7 on MP2, which is to remain in private ownership free from
development (Private Open Space)). This dedication will occur within 12 months of a development

permit for material change of use taking effect or Prior to the use commencing which ever is the
earlier.

Prior ‘to the use commencing, the Private Open Space shall be protected by a registered
environmental covenant, which shall ensure that the existing native vegetation is maintained to the

satisfaction of Council. The costs associated with the Preparation and registration of the covenant
shall be borne by the applicant.

A suitably qualified person in consultation with the Council shall prepare a Public Open Space
Management Plan (POSMP) for the area of land defined by Annexure 1 (referenced in condition 12)
which is to be dedicated as Public Open Space and the Private Open Space.

The POSMP shall achieve the following objectives:
15.1. The primary role of OS1 and OS2 is for conservation and waterways protection.

15.2, Vehicle access will be kept to a minimum and limited to fire and emergency vehicles and
Council maintenance vehicles. All unnecessary existing tracks and trails will be closed off and
rehabilitated and vehicle access points will be limited to as few as possible.

15.3. In genera, public access to Eenie Creek will not be encouraged.
15.4. Bicycles, vehicles, horses and other high-impact recreational activities will not be permitted in
this area.

15.5. Walking tracks or jetties will not be constructed.

15.6. Playground and picnic facilities, rubbish bins and other facilities associated with recreational
parkland will not be provided. :

15.7, Future management and maintenance shall ensure that this area is as self-sustaining as
possible.

The POSMP shall, inter alia:
16.1. include a statement of environmental values, management issues and management objectives;
16.2. include the recommendations from the Bushfire Management Plan for the Public Open Space;

16.3, include relevant information about the protection of flora, fauna and water quality conditions
contained in this approval;

16.4. identify weed control, erosion control and rehabilitation needs within the area and detail how the
necessary works shall be undertaken;

16.5. identify ail existing access points into the Public Open Space and recommend how these shall
be managed;

16.6. document any rehabilitation, planting or thinning requirements for the Public Open Space;

A a:\database\onestop\decision.doo

Page 39

Section 42

Page 40


[OCR of page images]
NOOSA COUNCIL IDAS Development Application Decision Notice . 8

: tn

- ts

21.

24,

26.

 

20.

16.7. document the likely edge-effects from which this Public Open Space is likely to suffer and their:
sources and causes, and recommend actions to avoid or minimize these; and

16.8. document all the works and items that the applicant shall undertake, or provide, to establish
and secure the Public Open Space prior to dedication.

16.9. include any fire management measures necessary for ecological purposes.
Prior to the dedication of the Public Open Space, the applicant shall:
17.1. undertake all the weed control, erosion control and rehabilitation works specified in the POSMP;

17.2. undertake the fuel reduction specified in the POSMP;
17.3. construct and/or provide ail the fire trails, fire breaks, hydrants, etc. as specified in the POSMP;

17.4. undertake or provide any other works and facilities specified as the applicant's responsibility in
the POSMP (eg. traffic barriers, gates, fencing, etc.)

With regard to the Public Open Space Management Plan (POSMP):

18.1. The applicant shal! not commence any works (e.g. construction of firebreaks, traffic barriers,
etc.) in the Public Open Space and the Private Open Space until Council approves the POSMP

18.2. The applicant shall submit the POSMP for approval by the Manager - Land Use prior to the ©
issue of a development permit for operational works for the works within the Public Open Space
and Private Open Space. Approval of the POSMP by the Manager - Land Use shall not be
unreasonably withheld or delayed, having regard to the requirements of Conditions 12 and 16.

Open Space Area (OS3) - Preservation of Visual Amenity

OS3 shalt be a minimum of 10m wide with the exception of the access points to the site where it may
be reduced to 5.0 metres and or as required by the conditions of approval.

With the exception of the area required for the bikeway and footpath to traverse OS3 and where street
plantings are proposed, all the existing native vegetation on,OS3 shall be retained.

The design and construction of the adjacent roads, drainage, buildings and other works shail not
adversely impact upon the existing native vegetation in OS3 with the exception of entry statements in
accordance with MP2 and approximately the 5 metre strip of service roadway in the vicinity of
Showroom Building D.

The species of street trees to be planted on the edge of, or adjacent to, OS3 shall be selected from
the major tree species growing in OS3. Alternatively, they shall be in accordance with the landscaping
requirements contained within this approval.

Where necessary, reinforcement plantings and/or understorey thinning shall be undertaken in OS3 to:
23.1. restart stalled regenerative processes and facilitate ecological sustainability, and

23.2. facilitate the required visual screening.

An ecologist in consultation with Council shall determine the need for, and the nature of the
reinforcement plantings and/or understorey thinning. This consultation is to occur prior to the
submission of the Site Rehabilitation Plan for the development in accordance with condition 81.

Prior to the use commencing, OS3 shail be protected by a registered environmental covenant, which

shall ensure that the existing native vegetation is maintained to the satisfaction of Council. The costs
associated with the preparation and registration of the covenant shall be borne by the applicant.

A o\databasetonestop\decision.doc

Page 40

Section 43

Page 41


[OCR of page images]
J

 

fo Lf. Le.

NOOSA COUNCIL IDAS Development Application Decision Notice 9

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

Open Space Area (OS5) - Preservation of Visual Amenity

OSS shall have a minimum width of 12m and a minimum length of 130m generally in accordance with
the approved plans. Apart from providing for the temporary access roadway, the existing vegetation
within this precinct is to be retained and shall not be disturbed to accommodate carparks, detention
ponds, firebreaks or any other infrastructure. Following the construction of the internal loop road that
provides access to this part of the site the temporary service road is to be removed and the area
reinstated in accordance with the Site Rehabilitation Plan.

Deleted.

The design and construction of the adjacent roads, drainage, buildings and other works shall not
adversely impact upon the existing vegetation in OS5 other than the temporary service road and the
impact on the existing hydrological regime on which the vegetation depends shall be minimised.

Prior to construction of the adjacent internal loop road, any clearing along the westem property
boundary for the purposes of a firebreak shall exclude the vegetation/forest within OS5.

The species of street trees to be planted on the edge of, or adjacent to, OS5 shall be selected from
the major tree species growing in OS5. Alternatively, plantings shall be in accordance with the
landscaping requirements contained within this approval.

Where necessary, reinforcement plantings and/or understorey thinning shall be undertaken in OSS to:
31.1. restart stalled regenerative processes and facilitate ecological sustainability, and

31.2. facilitate the required visual screening.

An ecologist in consultation with Council shall determine the need for, and the nature of the
reinforcement plantings and/or understorey thinning to be undertaken within OSS. This consultation is

to occur prior to the submission of the Site Rehabilitation Plan for the development in accordance with
Condition 81.

Prior to the use commencing, OS5 shall be protected by a registered environmental covenant, which
shall ensure that the existing native vegetatiori is maintained to the satisfaction of Council. The costs

_ associated with the preparation and registration of the covenant shall be borne by the applicant.

Qpen Space Area (OS7) - Environmental Drainage

The OS7 area shall be generally in accordance with MP2 and the approved plans, such that there is
no net loss in the area of continuous open space in the OS7 area to facilitate the provision of
infrastructure, but excluding the proposed future bridge.

The existing drainage way shall be included within OS7 with at least 10m of native forest on either side
of the watercourse. With the exception of:

35.1. the bikeways/pathways shown on MP2,

35.2. a revegetated (with native species) swale at the northern end of OS7,

35.3. outfalls for discharging treated stormwater into OS7 and associated erosion control works,
35.4, future bridge (subject of a future application) between retail centre and main employment
node E1

No development or construction works shall be permitted in OS7.
Deleted.
Except where necessary for development works native vegetation shall not be disturbed.

The design and construction of the roads, drainage, buildings and other works shall not impact upon
the existing native vegetation in OS7.

A o:\database\onestop\decision.doc Page 41

Section 44

Page 42


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice 10

39.

40.

41,

42.

43.

44.

45.

46.

47.

48.

49.

50.

51.

Where necessary, reinforcement plantings and/or understorey thinning shall be undertaken in os7 to:
39.1. restart the stalled regenerative processes and facilitate ecological sustainability, and
39.2, facilitate the required visual screening.

An ecologist in consultation with Council shall determine the need for, and the nature of the
reinforcement plantings and/or understorey thinning to occur in OS7. This consultation is to occur prior
to the submission of the Site Rehabilitation Plan for the development in accordance with Condition 83.

Prior to the use commencing, OS7 shall be protected by a registered environmental covenant, which
will ensure that the existing native vegetation is maintained to the satisfaction of Council. The costs
associated with the preparation and registration of the covenant shall be borne by the appiicant.

Landscaping

A suitably qualified person shall prepare a Landscape Management Plan (LMP) for the development.
The LMP shall be driven by the concept of ‘Environmental Excellence’ (as embodied in the Strategic
Plan & MP2). The LMP will .show how the development will be integrated into the existing natural
environment, and how a unique landscape character will be achieved for the SBC site and it will be to
the reasonable satisfaction of Council. This plan shall be submitted prior to an application a
development permit for operational works (landscaping).

Open space within the development is to be provided in accordance with the minimum requirements of
MP2. To this end, landscaping is to be provided so that each component of the development shall
have a minimum 10% open space of the area of any development site within a sub-precinct provided
that the sub-precinct overall shall have a minimum Open space area of 15% of that sub-precinct. For
the purposes of this condition, sub-precincts B1 & B2 may be assessed combined.

Plant species used in the landscaping will primarily be species that are endemic to the SBC site. At
least 85% of the species and 85% of the quantity of plants used in landscaping shall be endemic to
the SBC site. However, ail the visually dorninant components of the landscape plantings, that is the
‘signature species’ (eg. street trees, shade trees in car Parks and feature plantings) shall be native
species endemic to the SBC site.

Trees and other plants shall not be planted in bedrock or subsoil that will be at the surface of the car
Park areas after the proposed earthworks engineering works, In these areas, adequate soil and
drainage shall be provided for all plantings.

Fauna Protection
Elf Skink

The applicant shall update the Elf Skink Management Plan to include the recommendations of the
Environmental Protection Agency in its letter dated 20 June 2003 and it will implement the plan.

Wallum Froglets

The applicant shall incorporate into the Stormwater Management Plan and EMP any reasonable and
appropriate requirements made by the EPA with respect to the protection of and management of
Wallum Froglets and their habitat on the Shire Business Centre site.

Koala, Glossy Black Cockatoo and other Fauna
Koalas shall not be encouraged (eg. by planting food trees) to utilise OS3.

Plant species used in landscaping and revegetation works shall be selected to provide food and
habitat for local fauna (eg. Allocasuarina spp. for Glossy Black cockatoos; Banksias for honeyeaters,
etc.)

Any internal fencing on the site shall be compatible with the movement requirements of koalas and
other fauna.

No unrestrained dogs shall be permitted on site during construction.

A o:\databaselonestop\decision.doc

Page 42

Section 45

Page 43


[OCR of page images]
| NOOSA COUNCIL IDAS Development Application Decision Notice 1

_| 2

 

: | 53.
| 54.

| 55.
56.
57.

_ | , 58.
59.

60.

61,

62.

63.

64.

Vegetation Protection
Deleted.

A Risk Assessment Report (RAR) by a qualified arborist shall be prepared for all individual trees and
stands of vegetation to be retained within or adjacent to the development areas. Particular attention
will be given to retaining trees with hollows wherever practicable. The applicant shall implement the
recommendations of the Risk Assessment Report.

The existing hydrological and ecological characteristics of the downstream wetlands, poorly drained
areas and Eenie Creek shall not be altered so as to cause detriment to the existing flora and fauna.

During construction, the boundaries of the open space areas shall be clearly marked for the purpose
of preventing access into these areas thereby protecting the vegetation and habitat values.

Within the open space areas no indigenous vegetation shall be cut down, lopped, damaged, disrupted
or adversely affected, without the prior written consent of Council.

Within the development areas all areas of vegetation and individual trees to be retained shall be
clearly marked. The applicant shall ensure these areas are protected during construction.

Vegetation and individual trees to be retained in the development areas shall be healthy and vigorous.

All underground services, drainage, footpaths and other site works shall be located to minimise
adverse-:impacts on retained vegetation, particularly their root systems.

Vegetation Removal

’

Vegetation removal, tree felling and lopping adjacent to vegetation to be retained in the open space
areas and beside the vegetation adjacent to Stage 1 shall be undertaken in an environmentally
sensitive manner to avoid damaging surrounding vegetation, trees and habitat.

Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos, possums). If
wildlife species are present, the tree shall not be felled or lopped until the wildlife has left the tree.

All cleared vegetation shall be suitably processed or removed from the site by a method approved by
Council. Burning is not an acceptable means of disposal.

Weed species cleared from the site shall not be mulched. Vegetative material from weed species
shall be removed from the site and disposed of in a Council approved refuse tip.

Weed and Pest Removal

 

In order to protect the ecological values of the site the following apply:

64.1. Prior to first entering the site, all construction machinery and vehicles shall be washed down
to remove soil that may contain weed seeds, soil pathogens and pest species;

64.2. all nursery stock shall be weed, pest and disease free and certified as such by the supplier;

64.3. all imported fill, soil, gravel and other construction and landscaping materials shall be weed,
pest and disease free and certified as such by the supplier;

64.4. all mulch used on the site shall be weed, pest and disease free and certified as such by the
supplier; :

64.5. all muich produced on-site by mulching cleared vegetation and trees shall specifically

exclude material (particularly seeds) from weed species (eg. lantana, asparagus fern and
umbrella trees); and ,

64.6. the certificates referred to above are to be obtained prior to the use of the material on-site
and to be made available to Council.

A o:\databasetonestop\decision.doc Page 43

Section 46

Page 44


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice . 12

65. Soil disturbance in the open space areas shail be kept to a minimum to avoid weed proliferation.
Amenity

66. Deleted.

67. The development must be undertaken and operated in a manner that causes no detrimental effect
upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, dust or
odour nuisance or any other emissions in accordance with the nuisance provisions of the
Environmental Protection Regulation 1998. On the spot fines apply for such offences.

68. All refrigeration plant including motors, shall be situated within the building or suitably provided with
noise reduction measures and located as to prevent a noise nuisance beyond the subject land in
accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the
spot fines apply for such offences.

69. Air conditioning units shall be located in a manner which prevents noise nuisance in accordance with
the nuisance provisions of the Environmental Protection Regulation 1998 and Council's Local Law No.
12 - Control of Nuisances. On the spot fines apply for such offences.

70. An occupier of premises where there is air-conditioning equipment must not use or allow the use of
the equipment - .
(a) before 7am or after 10pm on any day if it makes noise or causes noise to be made of more

than the higher of the following -
(i) 40 dB(A); :
(ii) 3 dB(A) above the background noise level
(b) from 7am to 7pm on any day if it makes noise or causes noise to be made of more than the
lower of either of the following:
(i) 50 dB(A)
(ii) 5 dB(A) above the background noise level
(c) from 7pm to 10pm on any day if it makes noise or causes noise to be made of more than 3
dB(A) above the background noise level.
Fire Management .

71, A Fire Management Plan is required for the developed areas and a Bush Fire Management Plan for
the open space and bushland areas. These. plans are to be prepared in consultation with the
Queensland Fire & Rescue Authority to the reasonable satisfaction of the Manager - Land Use’ and will
not rely on the removal of natural vegetation within OS3, OS4, OS5 or OS7, which is otherwise to be
protected. These plans are to be finalised prior to the issue of a development approval for operational
works. The applicant is required to implement any recommendations of the Fire Management Plan
and Bushfire Management Plan. Evidence of any consultation undertaken with the Queensland Fire &
Rescue Authority is to be submitted with the plans.

Fire Management Plan (FMP)

72. The development shall be designed to incorporate all the required fire protection and control
measures and devices for the development. To this end, the FMP shall address, inter alia, the
following matters:

72.1. expected behaviour of fire;
72.2, fire hazard management actions and risk minimisation strategies;
72.3. building and road layout to reduce fire risk;
72.4, setback zones, proposed building construction methods, materials and design;
72.5. gutter treatment to avoid the collection of combustible material;
72.6. access for firefighters;
A osWdatabaselonestop\decision.doc

Page 44

Section 47

Page 45


[OCR of page images]
 

Le

Lt

NOOSA COUNCIL IDAS Development Application Decision Notice 14

76.2. Demonstrate a high level of environmental care and responsibility and be consistent with
best practice for developments of this type in similar environments.

76.3. Meet the provisions of the Queensland Fire and Rescue Authority Act 1990.

77. Deleted.
Environmental Management Plan (EMP)
78. The EMP prepared by URS and dated 5 November 2002, is endorsed as the draft EMP for the

development, as amended by the conditions of approval. The applicant shall submit an amended EMP
to the reasonable satisfaction of the Manager - Environmental Services prior to the issue of a
development permit for operational works.

79. With regard to the particular plans within the EMP, the following are to be addressed:

79.1. The applicant shall prepare a Wetland and Aquatic Ecosystem Monitoring Plan providing for
Monitoring of performance against the relevant criteria in the Wetland and Aquatic
Ecosystem Protection EMP, for the maintenance of suitable habitat characteristics for the
Wallum Froglet population. The Monitoring Plan shall be to the reasonable satisfaction of
the Manager - Land Development and Manager - Environmental Services and shall be
provided prior to the application for operational works. The applicant shall report to the
Council in writing the results of the Monitoring of performance in accordance with the
Monitoring Plan quarterly for five (5) years following the commencement of use.

79.2. The applicant shall prepare an Erosion and Sediment Control Ecosystem Monitoring Plan ~
providing for monitoring of performance against the relevant criteria in the Erosion and
Sediment Control Ecosystem Protection EMP, for the maintenance of suitable habitat
characteristics forthe Wallum Froglet population. The Monitoring Plan shall be to the
reasonable satisfaction of the Manager - Land Development and Manager - Environmental
Services and shail be provided ‘prior to the application for operational works. The applicant
shall report to the Council in writing the results of the monitoring of performance in
accordance with the Monitoring Plan on a quarterly basis for five (8) years following the
commencement of use.

79.3. The applicant shall prepare a Water Quality Ecosystem Monitoring Plan providing for
monitoring of performance against the relevant criteria in the Water Quality Ecosystem
Protection EMP, for the maintenance of suitable habitat characteristics for the Wallum
Froglet population. The Monitoring Plan shall be to the reasonable satisfaction of the
Manager -Land Development and Manager - Environmental Services and shall be
provided prior to the application for operational works. The applicant shall report to the
Council in writing the results of the monitoring of performance in accordance with the
Monitoring Plan on a quarterly basis for five (5) years following the commencement of use.

79.4. The applicant shall prepare a Soil Contamination and Groundwater Protection Monitoring
Plan providing for monitoring of performance against the relevant criteria in the Soil
Contamination and Groundwater Protection Monitoring EMP, for the achievement of the
control strategies of the Stormwater Management Plan in respect to the influence of
groundwater on the Wailum Froglet habitat. The applicant shall report to the Council in
writing the results of the monitoring of performance in accordance with the Monitoring Plan
on a quarterly basis for five (5) years following the commencement of use.

80. The applicant shall commission an independent audit of the Proposed designs and site layout to
demonstrate compliance with the EMP by suitably qualified Environmental Auditor. The audit shall
conform to ISO 14010 and ISO 14011 - Guidelines for Environmental Auditing and shall be to the
Teasonable satisfaction of the Manager - Environmental Services and shall be submitted prior to the
issue of a development permit for operational works.

81. The Environmental Management Plan shall incorporate the requirement for monthly environmental
Compliance monitoring and annual audit reports to be submitted to the Manager - Land Development

for the construction stages of the development. The format and content of these reports shall be in
hard copy and digital form, generally in accordance with the following:

81.1. include tables of the monitoring results (digital form should be in Excel);

A o:\database\onestap\decision.doc Page 45

Section 48

Page 46


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice 13

73,

74,

75.

76.

72.7, access between structures and vegetated areas:

72,8. fire suppression and evacuation Procedures;

72.9. landscaping measures to reduce fire risk;

72.10. fuel load management and hazard reduction within landscaped areas;
72.11. required infrastructure — vehicle access tracks, firebreaks, hydrants, etc;
72.12, maintenance requirements for the above infrastructure;

72.13. how fires will be prevented from crossing from development precincts into the adjacent
bushland and open space areas;

72.14. coordination with other relevant organisations and agencies;
72.18. owners and operators training and responsibilities;
72.16. specific implementation procedures and responsibilities.

The applicant, future owners and tenants will implement this Plan.
Bushfire Management Plan (BMP) :

The FMP prepared by Les Hawkes of the Consultancy Bureau, dated March 2003, and forming part of
the application is endorsed as the draft BMP. However a revised BMP is to be prepared that
documents, inter alia, the following matters:

74.41. expected behaviour of bushfires;

74.2. fire hazard management actions and risk minimisation strategies;
74.3. access for firefighters;

74.4. fuel load management in all bushland and open space areas;

74.5. how ecological values, habitat values and the visual and amenity values of the vegetation
will be retained/protected;

74.6. required firebreaks, fire trails, access points and fire hydrants, etc. in bushland and open
space areas;

74.7. maintenance requirement for the above infrastructure;

74.8. how bushfires will be prevented from spreading into adjacent areas, including the Noosa
National Park;

74.9. Coordination with other relevant organizations and agencies;

74.10. specific implementation procedures and responsibilities,

74.11. the amended position of the western fire break to avoid vegetation protected within OS5.

The BMP shall be implemented by the applicant/owner.

Both the FMP and BMP shall:

76.1. include drawings at the same scale (1:2000) showing the location and dimensions of all
firebreaks, fire brigade access roads and access points, location of fire hydrants, building

set-back requirements, etc. for the construction and Operation stages of the Stage 1
development.

A o:\databaselonestop\decision.doc

Page 46

Section 49

Page 47


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice : 15

82.

83.

84.

85.

86.

81.2, include individual charts plotting the results for all parameters required in the monitoring
(digital form should be in Excel);

— 81.3. include a brief written discussion of the results and recommend any necessary actions

The Environmental Management Plan shall incorporate the requirement for three monthly
environmental compliance Monitoring and annual audit reports to be submitted to Council for the
operational stage of the development. The reporting on the operational stage will continue for a period
of five (5) years from the commencement of the use. The format and content of these reports shall be
in hard copy and digital form, generally in accordance with the following:-

. include tables of the monitoring results (digital form should be in Excel);

. include individual charts plotting the results for all parameters required in the
monitoring (digital form should be in Excel);

. include a brief written description of the results and recommend any necessary
actions. -

Site Rehabilitation Plan (SRP)

A sultably qualified person shall prepare a SRP for the open space areas (OS3, OS5 and OS7) and
water quaiity/quantity contro! devices such as swales. The SRP shall be prepared and submitted prior
to the issue of a development approval for operational works and shall be to the reasonable-
satisfaction of the Manager - Land Use.

The SRP shall spécify actions to be undertaken to restore the natural ecological processes and
facilitate ecological sustainability of the OS3, OS5 and OS7 areas. They shall include, inter alia:

84.1. the need for thinnirig dense fire-induced undergrowth that has stalled natural regenerative
Processes,
84.2, the need for reinforcement plantings to ameliorate structural deficiencies, biodiversity

deficiencies or habitat deficiencies, and
84.3. the required visual screening.

The SRP shall contain specific actions to be undertaken for the water quality/quantity devices to re-
vegetate these areas using species endemic to the site so that they become viable and efficient
structures in terms of stormwater management, as well as self-sustaining ecosystems.

The SRP shall detail the work required to be undertaken and shall detail, inter alia:
86.1. site preparation;

86.2. construction materials and details;

86.3. weed control;

86.4. planting layouts and species;

86.5. erosion and sediment control;
86.6. planting out procedures and horticultural requirements;
86.7. mulching procedures (if any);

86.8, fertilising procedures (if any);
86.9. irrigation and watering requirements;
86.10. on-going maintenance; and

86.11. environmental safeguards.

A oldatabaselonestop\decision.doc Page 47

Section 50

Page 48


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice 16

87.

88.

89.

90.

91.

92.

93.

Advertising, Signage and Entry Statements

An Advertising Management Plan (AMP) shall be prepared for the development detailing the nature
and type of advertising to be provided on site and shall include:

87.1. the size and types of advertising proposed,
87.2. the types of building materials to be used,

87.3. the types, size, and locations of any ‘entry statements’ including the use of existing
vegetation and landscaping,

87.4, the level of illumination, and
87.5, how the signage integrates with the built form and open space areas on the site.

The AMP shall be provided to the Council prior to the issue of an approval for operational
works for the erection of any advertising devices over the site and shall be to the
reasonable satisfaction of the Manager Land Use. The applicant shall implement the
Advertising Management Plan.

All advertising signage shall accord with Council’s Local Law No. 16 - Control of Advertising. To this
end the applicant shall be permitted to erect 2 pylon signs at the entry points shown on the approved
site plan. Further, 1 pylon sign is permitted on the showroom site at the centre of the frontage to the
internal loop road. oe

Telecommunications

 

,

The provision of high-speed telecommunications infrastructure is required for the development.
Provision for full broad band capacity within the subject site to every tenable area is to be provided
that gives access to broadband infrastructure capable of providing at least 150Mbit/s. Such capability
is to be provided either by underground conduit or other low visual impact method. The jintra-site
broadband infrastructure shall connect to a suitable external broadband network.

Energy Efficiency

The applicant shall provide a report detailing what measures have been undertaken with the detailed
design of the development to implement the strategies suggested in the Noosa Shire Business Centre
Energy Efficiency Assessment Report prepared by Parsons Brinckerhoff dated April 2003. Further the
report will detail how the development proposal complies with the energy efficiency conditions
Contained in this approval and will also examine the viability of delivering at least one third of the
Centre's energy requirements through renewable energy technology. The report is to be submitted
prior to the issue of a development permit for building works and shall. be to the reasonable
satisfaction of the Manager Land Use.

The design of building over 2,500m* gross floor area shall meet the Performance Criteria of the
Brisbane City Council's City Plan 2000 ~ Energy Efficient Code {in effect as at April 2003). Design
which meets the Acceptable Solutions of the Code shall be deemed to satisfy this condition. Design
which does not meet the Acceptable Solutions of that Code, but which otherwise reasonably responds
to the Performance Criteria using the alternative mechanism provided in the Parsons Brinckerhoff (PB)
report (April 2003), shall be deemed to satisfy this condition. This requirement excludes retail
speciality tenancies and display areas within the showrooms.

The design of buildings less than 2,500m? gross floor area shall meet the Performance Criteria set out
in the “Design for Climate” Energy Efficiency Policy of the draft Gold Coast City Planning Scheme (as
at April 2003). Design which meets the Acceptable Solutions of that policy shall be deemed to satisfy
this condition. Design which does not meet the Acceptable Solutions of that policy, but which
otherwise reasonably responds to the Performance Criteria using the alternative mechanism provided
in the Parsons Brinckerhoff report (April 2003), shall be deemed to satisfy this condition. This
requirement excludes retail speciality tenancies and display areas within the showrooms.

Use of lightweight building materiais is to be maximised wherever practicable. Hythermal mass
external walls shall be insulated and/or shaded from direct sunlight. The use of pre-cast concrete
slabs is to be minimised where practicable.

A :\database\onestop\decision.doc

Page 48

Section 51

Page 49


[OCR of page images]
 

NOOSA COUNCIL {DAS Development Application Decision Notice 17

94.

95.

96.

97.

98.

99.

100.

101.

102.

103.

104.

105.

106.

107.

108.

The design of the evaporative cooling system shall seek to optimise energy efficiency by identifying
and maximising the advantage of the prevailing winds at the site.

Spectrally selective and/or low emissivity glass shall be incorporated where appropriate in the detailed
design, so as to reduce heat transmission to and from buildings.

Hot water requirements of the site are to be provided by solar powered hot water systems, heat
pumps, or heat recovered from refrigeration or air-conditioning systems subject to compliance with
relevant health regulations. Where it is demonstrated to be satisfactory by the Manager —
Environmental Services that such technology is impracticable, five star solar gas hot water will be
accepted as an alternative.

The developer shall seek to apply the energy efficiency strategies listed at Table 5.1 of the Energy
Efficiency Assessment report where appropriate in the detailed design of buildings.

Use the Australian Greenhouse Building Rating System (AGBR) scheme to rate the greenhouse and
energy performance for commercial/business precinct of the NSBC.

The developer shall prepare and implement a Building Energy Performance Management and

’ Monitoring Plan (‘BEPMMP”) to the reasonable satisfaction of the Manager Land Use, dealing with

Programmed time controlled scheduling for alt areas capable of separable operation, demand
management, trend logging, energy usage monitoring and reporting and exception events reporting.
The developer shall report to the Council in writing the results of the monitoring of performance
against the BEPMMP on the first, second and third anniversaries of the commencement of use Stage
1 of the NSBC, The report shall note the strategies and recommendations of the Parsons Brinckerhoff
report (April 2003) that have been carried through to the development.

Deleted. ,

The proposed wind catcher ventilation shafts shall be designed to achieve optimal internal ventilation
of buildings consistent with acceptable standards of comfort.

The developer will design tenancy agreements to ensure that any self-contained commercial
refrigeration used on site will meet any mandatory minimum energy performance standards for self-
contained commercial refrigeration to be introduced from July 2005. The developer will also design
tenancy agreements to ensure that in general all appliances used on site are as energy efficient as
possible. .

Waste Management & Recycling

The applicant must provide a suitably screened imperviously paved area large enough for all refuse
and recycling containers for each building complex. A wash down area is Ttequired with a cold-water
tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent
stormwater entry to the sewerage system.

Refuse containers must be provided in accordance with the requirements of the Environmental
Protection (Interim Waste) Regulations 1996 and (Waste Management) Regulation 2000, for the
storage and collection of refuse.

The development must allow refuse-loading areas to be located off street. All vehicles associated with
the collection of waste/recyclables, shall enter and leave the site in a forward direction.

The applicant is to ensure that operational procedures are in place for the prevention of wind blown-
litter on the site during both the construction and operational phases of the development.

Street litterbins and recycling bins to a design approved by Council, shall be supplied and installed at
the applicants expense at agreed locations.

The applicant shall submit a Waste Management Plan (WMP) for the construction phase of the
development prior to the issue of a development permit for operational works. The WMP shail be to
the reasonable satisfaction of the Manager Environmental Services, and shall contain information
generally in accordance with the following:-

 

L

MATERIALS ON-SITE DESTINATION

A c\dalabaselonestop\decision.doc Page 49

Section 52

Page 50


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice 18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Re-use and Disposal
Recycling
Expected waste | Estimated volume | On-site Off-site *specify contractor
materials (m3) “specify proposed | *specify and landfill site
re-use or on-site | contractor and
recycling methods | recycling
outlet
Excavation material
Garden Organics
Bricks
Concrete
Timber-piease
specify
Plasterboard
Metals - please
specify
Other - please
specify
* Note: Details of site area to be used for onsite separation, treatment and storage (including weather

protection) shall be provided on the plan drawings accompanying your application.
The applicant shall implement the requirements of the WMP.

109. The applicant shall submit a WMP for the operational stages of the development prior to the issue of a
development approval for operational works. The WMP shail be to the reasonable satisfaction of the
Manager — Environmental Health, and shall contain information generally in accordance with the
following:

109.1. The estimated waste volumes, area for tefuse/recycle storage and service access.

109.2. The types of waste that will be generated from the activities approved within the
development.

109.3. Anticipated volumes or tonnage of waste generated from the activities.
109.4. Identification of the recyclables within the generated waste stream.
109.5. _Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.

109.6. Operational procedures for the storage and collection of waste from the development
complex including the collection of recyclables.

109.7. Design detail of waste storage and recycling areas including methods of prevention of storm
water contamination.

109.8. Details of types of waste storage containers to be utilized.
109.9. Detail of access to waste collection area for waste collection vehicles.

The applicant shail implement the requirements of the WMP.
Environmental & Health Issues

 

110. Approval for the Underground Petroleum Storage System must be obtained under the Dangerous
Goods Safety Management Act 2001 and the Environmental Protection Act 1994. The application for
such approval shall be lodged with Council’s Environmental Heaith Section and shall include an
assessment by a competent person of the site’s class pursuant to the “Operators Compliance Guide
for Petroleum Product Storage”.

A o:\databaselonestop\decision.doc
Page 50

 

Section 53

Page 51


[OCR of page images]
 

 

NOOSA COUNCIL IDAS Development Application Decision Notice 19

111,

112.

113.

114.

115.

116.

117.

118,

119.

120.

121.

122.

123.

124.

An annual licence is to be obtained from Council's Environmental Health Section with respect to the
storage of flammable or combustible liquids in excess of the minimum amounts permitted under the
Dangerous Goods Safety Management Act 2001. Application for such a licence is to be made prior to
the issue of a development permit for building works.

In regard to any food premise an annual licence and registration of the premises is required under the
Food Hygiene Regulations of 1989 from Council’s Environmental Health Section where unpackaged
food is sold, prepared, packed, stored, handled, served or supplied for sale.

In regard to any hairdresser or beautician establishment an annual licence is required under the
Health Regulations 1996 from Council’s Environmental Health Section where hairdressing or skin
penetration is to be performed on the premises. .

The applicant is to submit two (2) sets of professionally drawn scale plans in compliance with
Council's Code controlling food establishments for approval by Council’s Environmental Health
Section, for any food premises proposed to be included in the development. Approval is to be
obtained prior to fitting out the building.

For café or restaurant the applicant must provide toilets for customers and staff in accordance with the
Building Code of Australia.

Separate plans are to be submitted detailing the location and outlet for any mechanical exhaust
system. The installation of any mechanical exhaust system is to comply with AS 1.668.2 and AS
1668.1.

The applicant is to submit two .(2) sets of professionally drawn scale plans in compliance with
Council's Code: controlling hairdressing premises for approval by Council’s Environmental Health
Section, for any hairdressing or skin penetration premises proposed to be included in the
development. Approval is to be obtained prior to fitting out the building.

The Environmental Protection Regulation 1998 and Local Law No.12 prevents a builder or building
contractor carrying out building work on a building site in a way that makes or causes audible noise to
be made from the building work on:-

(a) Monday to Saturday, before 7:00am or after 6:30pm
(b) Sunday or public holiday, at any time.

,

A maximum penalty of $1,500 applies to an offence under this legislation.

In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it could
reasonably be expected to move into a roadside gutter, stormwater drain or a water course. On the
spot fines apply for such offences. .

For any medical center established on the site a clinicat waste service is required for the activities,
The operator is required to arrange with a licensed clinical waste contractor for the commencement of
such service.

Trade Waste,
The bin washing area is to be roofed and the floor is to fall to a bucket trap with the waste pre-treated

by a grease arrestor prior to discharge to the sewer. Rainwater is to be excluded from the bin washing
area. Bin-washing is to take place only at the bin washing area.

Full truck access is to be provided to each grease arrestor and/or pre-treatment device for cleaning
and servicing. Where access is restricted, a pump out line is required.

Liquid waste generated by industry, small business and commercial enterprises is referred to as Trade
Waste.

Council approval must be gained prior to the discharge of Trade Waste to Council's sewerage system.
Approval may be granted through the issuing of a Trade Waste Permit.

Aa:\database\onestop\decision.doc Page 51

Section 54

Page 52


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice 20

125.

126.

127.

128.

129.

130.

131.

132.

133.

134,

River Flooding

135.

136.

137.

All Trade Waste requirements including pre-treatment devices must be shown on hydraulic plans
submitted to Council for approval.

Trade Waste requirements must be in place, inspected and approved prior to commencement of
trading or operation.”

All trade waste pre-treatment devices must be easily accessible for servicing purposes.
Building Services

The applicant shall comply with the Disabled Discrimination Act (DDA) requirements: in relation to the
installation of disabled access and the provision of disabled facilities, and access to this building and
the provision of sanitary facilities shall comply with the requirements of Section D Part D3 and Section
F Clause F2.4 of the Building Code of Australia.

A Plan for equitable access for patrons of the development shall be prepared in consultation with
Council's Equitable Access Reference Group prior to the issue of a development permit for building
works to the reasonable satisfaction of the Manager - Land Use.

General conditions

 

Any fencing provided in conjunction with the development is to be setback an average of two (2)
metres to any internal road frontage. Fencing shall not be installed within OS3.

Deleted.

Existing trees on the site and within road reserves are to be retained, except where removed due to
building operations or the conduct of the approved use. The landscape plans are to denote areas of
existing vegetation or existing trees to be retained. To this end, the design of the internal loop road,
pedestrian and cycleways, and swales within the development may meander in order to facilitate the
retention of any existing vegetation where practicable within the proposed loop road area.

Security

Security in the form of a cash bond or trading bank guarantee to the sum of $500,000 must be
submitted, to secure performance of all conditions of this development permit, prior to the issue of a
development permit for operational works. If Council is required to draw against this guarantee, the
applicant will be required to ‘top up’ the guarantee until an amount of $500,000 has been secured.
The total amount of security required to be submitted to Council shall not exceed $1,000,000. The
cash bond or trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing this development permit.

Currency

This development permit lapses 4 years after the Development Permit takes effect.

No development is to be undertaken below the Q100 line indicated on Stockwell Drawing
Q0201.01b/P dated 19th March 2003.

Eenie Creek Road

Prior to the use commencing the applicant shall, at no cost to Council, construct two additional traffic
lanes on Eenie Creek Road between Eumundi Road and Reef Street, to Council's reasonable
requirements, all engineering standards to be generally consistent with those applicable to the existing
two lane construction and include works-associated for an intersection to the SBC off Eenie Creek
Road required by Condition 138.

The use shall not commence until 34 January 2006 or until both Eenie Creek Road Stage 2 between
Reef Street and Cooyar Street and Walter Hay Drive between Emu Mountain Road and Eenie Creek
are operational to traffic as two way, two lane roads, whichever first occurs.

Ao:\database\onestop\decision.doc

Page 52

Section 55

Page 53


[OCR of page images]
 

140.

— 145.

147.

 

A o:\database\onestop\decision.doc

138.

139.

141.

142.

_ 143,

144.

146.

NOOSA COUNCIL IDAS Development Application Decision Notice . 24

The applicant shall design and construct, at no cost to the Council, a Priority controlled intersection

providing for all turns except right turn egress providing access to the proposed development from
Eenie Creek Road. ,

The intersection and alt associated works providing for connection of the pavement and stormwater
drainage infrastructure to the Eenie Creek Road infrastructure to be constructed pursuant to condition
136, shall be constructed prior to the commencement of the use under a Development Permit, and
shall be to the reasonable satisfaction: of the Manager Land Development. The geometric design
should not preclude future upgrading of this intersection to a two lane-circulating roundabout which
may be developed in conjunction with future stages of the SBC.

Walter Hay Drive

The applicant shall dedicate as road reserve, at no cost to the Council, sufficient and from lot 1 on SP
100885 for the construction of Walter Hay Drive in accordance with Council's approved alignment
generally as indicated in the planning and design concept for Walter Hay Drive, approved by Council
on 1 May 2003, as further modified by GHD plan 41-12240-C027 revision B or as subsequently
approved by Council for the detailed design.

The applicant will meet Council’s reasonable design costs and construct a northern roundabout on
Walter Hay Drive and two additional lanes between that roundabout and Eenie Creek Road in
accordance with Council's approved alignment generally as indicated in the Planning and design
concept for Walter Hay Drive, approved by Council on 1 May 2003, as further modified by GHD plan
41-12240-C027 revision B or as subsequently approved by Council for the detailed design. The
applicant will also undertake all design and construction required to accommodate the necessary
changes in alignment to provide access and roadway capacity associated with this development

Possible Agreement

Deleted.

The applicant will construct the section of the internal loop road that is part of Stage 1 of the SBC
generally in accordance with the approved plans. Working drawings in respect of the internal loop
toad shall provide road widths suitable for accommodating the traffic loadings expected, allowing
manoeuvring of all vehicles including articulated and accommodating cycle and pedestrian paths
generally in accordance with Council's Engineering Standards for roads of that type shall be to the
reasonable satisfaction of the Manager of Land Development and shall be submitted with the
application for operational works. Road pavement widths shall be reduced where possible to enable
retention of vegetation. .

The design of all sections of the internal loop road shall be consistent with Council's normal design |
standards, to facilitate possible future dedication of the loop road and the connections to the external |;
site access intersections. *

Internal roadways between the site access intersections on Walter Hay Drive and Eenie Creek Road
and the roundabouts on the internal loop road shall be constructed as four lane divided roads and
provide queue space of not less than 80 metres between intersection stop or give-way lines for both
entry and exit vehicles.

Roundabouts constructed on the internal loop road shall have a minimum diameter that allows the
largest vehicles required to access the SBC to negotiate them in an acceptable manner, generally in
accordance with drawing 4024/S18 Issue A prepared by MPN Consulting Engineers.

Intemal car park and service roadway access driveways to and from the internal loop road shall be
located as if the loop road was a public road, with driveways located clear of roundabout queue areas,
pedestrian crossings, etc, generally consistent with AS2890.1

Access to the existing childcare centre on the adjacent Property (Lot 1 on RP 215933) shall be
retained at all times by the applicant. Should the existing access be affected by roadworks, an
alternate access is to be provided. Such access may be considered in the detailed design for the
construction of the westbound lanes of Eenie Creek Road between the access intersection to the SBC
and Eumundi Road as required by the conditions of this approval to the reasonable satisfaction of the
Manager - Land Development.

Page 53

Section 56

Page 54


[OCR of page images]
 

 

NOOSA COUNCIL IDAS Development Application Decision Notice 22

Public Transport

148. The applicant shall make provision for bus stops and bus routes on and through the subject site
without traversing through carpark areas, in accordance with the reasonable requirements of Council
and Queensland Transport. Such facilities should not compromise the possible future development of
a regional bus interchange in area E6 of MP2 :

149. Provision shall be made for the provision of public transport vehicles with their own access road
separate to parking isles other than staff carparking and clear of internal traffic queues or congestion
Points generally in accordance with the approved plans for the development..

150. Provision shall be made immediately- adjacent to the retail centre for a taxi rank able to accommodate
at least six taxis. This rank shall be located in an area close to major pedestrian routes and where
after-hours lighting and security will be maximised, under cover. The rank should include provision for
dedicated phone connections to local taxi companies. Further provision for the bus spaces as shown
on the approved plans shall be maintained..

151, Provision shall be made for state of the art electronic advice notices to advise patrons of the timing of
Public transport services at the public transport set down and pick up area.

Car Parking

152. Carparking for the proposed development shall be generally in accordance with the approved plans
and the following: .

152.1, Retail Centre at a rate of 5.4 spaces per 100m? of shop floor space TUA — 1000 spaces.

152.2. Showroom Component at a rate of 1 space per 36m? of showroom/homemaker floor space
TUA — 196 spaces.

152.3. Commercial/Business Component at a rate of 1 space per 23m? of commercial/business
floor space TUA - 217 spaces.

153. Deleted

154. The car park for the Retai! Centre and Showroom shall meet the objectives of MP2 3.5 (j).

155. The applicant shall ensure the carparking layout for the proposed development prevents conflict
between public transport, delivery and service vehicles and visitors cars generally in accordance with
the approved plans. .

166. Aisle lengths in the car park in the B3 showrooms shall be maintained in accordance with the
approved plans to the satisfaction of the Manager Land Development..

157. The car parking area shall be drained and the pavement (pervious and impervious) constructed to
access road standards to the reasonable satisfaction of the Manager - Land Development. Plans and
specifications for these works shall be submitted with and application for a development permit for
operational works.

158. All car parking shail be kept maintained and line-marked in a condition fit for use.

159. Disabled parking spaces shall be provided for each development component in accordance with the
requirements of AS2890.1, in respect of the number, design and location of these spaces.

160. The design of the car parking areas will comply with the Australian Standards AS 2890.1 and AS
2890.2.

Loading Areas

161. Deleted.

162. Deleted.

A o:\database\onestop\decision.doc

Page 54

Section 57

Page 55


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice 23

163.

164.

165.

166.

. 167.

168.

169,

170.

171.

172.

173.

All infrastructure shall be kept clear of the OS3 area including the service roadway (with the exception
of the 5 metre area at the western end of building D of the Showroom Component) and the garbage
collection area. Should part of the existing road reserve adjoining the subject site to the north be
included into the site following the dedication of the land for proposed Walter Hay Drive, it is accepted
that this area of land can contribute towards the OS3 buffer area to satisfy the requirement for the
provision of OS3 under this development permit.

Deleted.
External Works Other Than Roads

. Any necessary stormwater drainage systems required by the any external roadworks fronting the

Proposed development as required by these conditions of approval, will need to be constructed by the
applicant as part of those works to the reasonable satisfaction of the Manager Land Development.

Any necessary augmentation or installation of services will also need to be undertaken by the
applicant as part of this development to the reasonable requirements of the Council, The services will
need to be able to cater for the ultimate development of the SBC.

Pedestrian/Cycle Access

The applicant shail undertake ail work indicated on Pedestrian and Cycle Management Plan submitted
as Annexure 6 as part of the representations to the decision notice issued 1 May 2003. The applicant
shall construct all cycleways and pathways as shown on the Pedestrian and Cycle Management Plan.
To this end, the applicant is required to construct a shared pedestrian and cycleway pathway in lieu of
the pedestrian pathways indicated in black on the Pedestrian and Cycle Management Plan.

The applicant will design and construct all works required by the approved Pedestrian and Cycle
Management Plan for the SBC, subject to any modifications required by these conditions of approval.

The applicant will construct access from the SBC pedestrian and cycleway links to the existing
pedestrian/cycleway under Eenie Creek Road, which meets disabled access tequirements and has
good sight lines into the pedestrian/cycleway tunnel under Eenie Creek Road generally in accordance
with option 2 on plan 4024 S26B by MPN Consulting Pty Ltd.

The applicant will design and construct access from the pedestrian and cycleways shown on the
Pedestrian and Cycleway Management Plan to the proposed pedestrian/cycleway under Walter Hay
Drive, which has good sight lines into the structure. The applicant will be required to contribute 50%
towards the cost of the pedestrian/cycle underpass proposed under Walter Hay Drive.

The applicant will design and construct the external pathways for cycles and pedestrians on Eenie
Creek Road from Noosa Eumundi Road to the SBC access as part of this development.

Stormwater Drainage & Water Quality

A Stormwater Management Plan for the site including revegetation and remediation shall be prepared
and submitted prior to the issue of a development permit for operational works to the reasonable
satisfaction of the Manger Land Development. The Stormwater Management Plan shall be generally in

accordance with URS's Report of 19 June 2003” and include “and shall be implemented by the
applicant. ,

The Stormwater Management Plan will address the following:
173.1. Deleted.

173.2. Gross pollutant traps shall be installed inline on the piped systems for all paved areas that
do not fall to the proposed bio-retention devices prior to the run off entering OS7;

173.3. All primary treatment of runoff will be outside the open space area OS7 to ensure
compliance with MP2;

173.4. Deleted.

173.5. The bio-retention areas within the car parks must be large enough to allow the proposed
planting to thrive and have a viable root system;

A :\dalabase\onestop\decision.doc Page 55

Section 58

Page 56


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice 24

173.6.

The detailed design of the stormwater management system shall provide for water reuse
within the site so as to ensure that the hydrology of the open space areas is maintained
while using a reasonable quantity of excess water generated by the development within the
site for non-potable purposes such as landscape watering generally in accordance with the
Concept Stormwater Management Plan to the reasonable satisfaction of the Manager ~-
Land Development. More detailed analysis using MUSIC or equivalent suitable software is
required to refine the water reuse assessments as well as pollution management
measures, with a one hour (maximum) time step to be used;

173.7. Deleted.

173.8. The Site Rehabilitation Plan shall provide details about the revegetation of water quality
control devices located in the OS7 area and the Landscape Plan shall provide details about
the vegetation of water quality control devices in the developed precincts. The Stormwater
Management Plan shall demonstrate that the proposed vegetation on the water quality
control devices will adequately treat the stormwater and achieve the tequired water quality.

173.9. Deleted.

173.10. Deleted.

173.11. Deleted.

173.12. Operational works stormwater management planning is to be included;

173.13. Deleted.

173.14. Deleted. ’

173.15. Details of the sediment and’ erosion control for construction management for the
development that adequately addresses the extent of site disturbance proposed;

173.16. The establishment and operational phases for the project, including at least four per year
event based water quality monitoring as detailed in the draft concept Stormwater.
Management Plan dated 19 June 2003, within the gullies of the site, and in.the receiving
waters for: . . .

. Total Nitrogen.

° Total Phosphorus.

. Suspended Solids & Turbidity.

° pH.

. Salinity.

° Temperature.

* Trash & gross pollutants.

. Algal count and identification.

° Faecal coliforms.
The applicant shall continue monitoring for a period of 5 years from completion of Stage 1.
The results of monitoring are to be submitted to Council in a digital form acceptable to the
Manager Land Development.

173.17. During the establishment and operational phases the applicant is to undertake inspections
for erosion and deposition, and build up of trash and gross pollutants, and other water
Pollution. These inspections will be carried out after significant rainfall events, and on a
three monthly campaign basis for a period of five years from completion of the final stage
of construction. Corrective measures will be implemented where indicated by such
inspections.

173.18. For the construction phase at least four per year event based water quality monitoring shall
be undertaken for:

A o:\database\onestop\decision.doc

Page 56

on

Section 59

Page 57


[OCR of page images]
[ [

ed —_— a

{

 

(. :

NOOSA COUNCIL IDAS Development Application Decision Notice

174.

175.

176.

177.

° Suspended Solids & Turbidity.
. pH.

. Temperature.

. Salinity.

. Trash & gross pollutants.

In addition to the above, inspections for erosion and deposition, and build up of trash and
gross pollutants shall be carried out on a weekly basis during the construction period and
corrective measures implemented.

173.19. An operational phase Water Quality Management Plan shall be prepared to address water
treatment device water quality maintenance requirements for stormwater management
measures and devices, contingency measures for aquatic plant growth, loss of vegetation
in swales, die off of trees and shrubs in or near any devices, pollution response and aigal
blooms and shail include a mosquito management strategy. The plan shall demonstrate
compliance with the water quality objectives set and a no worsening over the existing pre-
development situation in the site gullies, OS1, OS2 and OS4, in Eenie Creek and the
freshwater dam.

173.20. Responsibilities for all actions required in the plan are to be clearly delineated.

173.21. Non-compliance with prescribed water quality standards shall trigger the implementation of
, measures/further testing to rectify.

173.22. Monthly reports on monitoring, incidents, corrective action and plan updates are required to
be submitted to Cquncil during the construction period. These teports are to be submitted
in a form acceptable to the Manager Land Development (including digital form) and are to
highlight any non-standard results.

173.23. Yield analysis using a 3-hour (maximum) timestep MUSIC or equivalent model is required.
This analysis will need to demonstrate the effect of the proposed works on the water cycle
in OS1, OS2, OS4, OSS and OS7. This modelling shall be undertaken and submitted with
the application for operational works:

.173.24. The use of enhanced existing vegetation filtration or alternate methods not requiring.
clearing is to be used for drainage works to OSS, instead of the proposed construction
extended detention basins.

173.25. Deleted.

173.26. The bio-retention devices shall be maintained by the applicant in good working order at all
times, so as to achieve their intended purpose including periodic replacement of sand and
soils. Inspection of the bio-retention devices shall occur at least once every 5 years, and
will provide a written report to the Manager Land Development as to their condition and any
remedial action taken or proposed to be taken.

173.27. Deleted.

All stormwater design and construction on the development will be undertaken in accordance with the
approved Stormwater Management Plan.. .

The applicant is to install water quality control devices generally in accordance with the approved
Stormwater Management Plan. Detailed staging plans and specifications, based on and generally in
accordance with the Plan are to be prepared and submitted (after consultation with officers of the
Council) with the relevant applications for operational works.

All easements required on downstream properties draining the site either by way of underground
drainage or overland flowpaths shall be obtained.

A suitably qualified Registered Professional Engineer, Specialising in hydraulics shall prepare
engineering drawings and specifications for stormwater designs and shail be submitted in conjunction
with an application for a development permit for operational works (stormwater drainage). ©

A o:\databaselonestop\decision.doc Page 57

Section 60

Page 58


[OCR of page images]
 

 

NOOSA COUNCIL IDAS Development Application Decision Notice 26

178.
179.

180.

181.

182.

183.

184.

185.

186.

187.

188.

189.

190.

191.

Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties.

The stormwater discharge from the site shall be designed such that there is no net increase in the rate
of discharge as a result of the development for storm events up to 100 year ARI.

Stormwater drainage shall include measures to protect proposed allotments from run-off from or to
surrounding land. The design shall also address controls for gross pollutants, nutrient runoff, oil and
grease, and silt and sediment.

Underground stormwater systems shail be designed in accordance with Noosa Council's Engineering
Design Standards, and shall be connected, where possible to Council's existing drainage systems.

An easement of minimum width 4.0 metres shall be granted in favour of the appropriate party over any
Council maintained stormwater pipes that traverse private property.

Designs that concentrate stormwater onto adjoining tand shall require separate formal approval from
the owner of the land or relevant Government Authority. Such approval shall be submitted with the
design in conjunction with an application for a development permit for operational works (stormwater
drainage).

The design plans detailing surface levels, which shall be controlled across the site of the development
to create as major storm event overland flow path system to cater for the 1:100 year design storm,
shall be submitted in conjunction with a development permit for operational works (stormwater
drainage). Any overland flow from external catchments shall be accepted and incorporated in the
major event surface flow drainage system through the site. Overland flows shall be discharged in a
safe manner and the product of velocity time depth shall not exceed 0.4 m2/sec.

All ‘site drainage shall be by means of gravity systems.

Drainage works are to be progressively undertaken in conjunction with development of the site
generally in accordance with the approved Stormwater Management Plan. Detailed drainage plans
and specifications, based on and generally in accordance with the approved Drainage Plan, the EMP
and these Conditions, are to be prepared and submitted (after consultation with officers of the Council)
with the relevant applications for operational works.

All drainage works as required by the Stormwater Management Plan are to be provided by the
applicant at its cost.

Deleted.

A minimum floor level freeboard of 0.3m shall be provided for business, commercial and storage areas
above the top water level of the stormwater overland flows. :

Earthworks

Any excavation or filling works proposed behind the showroom development on the Eenie Creek Road
frontage is not to occur within the 10 metre OS3 area (with the exception of the 5 metre length of
service roadway at the western end of building D) to ensure the protection of the existing vegetation
within this area, with the exception of the works required to provide the pedestrian and cycleways
beneath Eenie Creek Road and Walter Hay Drive and where filling is required at the eastern end of
the showroom development to allow for the construction of Walter Hay Drive. The rehabilitation of the
OS3 area is to be addressed in the Site. Rehabilitation Plan to the’ reasonable satisfaction of the
Manager - Land Use. : :

Deleted

Deleted.

Deleted.

A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of
placing additional fill prior to such fill being placed. Batters within the loop road reserve shall be at a
maximum grade of 1:4 unless retained by a wall. In all other areas batters will have a maximum batter

as determined by a registered practicing Geotechnical Engineer in consultation with Manager Land
Development. Landscape treatment of the batters will be a Consideration in their agreed slope.

Ao:\databasa\onestop\decision.doc

Page 58

Section 61

Page 59


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice

192.

193,

194,

195.

196.

197.

198.

199.

200.

201.

202.

Fill shall be compacted to 95% relative dry density as per Main Roads De
registered practicing Geotechnical Engineer shall supervise all the placer>
that all lots have been compacted to the required standard.

Any existing fill on the site that does not comply with Council’s requiremer—
direction of the Manager Land Development prior to additional filing works <

Following completion of the filling works, the registered Practicing Geotect~—
the works shall submit compaction tests across the entire filled areas and

for each lot subject to filling. The extent of fill and each lot site classific: .
metes and bounds survey plan.

Acid Sulfate Soils

Where excavations are Proposed below R.L 5.0m AHD a report shall be
qualified person in conjunction with an application for development perr
(earthworks), to determine if acid Sulfate soils are present on site. If acid s=
site the report shall also outline the required treatment and Managemer—
accordance with the requirements of State Planning Policy 2/02 ‘Planning =
involving acid sulfate soils’. -

Erosion & Sediment Control

To protect the environment against siltation/sediment export or soil er
development, an erosion and sediment contro! plan shall be submitte=
application for a development permit for operational works (earthworks),
as silt fencing, controlled gravel access to the site and controlled dic
necessary. Prior. to commencement of building works, all physical site <
installed, and the plan adhered to.

Town Water Supply

The applicant will construct at its Cost a second feed in conjunction with the=
Hay Drive access if the anticipated loading on the system for the ultimate
equivalent of 35 tenements.

Sizes of the mains are to be a minimum of 150mm diameter and are to
analysis carried out by Councils consultants at the applicants cost.

A water supply master plan for ultimate development shall be to the satisfa~
Development and shall be submitted in conjunction with an application fo
supply). The Water Supply Master Pian will consider metering of individual
(body corporate) flows as well as the reticulation system and valving
infrastructure will be designed and constructed in accordance with the appr-
Plan.

Sewer Capacity

The applicant at its costs will construct the proposed sewer rising me
discharge to Manhole NV40/01/18 in Eenie Creek Road.

The existing sewer Pump station and rising main are to be upgraded by the
and requirements as detailed in Councils Engineering Design Manual - Wate

A Sewer Master Plan for ultimate development shall be submitted to the re=
Manager Land Development in conjunction with an application for a
Operational works (sewer works).. All sewer infrastructure will be desi
accordance with the approved Sewer Master Plan.

All internal reticulation works (both water and sewerage) are to be const=
Noosa Council Engineering Standards for Water and Sewerage (depe

Classified as private main when completed) and checked by Council

requirements as per Council standards.

A c:\detabaselonestop\decision.doc

Page 59

Section 62

Page 60


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice . 27

192.

193.

194.

195.

196.

197.

198.

199,

* 200.

201.

“202.

Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A
registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify
that all lots have been compacted to the required standard.

Any existing fill on the site that does not comply with Council’s requirements shall be removed at the
direction of the Manager Land Development prior to additional filling works commencing.

Following completion of the filling works, the registered practicing Geotechnical Engineer supervising
the works shall submit compaction tests across the entire filled areas and a site classification report
for each lot subject to filling. The extent of fill and each lot site classification shall be shown ona
metes and bounds survey plan.

Acid Suifate Soils

Where excavations are proposed below R.L 5.0m AHD a report shall be submitted from a suitably
qualified person in conjunction with an application for development permit for operational works
(earthworks), to determine if acid sulfate soils are Present on site. If acid sulfate soils are present on
site the report shall also outline the tequired treatment and management of the disturbed soils in
accordance with the requirements of State Planning Policy 2/02 ‘Planning and managing development
involving acid sulfate soils’.

Erosion & Sediment Control

To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with an
application for a development permit for operational works (earthworks). Site control measures such .
as silt fencing, controlled gravel access to the site and controlled disposal of waste, may be
necessary. Prior to. commencement of building works, all physical site control measures shall be
installed, and the plan adhered to.

Town Water Supply

The applicant will construct at its cost a second feed in conjunction with the construction of the Walter
Hay Drive access if the anticipated loading on the system for the ultimate development exceeds the
equivalent of 35 tenements.

Sizes of the mains are to be a minimum of 1 50mm diameter and are to be confirmed by a network
analysis carried out by Councils consultants at the applicants cost.

A water supply master plan for ultimate development shall be to the satisfaction of the Manager - Land
Development and shall be submitted in conjunction with an application for operational works {water
supply). The Water Supply Master Plan will consider metering of individual occupancies and common
(body corporate): flows as well as the reticulation system and valving atrangements. All water
infrastructure will be designed and constructed in accordance with the approved Water Supply Master
Plan.

Sewer Capacity

The applicant at its costs will construct the proposed sewer rising main in the development to
discharge to Manhole NV40/01/18 in Eenie Creek Road.

The existing sewer pump station and rising main are to be upgraded by the applicant to the standards
and requirements as detailed in Councils Engineering Design Manual - Water & Sewerage.

A Sewer Master Plan for ultimate development shall be submitted to the reasonable satisfaction of the
Manager Land Development in conjunction with an application for a development permit for
Operational works (sewer works).. All sewer infrastructure will be designed and constructed in
accordance with the approved Sewer Master Plan.

All internal reticulation works (both water and sewerage) are to be constructed in accordance with
Noosa Council Engineering Standards for Water and Sewerage (depending on tenure may be

A o\databaselonestop\decision.doc : Page 60

Section 63

Page 61


[OCR of page images]
 

 

NOOSA COUNCIL IDAS Development Application Decision Notice 28

203.

204.

205.

206.

207.

208.

209.

210.

211.

212.

213.

214.

Service Easements

All infrastructure shall be covered by easements where necessary to the reasonable satisfaction of the
Manager Land Development.

No building or other structure shall be constructed or encroach over an easement. Any building or
structure within proximity of an easement of Council’s or any other public utility's underground
infrastructure must have its foundations designed so that no surcharge loads are imposed upon such
underground infrastructure. Foundations must be taken down a minimum of 1m below a line of
influence measured 1m in the direction of the foundation from the centreline of the closest
underground service and along the natural angle of repose of the foundation soil type(s).

Headworks

Headworks contributions are ‘required for Water Supply and Sewerage and will be charged in
accordance with Council's Planning Policies, PSP 28 - Water Supply Headworks Contributions and
PSP30 - Sewerage Headworks Contributions. These headworks are to be paid by the applicant prior
to. the issue of a Development Permit for Building Works. An estimate only of the expected
contribution is:-

Retail Centre : $466,608.00
Showroom & Commercial/Business $260,340.00 -

TOTAL $726,948.00
General.

Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
Providers to ascertain the location of their underground services.

The applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
Pavement, footpath, kerb and gutter, or other Council property and facilities damaged as a result of
Construction of the proposed development.

Where kerb and channel is constructed at a road intersection or any other place it is provided,
disabled access shall be incorporated. .

No Council property or facility shall be interfered with during works associated with this development
without Council approval.

A Traffic Management Plan is to be prepared by a Registered Professional Engineer of Queensland
addressing safety during construction, including pedestrian safety, in accordance with the Manual of
Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks
Signing Guide. A copy of which is to be submitted to Council for their records prior to construction
commencing.

__ All designs for engineering works involving the construction of Pavements, kerb and channel, vehicular

access, footpaths, turnouts, stormwater drainage, water supply or sewerage reticulation shall be
prepared in accordance with the requirements of Council's Engineering Design Standards, shall
reference where applicable to Council’s Standard Drawings and shall incorporate best engineering
practice.

A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
Specifications for all engineering works, which shall be submitted in conjunction with an application for
a development permit for operational works.

Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to Council.

Prior to commencement of the use, or a certificate of classification being issued (whichever occurs
first), a certificate shall be submitted to Council from a registered Professional Civil Engineer of
Queensland certifying that the operational works have been inspected and no items have been
identified that suggest the work has not been completed in a workmanlike manner.

A o:\databaselonestop\decision.doc

Page 61

Section 64

Page 62


[OCR of page images]
a ns

 

NOOSA COUNCIL IDAS Development Application Decision Notice 29

215,

216.

217.

218.

219.

- 220.

221.

222.

223.

224.

225.

As Constructed drawings certified by a registered surveyor and a registered Professional Civil
Engineer of Queensland showing the extent and finished levels of the filling works are to be submitted
for Council's records, prior to the use commencing.

These drawings must fully detail levels for all engineering works including water supply and sewer
reticulation, drainage structures, building floor levels, finished ground levels effluent trenches and
Pavement surface levels. Drawings shall be on transparencies, a hard copy highlighting any changes
from design and in electronic format on an IBM PC compatible floppy disk in a format capable of
integration with Council’s computer system.

Fire hydrants are to be provided throughout the development in accordance with Council and
Queensland Fire Service standards.

Conduits and kerb markers shall be installed for all necessary service crossings of roads to Council's
satisfaction. An. "As Constructed" plan showing the locations of the conduits shall be submitted to
Council prior to acceptance of the works “On Maintenance”.

Prior to the use commencing, a State Survey Mark shall be provided within the site. It shall be levelled
and located to the requirements of the Manager - Land Development. A ‘Form 6’ shall be submitted for
Council's records.

Each State or other Permanent Survey Mark shall be installed clear of overhead vegetation, making it
Suitable for Global Positioning Equipment, and accurately connected to at least one real property
corner by a registered Surveyor.

The applicant shall satisfy all relevant requirements of the Water Act 2000.

The developer is to implement the use of small-scale solar photovoltaic powered pumps for irrigation
systems and power for outdoor lighting. The development should utilise a significant amount of
tenewable energy produced on site. .

Use of occupancy censors for HVAC, Lighting systems and Automated -Toilet Flush systems were
appropriate.

Use only native tree species for landscaping to reduce the amount of water needed to be pumped for
on site irrigation. Only drip irrigations systems or systems with similar or better water and energy
conservation qualities are to be used on site,

Development does not result in obtrusive lighting as described in the Australian Standards AS4282
“The control of the obtrusive Effects of Outdoor Lighting”. :

Rainwater is captured on site and used to irrigate garden beds and for flushing toilets. Rainwater
storage tanks should be plumed, to allow refilling from mains supply, as weil as utilize the force of
gravity for distribution.

All infrastructure within the site shall be maintained to the reasonable satisfaction of the Manager Land
Development.

A o.\database\onestop\decision.doc

Page 62

Section 65

Page 63


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice 30

CONCURRENCE AGENCY CONDITIONS (PETROLEUM PRODUCT STORAGE - ERA 12)

The development contains a service station and fuel storage, which is classified as an Environmentally Relevant
Activity Level 2. The following schedule (Schedule A) details the environmental conditions that apply to the
environmental authority for the conduct of the activity.

 

 

 

 

 

 

 

 

SCHEDULE A
Noise
41. The emissions of noise from carrying out the environmentally relevant activity must not result in levels
greater than those specified in table 1.
TABLE 1.
NOISE LIMITS AT A NOISE SENSITIVE PLACE
Period ° Noise Level at a Noise Sensitive Place measured as the Adjusted
Maximum Sound Pressure Level
Lamax adj, T
7am-10-pm Background noise level plus 5 dB(A)
10 pm - 7 am _ | Background noise tevel plus 3 dB (A)
Period Noise Level at a Commercial Place measured as the Adjusted
Maximum Sound Pressure Level
° Lamax adj, T
7am ~ 10pm Background noise level plus 10 db(A)
10 pm - 7am Background noise level plus 8 db (A)

 

 

 

 

Air

2. Where Petroleum products are to be transferred from a delivery vehicle to an underground fuel storage
tank, and where an installation receives collectively more than 520 kilolitres of Petroleum product during a
twelve (12) month period, then the underground fuel tank and delivery vehicle shall be fitted with ‘Vapour
Recovery System” equipment. Such equipment shall be installed in accordance with Australian Standard
(AS) 1940, Australian Institute of Petroleum (AIP) CP6-1986 and AIP CP4-1993.

3. The aboveground tank shall be fitted with a “pressure vacuum vaive” on the atmospheric vent. The
Pressure vacuum valve shall be set to closed when the pressure in the tank is between the design
operating maximum pressure and the design operating maximum vacuum in accordance with AS 1692.

Wastewater and other Liquid Waste

4. Wastewater and other liquid waste shall be discharged to sewer or transported to an approved hazardous
waste facility. The licensee must comply with the conditions of a current trade waste permit issued of the
site and/or conditions of an approval to transport to an approved hazardous waste facility.

5. Vehicle or equipment wash down shall not be conducted in a manner which may cause the contamination
of surface stormwater run-off.

6. Wastewater from car washing must not be directed to the stormwater and can only be directed to sewer
under the conditions of a trade waste permit.

7. Drainage from paved forecourt and areas on which a vehicle can stand while being fuelled or transferring
petroleum products, shall be directed by appropriate surface grading into grated sumps, floor silt
arrestors, floor basket arrestors, gutters and/or grated drains leading to underground drainage systems
dedicated only to stormwater runoff, which finally discharge into stormwater drainage systems as
approved by the local authority.

8. Uncontaminated stormwater from roofed areas and uncontaminated ground areas shall be directed away
from petroleum loading and dispensing areas. : .

9. Wastewater and other liquid waste shall not be discharged or released to waters.

A a‘ldatabaselonestop\decision.doc Page 63

Section 66

Page 64


[OCR of page images]
 

NOOSA COUNCIL IDAS Development Application Decision Notice : 30

11.

12. Provide a notice adjacent to the bund valve displaying the following:

13. “Bund drain valve to be kept closed and locked’

14. — Minor spills shall be controlled by use of absorbent material such as rags, kitty litter or similar and
disposed of with industrial refuse.

15. Provide fill point to aboveground tank inside bund containment with a dry break coupling or spill tray to
prevent incidental spill during refueling.

16. Clean and maintain bund compound ‘integrity at all times.

Solid Waste

17. All solid waste shall be removed from the Premises to an approved waste facility by a licensed waste
transporter. i

General .

18. — All storage of flammable and combustible liquids must be stored in compliance with Australian Standard

_ AS 1940 - 1993 “The Storage and Handling of Flammable and Combustible Liquids”. If storage limits
exceed minor storage, then an application for licence for the storage of flammable and combustible liquids
must be lodged with the local authority. « .

19. Develop an inventory control system. Such inventory control measurements shall be reconciled by
comparing product and water level! measurements with dispenser metre readings and deliveries. The
reconciliation shall be conducted for each individual tank each day that product is added or removed from
the underground storage tank. The inventory control computations on any loss or gain of product shall be
included with a monthly summary of cumulative losses or gains of product.

Note: Inventory control records and reconciliation data shall be:
a) maintained and kept on site

b) kept in an acceptable manner and format

c) made available to the administering authority ‘
d) maintained for a minimum of 5 years

20. Whena loss of product or discharge is indicated by any unexplained variation greater than 0.5% in the
inventory reconciliation, the operator shall immediately notify the Administering Authority.

21. In the event of a situation creating environmental harm pertaining to a spill, leak, fire, explosion or similar,
the Administering Authority shall be notified and advised of the incident and circumstances as soon as
reasonably practicable fter becoming aware of the event.

22. All mechanical and electrical leak detection equipment shall be inspected and tested annually. All
records shall be kept on site for a minimum of 5 years.

23. — Ensure tank abandonment is carried out by either removal of the tank, or filling the whole of the tank with
an inert soil material such as sand, concrete or other approved material, and the disconnection. of all
pipes from the tank as stipulated in AS 1940 and the Contaminated Land Act.

24, — Ensure all persons working on, site where petroleum products are stored shall have relevant training in
accordance with AS 1940 clause 9.3. ,

25. — Ensure that the premise is licensed with the Local Authority under the Dangerous Goods and Safety Act

A o:ldatabaselonestop\decision.doc

Drainage from tank and package store bunds and compounds must be manually controlled so that all
wastewater passes through treatment facilities before release to the environment. Any vaive controlling
the drainage from a compound shall be located outside the bund. The valve shall be of a type in which
the distinction between open and closed positions is obvious and shall be closed and locked at all times
except when flow to the treatment facility is authorised by management.

2001.

Page 64

Section 67

Page 65


[OCR of page images]
NOOSA COUNCIL IDAS Development Application Decision Notice

32

 

ea Bere Appeal Rights

INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

 

 

The following is an extract from the -fritegrated
Planning. Act(Chapter 4).

 

 

 

Division 8 - Appeals to court relating to
development applications

Appeals by applicants

4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-

(a) the refusal, or the refusal in part, of a
development application;

(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;

(c) the decision to give a preliminary approval when a
development permit was applied for;

(d) the length of a currency period;
(e) a deemed refusal. ,

(2) An appeal under subsection (1)(a) to (d) must °

be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant.

(3) An appeal under subsection (1)(e) may be
started at any time after the last day a decision on the
matter should have been made.

Appeals by submitters

4.1.28.(1) A submitter for a development application
may appeal to the court about-

(a) the giving of a development approval, including
any conditions (or lack of conditions) or other
provisions of the approval; or

(b) the length of a currency period for the approval.

(2) The appeal must be started within 20 business
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is
given to the submitter.

(3) If a person withdraws a submission before the
application is decided, the person may not appeal the
decision.

(4) If an application involves both impact
assessment and code assessment, appeal rights for
submitters are available only for the part of the
application involving impact assessment.

 

* Section 3.1.6 (Preliminary approval may override local planning
instrument) .

A o:\database\onestop\decision.doc

(5): If an application -is processed ‘under. section
6.1.28(2), appeal rights for submitters for the
application are available only for the aspects of the
development that would have required public
notification under the repealed Act.

(6) If an application involves assessment against
a concurrence agency code, appeal rights for
submitters for the application are not available
against the part of the approval that represents the
concurrence agency's response for the code.

Appeals by advice agency submitters

4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of
a development approval for a development
application if-

(a) the development application involves impact -
assessment; and

(b) the advice agency told the applicant and the
assessment manager to treat its response to the
application as a submission for an appeal.

(2) The appeal must be started within 20 business
days after the day the decision notice or negotiated
decision notice is given to the advice agency as a

submitter.

Appeals for matters arising after approval given
(co-respohdents)

4.1.30.(1) For a development approval given for a
development application, a person to whom any of
the following notices have been given may appeal to
the court against the decision in the notice-

(a) a -notice giving a decision on a request for
extension of the currency period for an approval;

(b).a notice giving a decision on a request to make a
minor change to an approval.

(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.

(3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(superseded planning scheme) that was assessed as
if it were an application under a superseded planning
scheme.

(4) Also, a person who has made a request
mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.

(5) An appeal under subsection (4) may be
started at any time after the last day the decision on
the matter should have been made.

Page 65
19/08/03

Section 68

Page 66


[OCR of page images]
eeaeenoed

 

NOOSA COUNCIL IDAS Development Application Decision Notice

Division 9 - Appeals to court about other matters

Appeals for matters arising after approval given
(no co-respondents)

4.1.31.(1) A person to whom any of the following ©

notices have been given may appeal to the court
against the decision in the notice-

(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.

(b) a notice under section 6.1.44? giving a decision to
change or cancel a condition of a development
approval.

(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.

(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal-to the
court against a deemed refusal of the request.

(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made. .

Appeals against decisions to change. approval
conditions under the repealed Act

4.1.334.(1) A person who is dissatisfied with a

decision made on an application to change the

conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-

(a) the decision; or
(b) a deemed refusal of the application.

(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of

* the decision is to be given to the person.

(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.

Appeals against local laws

4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.

(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.

ee
2 Section 6.1.44 (Conditions may be changed or cancelled by

assessment manager or concurrence agency in certain
circumstances)

A:\databaselonestop\decision.doc

19/08/03

Page 66

Section 69

Page 67


[OCR of page images]
Annexure 2 — Plan of Open Space Areas

Page

Page 67

26

Section 70

Page 68


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 
 
   
 
  
 
 
 
  
 
 
 
  
 
 
  
 
  
 
  
 
  
  
     
 
  
  
 
 
  
  
 
 
     
  
 
 
  
 
  

 

 

 

 

 

 

 

 

 

 

Pork
‘LEGEND
PSM 56220
BUSINESS
E5 Osi (Retail Centre and Business)
ae B2 BUSINESS
(Car Parking & Offices)
B3 BUSINESS
(Showroom, Office & Business)
123
( —1 EMPLOYMENT = “™#?”
Td (Technology based R&D
Business Offices & Civic)
Wea 2 EMPLOYMENT
weet (Educative & Environmental
} R&D Business & Offices)
coe he €3 EMPLOYMENT
ow (Environmental R&D
I ‘ Business & Offices)
| [: fy —4 EMPLOYMENT
— (Industry & Business)
po E5 EMPLOYMENT
(Industry & Business)
—— E6 EMPLOYMENT
= (Business Offices & Transit)
EMPLOYMENT
E4 { E7 (Business & Offices)
Total reo \ OS1 OPEN SPACE
(Environmental)
Total Area 3.1
OS2 OPEN SPACE
7 (Environmental)
REY 782
OS3 OPEN SPACE
* (Preservation of Visual Amenity)
1os4 OPEN SPACE
Ay (Environmental Drainage)
4
ZY OS5 OPEN SPACE
Z (Preservation of Visual Amenity)
]}OS6 OPEN SPACE
| (Preservation of Visual Amenity)
Total Area 3.7 Ho
}OS7 OPEN SPACE
Totol Area 1.9 Ho ; (Environmental Drainage)
, a
RES RESIDENTIAL
oo ne | (Employment Support)
i REC/MU RECREATION MIXED USE
| (Minor recreation/
minor mixed u 2
or open spaces) . rrvecsss
2 Os2
ae wee )
. Team ge TRE HS ___ BICYCLE PATH
¥ WALKING PATH
YQ
=
Se
SS,
SCE 1:3500 (A3) a
April 2003
NOOSA SHIRE BUSINESS CENTRE
MASTER PLAN - STAGE 2 - MP2 PLAN
ANNEXURE 2
Page 68

Plan of Open Space Areas

Section 71

Page 69


[OCR of page images]
| Page 27

Annexure 3 ~ GHD Plan 41-12240-C027

 

:

J

Page 69

Section 72

Page 70


[OCR of page images]
raat nt oe ot eas Bouma NLAREONMIARLED REIS

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L20D-OZZi-Ly ON Suma a er er eae ea oy oem aor [ny
840 Z1353HS coor om Sosa une eS oe eo NS OF ME OZ Ot Obmeuanen aioe wa | yoe | oa | AS. [3NSS1 ANVNITIER | V
(¢ VOW) NOLL9AS TWNIGNLIONOTONV NV Id on Sy ra prea sc neg = “Tao sseremnoa|S
SAMMC AVH SAL TVM ona] SaTIOWt poutnea] — S50U'S wna] me 7 £ tot oF exw os | ss. ‘GgqNanvy sarsvonnoas 9
TUONNOD VSOON wml FTWOS LON OG] wnoHsev ops] oO
AXYVNIAIMSaYd eo
a Da
/ pe anaina san a
NOLLWAITRUIANS
[=== 1
SS — 3AUND Z1HOH
3 5 3 a & & Fy é Fy a a a & E £ - = a & 8 = S & & & g
- & ¢ 2 8 6 € € &€ &€ & & s —£ § £ &€ € € & 2 2 2 8
ii is: if: i fb i Fb Gg GG bE EE GE GB Gg woman
e & & & & @ & @ @ ¢ © @€ # @ & @ @ © 22 @ £ t f+? 7? 3
Boe ¢ # ¢ § = @ € & &§ @ ¢€ § § & #2 & 8 # F € & § & & FB F 1H LSixXa|
+ Sse a a a ry = = 2 = a a = = =
# & $ &§ &€ &€ 2 FE € € = 2 & & & & &€ & & & & & € € € =
8 @ £ € @ 2 € € &€ 8 &  E EF FE F F EE  E OE OS 3 j LH NBIS3O
ni
fia SHOMHLUVA
3dAL Ad
F ONDRUYW LAd
¥ OE HNLVG
|
iN 5
Ng
2 —~_| =
2 ma I 5 £
£5 —— I 3 B a
ae —.| & 2 =
zg ~~! 8 s g
as 2 —— t—— -—|
a2 3 Ss i] a
2 a ° HBTO
= gs
3 3 z 8

  

ysteg

 

 

 

 

Section 73

Page 71


[OCR of page images]
| Page 28
J .

| Annexure 4 — Funding responsibilities for Walter Hay Drive

 

Page 71

Section 74

Page 72


[OCR of page images]
 

 

{ DMITBLONS-09214-+ 91 SIHDLBNS\SONAYUDOVZIEIIVD
BLOMS-OPeH-ly

ALITIEISNOdSAY ONIGNNA Gasodoud ss
wos oy Of 02 OO

MaaHO SINS 40 HLHON
AIG AVH HSLIWM
IWONNOD YSOON

 

 

ALTEISNOdS3Y SNIONNS T1AMI0LS

 

 

 

 

 

 

Section 75

Page 73


[OCR of page images]
Annexure 5— Master Plan 2 endorsed 10 April 2003

Page

Page 73

29

Section 76

Page 74

Section 77

Page 75


[OCR of page images]
 

FINAL ~ 10/4|2003,

 

Shire Business Centre
Master Plan: Stage 2

 

NOOSA COUNCIL
APRIL 2003

 

 

Page 75

Section 78

Page 76


[OCR of page images]
 

 

Page 76

Section 79

Page 77


[OCR of page images]
 

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 2

This Plan (MP2) is the second stage of the master planning process for the Noosa Shire Business Centre and follows on
from the Shire Business Centre Master Plan: Stage 1 - Concepts (MP1). This document together with MP1 comprises a
Planning Study prepared as part of the supporting documentation for The Noosa Plan: Choosing Futures process. It is
intended to support a planning scheme that is consistent with the requirements of the Integrated Planning Act. MP2 is
also consistent with the master plan process nominated by the 1997 Strategic Plan.

Project: Shire Business Centre Master Plan
Project Type: Master Plan Stage 2
Report Author/s: Raul Weychardt plus material from MP1 prepared by Paul Summers

Completion Date: April 2003

Status of Report: Final - Adopted by Council 10 April 2003

Page 77
G:\DEP\Projects\SBC\Masterplan-FinalApr04.doc

Section 80

Page 78


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 3

EXECUTIVE SUMMARY
This Stage 2 of the Master Plan (MP2) is:

A response to provisions of the 1997 Shire of Noosa Strategic Plan;
A guide to preparing and assessing development applications; and

Together with Stage 1 of the Master Plan (MP1), a planning study intended to support a planning scheme that is
consistent with the Integrated Planning Act.

it provides the second stage of a two-stage process that will lead to the adoption of a master plan for the Shire
Business Centre site.

Stage 1 provided an overall concept plan defining precincts for business, employment and open space. It also
provided concepts for dealing with traffic.

The proposed development outcomes contained in MP2 are consistent with the 1997 Strategic Plan's aim to:

Encourage the development of the principal business, retail and administrative centre on Eenie Creek
Road at Noosaville, in stages consistent with the needs of the population of the Shire.

Stage 2 of the Master Plan provides another step along the way to achieving the aim of the Strategic Plan and in
informing the development of Noosa's next planning scheme. It does this by providing a plan that will assist in:

Attracting appropriate employment generating businesses to the Shire;

Catering for the expanded retail needs of the community;

Preparing development applications;

Informing the Council and the community in the assessment of development applications;

Attracting new knowledge business;

Creating sustainable employment;

Introducing higher order education opportunities;
Environment protection and preservation of open space; and
Creating a Centre that is well designed, sustainable and is appropriate to its Noosa setting.

‘

VvvwvvvyvVwWwiov

G:NDEP\Projects\SBC\Masterplan-FinalApr04.doc Page 78

 

Section 81

Page 79


[OCR of page images]
Lo

fo fo

 

:

 

 

 

 

 
 
 
 
 
 
 
 
 
  
 

 

 

 

 

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 4
CONTENTS
1.0 INTRODUCTION .. , 5
2.0 | BACKGROUND.. sesese eee 7
2.1 STRATEGIC PLAN... ssssssesceesscsesesseensessstssnesnstsnonsenseeaststsessessssestsssssaststantetanennsanseneasnseseeseuneatvassassastisanesee 7
2.2 ECOLOGICAL VALUES. .
2.3. CONSTRAINT MAPPING
3.0 PLANNING & DESIGN GUIDELINES AND PRINCIPLES .10
3.1. GENERAL PRINCIPLES .........cscssssscsssssscsssscsssseessssssssssessesansessnseueanssorscseessssennensssntsceneensesseneuenannastsranensnseuansseee
3.2 URBAN DESIGN.............
3.2.1 Design Workshop
3.3. RETAIL DEVELOPMENT.
3.4 DEVELOPMENT SEQUENCING .
3.5 | TRANSPORT
3.6 ECOLOGICALLY SUSTAINABLE DEVELOPMEN’
3.7 OPEN SPACE AND LANDSCAPING
40 MASTER PLAN OUTCOMES: STAGE 2
44
4.2. COMPONENTS OF THE MP2 PLAN...
4.3 KEY DEVELOPMENT CHARACTERISTICS BY SUB-PRECINCT & TRAFFIC TYPE ..
5.0 CODES... 31
6.0 | REFERENCE SOURCES seve sees seaeeenl sesseneen 32

 

Page 79

G:\DEP\Projects\SBC\Masterplan-FinalApr04.doc

Section 82

Page 80


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 5

1.0

INTRODUCTION

MP2 comprises a second response to the requirement at Section 19.3.1.5 of the 1997 Strategic Plan for the
preparation of a master plan to guide the overall development of the Shire Business Centre site indicated in Map
1. It also serves as a planning study intended to support a planning scheme that is consistent with the Integrated
Planning Act.

MP2 includes a more detailed version of the concept plan. Itis intended to guide the development of the site, until
the IPA Planning Scheme for Noosa Shire is implemented. The Master Plan will also be used to inform the
preparation of the new IPA Scheme. The new IPA Scheme will establish codes for development of the site.

MP2 addresses the objective of the 1997 Strategic Plan to provide for a multifunction employment node serving
Shire-wide needs and including provision for business, retail, administrative, community and industrial functions.
The model contained in this document:

> Complies with the Strategic Plan;

> Can be used to determine whether a development proposal meets the needs of the Noosa Shire
community

The Master Plan and the area indicated in Map 1.1 address three lots: 1RP215933, 3RP215933 and
2SP110885. It also gives consideration to roads, both existing and proposed and including relevant
intersections, which lie adjacent to or within the lots.

In this document, the term MP1 refers to Shire Business Centre Master Plan: Stage 1 - Concepts. The
term MP2 refers to this second stage document.

It is intended that MP2 complement the initial work undertaken by MP1. However where any conflicts arise
between the documents MP1 and MP2, this document Noosa Shire Business Centre Master Plan - Stage
2 shall take precedence.

‘GADEP\Projects\SBC\Masterplan-FinalApr04.doc Page 80

Section 83

Page 81


[OCR of page images]
 

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2

Map.1 Location

 

Business Le
/  Gentre
foe

 

‘G:\DEP\Projects\SBC\Masterplan-FinalApr04.doc

NOOSA
JUNCTION

 

Page 81

Section 84

Page 82


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 7

2.0 BACKGROUND

MP2 draws from a number of sources including:

> The 1997 Strategic Plan;

> MP4 (Shire Business Centre Master Plan: Stage 1 - Concepts dated May 2001) which included
consultation with the Noosa Shire community,

> State agencies and representatives of a proponent conducted as part of the initial phase of developing
Stage 1 of the master plan (Council decision 15/04/1999) refers);

> Comments from reference groups; and
> Design workshop held on 5 September 2002

2.4 STRATEGIC PLAN ~

The 1997 Strategic Plan provides the foundation from which the Master Plan was developed. The Strategic Plan
has an important influence on decision-making associated with any development application and also provides a
significant indication of the way in which the site should be developed. For these reasons, a number of extracts
from the Strategic Plan were included in the text of MP1 at Section 2.1.

The preparation of the master plan (MP1 and MP2) is consistent with the procedural requirements of Sections
19.3.1.4 to 19.3.1.5 of the Strategic Plan.

2.2 ECOLOGICAL VALUES
The Site has a range of significant ecological values that need to be carefully considered and incorporated into
the planning, development and operation of the Site. These values are summarised below:

a. The Site provides habitat for endemic species and the southern half also functions as an important link
between the significant habitats of the National Park to the east and the Wooroi State Forest fo the west
(the ‘Doonan Link’). .

b. _ Eenie Creek and its associated wetlands, which include the wetlands and drainage lines of the Site, are an
integral part of the Noosa River system hydrology and ecology.

Cc. The Site supports two plant communities of conservation significance whose conservation status has been
classified as being ‘Of Concer’ by the Environmental Protection Agency. These are:

Regional Ecosystem 12.3.5 — Paperbark tall open forest with various eucalypt species located
adjacent to Eenie Creek, and

¢ Regional Ecosystem 12.3.11 Tall eucalytus woodland with paperbarks in the drainage lines located
throughout the lower and poorly-drained parts of the Site.

d. Four wildlife species of conservation significance under the Nature Conservation (Wildlife) Regulation
1994 have been recorded at the Site. These are:

 — Elf Skink (listed as Rare): Recorded in the flooded gum open forest regrowth in the north-westem
part of the Site and in the low-lying paperbark/swamp messmate regrowth in the southern part of the
Site.

 — Sylvia's Blind Snake (listed as Rare): Recorded in the southem part of the Site below RL 3.0 metres.
¢ Wallum Froglets (listed as Vulnerable): Recorded in the paperbark wetlands and the farm dam.

Koala (listed as Common but a ‘special cultural’ species): Recorded in the dry open forest adjacent to
the disused quarry in the north-western part of the Site.

‘GNDEP\Projects\SBC\Masterplan-FinalApro4.doc Page 82

Section 85

Page 83


[OCR of page images]
do

heen”

{

tw.

to.

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 8

2.3 CONSTRAINT MAPPING

Preparation of MP1 drew from an extensive range of documents that accompanied an application lodged by
Montbar Pty Ltd on 30/09/2000. In consultation with the then Department of Communication, Information, Local
Government, Planning & Sport and other agencies, the review of the documents led to a request for further
information. The information request had not been satisfied at the time the initial Master Plan was prepared.

Montbar provided further information; however there was little additional constraint mapping that would assist in
the development of this Master Plan.

The constraint mapping for Stage 1 indicated that parts of the site intended for development were habitat for the
elf skink, which is classified as a rare species under the Nature Conservation (Wildlife) Regulations. The skink is
understood to be associated with the Eucalyptus grandis (Flooded Gum) unit of vegetation on the site. The extent
and viability of the skink habitat over the site was not well understood at the time of preparation of MP1. However
MP2 has benefited from additional studies carried out into the extent and viability of the elf skink on the site and
the broader Noosa area. It is now also believed to inhabit the southern part of the site that is to be protected for
environmental purposes. These additional studies have lead to a conclusion that -

“There are grounds to reconsider the appropriateness of continuing to class E.graciloides (Elf Skink) as a
‘rare’ species. This new work shows E.graciloides is more common and widespread than has been
inferred from museum records and one field study.’(Jeanette Covacevich, Senior Curator (vertebrates)
Queensland Museum, 6 March 2002).

As a result of this study, the Elf Skink is no fonger a significant constraint in terms of the master planning of the
site, See Council's Minutes dated 11 April 2002. Nevertheless the Elf Skink remains a fauna of significance as
does the culturally significant species Koala which has been recorded at the site. Special measures are to be
applied to operations that removes habitat of these species to relocate fauna present to a suitable altemative
habitat. :

Drainage lines through the site were identified in MP1 as key definitional items providing edges to major
functions. Therefore the location of the drainage lines has been refined by further field survey of the site and this
additional field survey is a consideration of MP2. :

Council has named the road proposed in the Strategic Plan to connéct Emu Mountain Road and Eenie Creek
Road, as Walter Hay Drive. The alignment of this road across Eenie Creek and through the site has been refined
following extensive engineering and environmental assessments. The plan with MP2 refiects a design
recommended by Council's traffic consultants and staff. However Council is yet to finally determine the route for
Walter Hay Drive and it may vary slightly from the MP2 plan. The size of roundabouts drawn is indicative and will
be the subject of more detailed assessment by Council.

The major constraints influencing the preparation of the Master Plan are summarised in Table 2.3

Page 83

GADEP\Projects\SBCMasterplan-FinalApr04.doc

Section 86

Page 84


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 9

TABLE 2.3: CONSTRAINTS INFLUENCING THE MASTERPLAN

 

ISSUE

CONSTRAINT

 

Flooding

No development below RL 3.0 metres

 

Potential Acid Sulphate Soils

Avoid exposure of PASS if possible. Otherwise development in accordance
with the State Planning Policy on Planning and Managing Development
Involving Acid Sulfate Soils

 

Habitat links

No development that would place at risk the functioning of the Doonan Link
and provision of habitat links for movement of native fauna throughout the
Site

 

Eenie Creek and associated wetlands
and drainage lines

No change in hydrological regimes and water quality of Eenie Creek and its
associated wetlands and major drainage lines

 

Vegetation of Conservation
Significance - ‘Of Concern’ Regional
Ecosystems

No development that would place at risk the long term viability and
sustainability of ‘Of Concer’ Regional Ecosystems on the Site

 

Fauna of conservation significance

No development that would place local populations of these species at risk

 

Proximity of Noosa Airport

Types of land use that are able to sustain possible future aircraft noise

 

Values of adjacent Noosa National
Park

 

 

Provision of vegetated buffers adjacent to the national park and provision of
habitat links to and from the national park.

 

 

‘GADEP\Projects\SBC\Masterplan-FinalA ps04.doc

Page 84

Section 87

Page 85


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 10

3.0 PLANNING & DESIGN GUIDELINES AND PRINCIPLES

3.1 GENERAL PRINCIPLES

Apart from the planning and design principles flowing from the Strategic Plan (refer to Section 2.1of MP1) and the
constraints over the site, there is a range of other principles, opportunities and constraints that have been
considered in the development of both MP1 and MP2:

a.

The site should be developed as a centre of urban design and environmental excellence in both built and
natural environments, showcasing the attributes of the site, the environmental capabilities of the Shire and
best practice environmental technologies.

Key design elements should include an integrated public transport system including bike and pedestrian
pathways; energy-efficient design; the generation of renewable energy; integration between the built form
and the landscape fabric; low key informal places; a visual relationship between indoor and outdoor
spaces; waste minimisation; and recycling.

Open space areas should be located and managed so as to protect the ecological values of the Site and
Eenie Creek. They should also provide visual screening, soften the built environment, provide habitat for
local fauna and provide a buffer to the Noosa National Park. They should be of a size and shape that

facilitates the survival of native vegetation and habitat.

Presentation of the site as viewed from Walter Hay Drive in the area of Eenie Creek is of importance.
From land to the south at around RL10, the road would drop to a bridge deck level of around RL4 or 5,
providing visible sight lines across the Shire Business Centre site.

Designations adjacent to Walter Hay Drive provide the opportunity for the character of the adjacent areas
to be maintained, thereby providing an open space feel on this entry to Noosa Shire. This character can
be reinforced by the frontage treatments along the Shire Business Centre site, with natural vegetation
being retained in 5 metre strips near the entry intersections, together with occasional wider areas.
Vegetation intended to offer light screening may be in road reserve or park tenure to assist in its retention
in a natural state. '

Development design should incorporate water sensitive urban design principles, including offline and ‘at
the source’ treatment, comprising, for example, bio-retention, infiltration, grass swales, vegetated filtration
strips and gross pollutant trap devices. The principal measures to address retention of stormwater and
water quality from development areas are to be contained within the development sites clear of drainage
corridors and open space sub-precincts. The existing drainage corridors proposed to be protected through
the site should only be used for final polishing or runoff. There should be no significant change to the
existing hydrologic and ecologic regimes across the site.

Drainage lines and associated open space through the site should be used as key definitional items
providing habitat linkages and edges to major land uses. These drainage lines will need ecologically
sensitive enhancement in some places to ensure that the water quality polishing function of the drainage
lines is maintained to a high standard.

Capacity should be retained on the site in the longer term to take advantage of potential new employment
opportunities, as the identification of altemative land for additional employment opportunities in the coastal
part of Noosa Shire is already difficult and will become more so in the future.

While it is desirable to identify nodes for particular forms of development, it is also desirable to maintain
the opportunity for a dynamic mix of development. Development precincts are a convenient way of
describing and labelling mapping and associated controls, however some care needs to be exercised to
ensure that such precincts are not only read as discrete areas preventing appropriate mix of land uses and
integration of functions. It is intended the precincts may include a mix of uses provided there is general
compliance with the outcomes sought for the precinct. (This provision is not intended to offer support to
any expansion of shops beyond Precinct B1.)

Page 85

GADEP\Projects\SBC\Masterplan-FinalA pr04.doc

Section 88

Page 86


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 11

j.

The relationship between the main retail areas and open space areas is of importance. In addition, some
key employment nodes would benefit from strong relationships with open space areas.

The relationship between the main retail areas and key employment nodes is of importance,

The site will be developed at a human scale in keeping with the character of Noosa. The buildings onsite
will generally be of a low rise form comprising one and two storeys, creating spaces for people that are
integrated with the natural environment.

The design outcomes for the site should recognize the character of Noosa. Buildings should be of a
design recognized as being appropriate to a Noosa location.

The western sector of the Shire Business will have uses that are car-oriented and parking areas need a
degree of visibility and may be in front of buildings. The eastern sector offers more Opportunity for
buildings to be the dominant visual feature from the loop road with carparking at the side or rear of
buildings.

Based on all the considerations above, the following broad concepts have been devised for Stage 2:

>

>

A simple function fayout depicting open space and development precincts and key connectivity - Figure
3.1; and

~ Assimple traffic layout showing key connectivity and circulation - Figure 3.2.

GADEP\Projects\SBC\Masterplan-FinalA pr04.doc Page 86

 

Section 89

Page 87


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2

FIGURE 3.1 SIMPLE FUNCTION LAYOUT (STAGE 2)

12

 

DEVELOPMENT

 

 

 

 

FUNCTIONAL USE

 

 

 

‘G:\DEP\Projects\SBC\Masterplan-FinalA pr04.doc.

Page 87

 

Section 90

Page 88


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2

FIGURE 3.2 SIMPLE TRAFFIC LAYOUT (STAGE 2)

13

 

SOUTHERN
ACCESS ROAD

 

 

i f i
oe PEE
ACCESS AND CIRCULATION

 

 

 

‘GADEP\Projects\SBC\Masterplan-FinalA pr04.doc

Page 88

Section 91

Page 89


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 14

3.2. URBAN DESIGN
3.2.1 Design Workshop

A principle purpose of MP2 is to present a refined layout plan for the Shire Business Centre. To facilitate the
preparation of such a plan, Council held a day long workshop on 5 September 2002. A range of participants were
present at the workshop including -

>
>
>

vwvvv vv VW

Councillors
Council staff

Representatives of property owners and Stockwell (a company proposing to develop part of the Shire
Business Centre)

Consultant architects/urban designers
Consultant traffic engineers

Local architects

Key outcomes of the workshop were-

Apreferred master plan of layout for the various land use elements

‘identification of preferred locations for a civic precinct and an inter-regional transit facility

Some preferred urban design themes
Refinement of open space strategies
Identification of access issues
Improved pedestrian focus

More utility to the intemal loop road

Better integration of future development and use of the two properties that comprise the Shire Business
Centre site '

Resolution of a connection to the adjoining industrial area

The workshop has been followed by further discussion between the architects and traffic engineers to
determine whether preferred access arrangements could be resolved. While complete agreement was not
reached, access was largely resolved in principle with Council being called upon to determine the
placement of the two roundabouts in Walter Hay Drive and the additional access from Eenie Creek Road,
which offer access into the site.

3.3 RETAIL DEVELOPMENT
Section 19.3.1.2 of the Strategic Plan nominates retail development outcomes for the site of

>

G:\DEPWProjects\SBC\Masterplan-FinalApr04.doc

Retail shops of the order of 15,000m? of floorspace with a discount department store to be in the first stage
> Homemaker and showrooms of the order of 10,000m2

Council engaged Urban Economics in 1999/2000 to conduct independent investigations on the economic
impacts of a development proposal by. Conclusions from those investigations were-

> An 18,300m? sub-regional shopping center has market support for an opening by 2004.

> The impact of the sub-regional center can be contained within manageable levels provided the
future expansion of the retail network is contained. It is expected the sub-regional center will create
an impact upon the retail network [that] falls just short of being significant. During 2004 it can be
expected there will be some closures and relocations fo the Shire Business Centre. it is expected
that all existing retail nodes will continue to perform at their designated function in the retail
network.

Page 89

Section 92

Page 90


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 15

> The Premium Outlet Centre as proposed in the earlier Montbar application, would compete strongly

: with Hastings Street retailers, which target tourists, offering mainly premium brands at low prices,
The impact [of the proposed Premium Outlet Centre] upon the Hastings Street retall node is likely
to be significant in both dollar values and its ultimate composition.

From the above conclusions and in consequence of the Montbar application, the following revised
development parameters are concluded as acceptable outcomes for the site-

> Retail shops of the order of 18,300m? of floor space with a discount department store to be in the
first stage

‘> Homemaker and showrooms of the order of 7,000m? floor space

> No Premium Outlet Centre or other significant retail development.
3.4 DEVELOPMENT SEQUENCING ,
Section 19.3.1.5 of the Strategic Plan calls for the Master Plan to include sequencing guidelines for the overall
development, designed to co-ordinate with the construction of roads servicing the site and other relevant issues.

The first stage of development will contain a shopping center with a Discount Department Store as called for by
the Strategic Plan. That will bring a requirement for a suitable extemal road network and access arrangements
into the site. The Strategic Plan nominates that the first stage of development will only proceed after-

> The construction of Eenie Creek Road between Eumundi Road and Reef Street [completed 2002]

> Commitments being made for the construction of Walter Hay Drive. [This road is the subject of an
agreement between Council and Main Roads Department]

The intemal road system will need to be sufficiently advanced to service a shopping center, as it is a high
generator of traffic. With the first stage there will need to be additional development outcomes as follows-

>  Anestablished landscape theme for the developed precincts

‘

A suitable stormwater management system

Entry treatments

>

>

> Appropriate signage
> Commencement of the associated pedestrian and bikeway network and related extemal links

> Interim transport circulation strategies in the absence of the loop road being complete [The loop
road may be completed in stages]

> Two accesses into the site are preferred unless Council is satisfied that a single access is
acceptable ‘

> Dedication of the lower part of the land as public open space.

Community consultation has indicated a concem that the Shire Business Centre should demonstrate at an
early stage that it is to be developed for more employment opportunities than through retailing alone. It
would be reasonable for Council to acknowledge those concems and to require that a substantive amount
of non-retailing development should take place in the first stage. The minimum standards applicable to
this non-retail development are:- .

> Anarea of floor space equivalent to 20% of any retail floor space, is to be constructed prior to such
retail development operating; and

> 40% of the non-retail development floor space is to be contracted for sale or lease, prior to the
retail development operating.

‘G.\DEP\Projects\SBC\Masterplan-FinalApr04.doc Page 90

 

Section 93

Page 91


[OCR of page images]
 

 

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 16

Subsequent development stages will address-

Completion of the access intersections leading into the site

Completion of further stages of the internal loop road

Completion of further stages of development within the sub-precincts
Completion of the pedestrian and bikeway network

Construction of the link road to Rene Street/Production Avenue industrial area
Completion of the stormwater management systems .

Completion of landscaping design elements

vVvvvvVwvwYvY Vv wv

Further dedication of !and to public open space.

3.5 TRANSPORT
The following principles should apply to the development of transport infrastructure at the site-

a.

"The functioning of Eenie Creek Road and Walter Hay Drive are of key importance to traffic flows across

the coastal area of the Shire. The Shire Business Centre site should be designed such that peak traffic
flows to the site do not impact on the wider functions of those roads.

The proposed point for Walter Hay Drive to cross Eenie Creek has been relocated from that shown for
MP1 to a place to the east approximately 140 metres.

There should be deliberate planning for pedestrian and bikeway networks within the site and for
appropriate extemal connections. ‘End of trip’ facilities such as racks, showers and lockers should also be
provided.

The development should be designed on the principle of equity in access opportunities.

Intersections, both internal and external to the Shire Business Centre site should be designed to operate
without the need for traffic lights.

There are traffic and economic imperatives that necessitate connectivity between the existing Noosaville
industrial estate and the Shire Business Centre; however the potential for conflict between heavy vehicles
and both other traffic and certain land uses, requires control.

Traffic distribution through the site will benefit from provision of a loop road providing for circulation and
distribution of traffic. ,

Key parking areas need to be located immediately adjacent to key generators. In this respect, the key
generators will be the main retail areas and the key employment nodes.

Pedestrian movements and many bicycle movements between key nodes within the site should be
designated to minimise the need to cross over roads. If road crossovers are necessary, central refuges
should be provided.

Carparking should be designed to avoid the appearance of large carparks. This can be achieved through
landscape and preferably retention of existing established vegetation in key areas to frame the car parking
into almost discrete areas. It is acknowledged that the car parks need to be visible with clear accesses.
Carparking is preferred underground or under buildings for reason of efficiency of land use, weather
protection and an opportunity for more open space to be provided. However it is acknowledged the high
cost of such parking can be prohibitive for the uses proposed, without some other means of
encouragement. Covered parking at ground level can also be considered for the purpose of offering
weather protection. For non-retail development Council is prepared to re-consider the maximum plot ratio
for development if underground or under building parking constructed provided there is also a significant
increase in open space on the site. Retention of existing vegetation is preferred to landscaping treatment
should the circumstances allow.

Page 91

G:\DEP\Projects\SBC\Masterplan-FinalApr04.doc

Section 94

Page 92


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 17

3.6

3.7

k. Access intersections off Walter Hay Drive are to be via roundabouts in the locations identified onMP2
Plan. The form of the access intersection from Eenie Creek Road is yet to be determined by Council.

ECOLOGICALLY SUSTAINABLE DEVELOPMENT

Development and operation of the Site shall be undertaken in a manner that works within the ecological
constraints and does not place ecological values at risk. This approach is reflected in the objectives, intents and
performance standards for individual sub-precincts (see Table 4.3).

Additionally, the first 2 design principles of Section 3.1 nominate -

> The site should be developed as a centre of urban design and environmental excellence in both built and
natural environments, showcasing the attributes of the site, the environmental capabilities of the Shire and
best practice environmental technologies,

> Key design elements should include an integrated public transport system including bike and pedestrian
pathways; energy-efficient design; the generation of renewable energy; integration between the built form
and the landscape fabric; low key informal places; a visual relationship between indoor and outdoor
Spaces; waste minimisation; and recycling.

These general principles are to be extended into the design approaches for buildings and sites and also
_ into the management phases after operations commence. Development applications will be assessed for

attention to these principles and appropriate conditions will be imposed on approvals to achieve these :

outcomes. Environmental management plans will be prepared for all Stages of development.

Additional development concepts supportive of ESD principles are to be adopted by developers wherever
practicable and shall include-

> Apreference for energy efficient building material, including choice of glass

> Installation of energy efficient hot water systems, preferably solar for small scale water usage or
heat pump

Use of grid-connected photovoltaic devices and associated community education

Use of low energy lighting systems and maximized use of natural light

Passive solar designs and best practice low consumption power needs

Cross ventilation techniques to minimize air-conditioning requirements

Window openings to be optimize natural light and to be screened for balance of light and heat
Solar panels to be located to cause no reflective glare nuisance

VvVVVV Vv

Installation of water re-use tanks for landscaping
> Use of appliances having the most favourable energy rating.
OPEN SPACE AND LANDSCAPING

Open space has important functions for the site. In the southern part the land is constrained for development due
to flood potential and environmental reasons. This area should be retained in its natural state and dedicated for

public open space. it will form an important character element for the site and entry to the Shire along Walter Hay
Drive.

‘GADEP\Projects\SBC\Masterplan-FinalApr04.doc Page 92

Section 95

Page 93


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 18

Walter Hay Drive and Eenie Creek Road are the Principal frontage roads to the site. They also serve high order
functions in the transport network. No development is to have direct access to those roads. In addition it is
desirable to screen development from those roads so as to ensure development has an internal focus. (See
Strategic Plan 19.3.1.8) The design workshop of 5 September 2002 discussed the extent of this landscape and
concluded a complete screening of all development was not desirable, as it is important that the site be
identifiable because of its prominent role. Nevertheless a minimum width of 5 metres of existing vegetation is to
be retained near the entry roads and this width may expand to 10 metres in between those access points.

To maintain the vegetation in a natural state in the long term, Council requires that part of OS3 containing
vegetation to be protected is to be contained in a park reserve or otherwise secured for Open space purposes in
the long term (eg. environmental covenant).

Sub-precincts B1-3, E1-7 and RES are required to provide a minimum area of open space. The intent of those
open space areas is to provide a vegetated setting for development but also to give consideration to potential
habitat and fauna corridor functions linking to Open Space Precincts and the Open space areas within each of the
adjacent development sub-precincts. It is acknowledged that substantial parts of the open space within the sub-
precincts will be re-planted for tandscaping effect.

The location of Walter Hay Drive creates a small precinct in the northeastem sector of the site. This land is
constrained by -

> - Shape

> — Access

> Proximity to National Park (buffering on site will be required)
> Separation from other development precincts .

This area has been determined to have limited development potential and would most usefully serve as an
addition to the National Park. It can altematively be considered for a small-scale recreation use or mixed use
development, upon Council being satisfied the above constraints are satisfactorily accommodated and the values
of the National Park are not impacted to any measurable degree. A recreation use could be beneficial to the
functions of the balance of the Shire Business Centre. In reflection of this the land has been designated
Recreation/Mixed Use, but with buffer areas adjacent to the national park included in Sub-Precinct OS1.

This master plan also carries forward the intent of MP1 concerning the retention of existing defined drainage
paths. Additional survey work has demonstrated the open space area shown as Precincts OS5 and OS6 on MP1
do not contain a well defined drainage corridor. MP2 proposes a different approach in this area and seeks the
retention of a lesser extent of open space land that is fo perform a role of a character element - separating
differing land use types. Landscaping treatment of the drainage corridors and other parts are to be designed with
water quality objectives in mind. Landscape treatments in the more urbanised parts of the site may include water
elements. .

The three entry roads into the site are to be distinguished by landscape treatment. This treatment as with all

landscaped areas shall be consistent with the adopted landscaping policies of Council. Landscaping should retain
existing vegetation where practicable.

Page 93

GADEP\Projects\SBCMasterplan-FinalApr04.doc

Section 96

Page 94


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 19

4.0 MASTER PLAN OUTCOMES: STAGE 2

44

4.2

In this section, the master planning outcomes for Stage 2 are described, These outcomes have been derived
from the master planning outcomes for Stage 1 and then further refined by Stage 2.

MP2 PLAN

MP2 Stage 2 plan is derived from the simple concepts provided in Figure 3.1 and Figure 3.2. it provides a more
detailed plan for the site and the roads about the site. An A3 version is found at the end of this document.

MP2 Stage 2 pian contains considerably more design detail than MP1. This plan together with MP1 meet the
requirements of the Strategic Plan and the development Principles established in Section 3. Boundaries between
precincts, areas of precincts and the location of proposed roads and intersections have been refined from the
Stage 1 Master Plan but they are still conceptual to a degree. Final boundaries will be determined in conjunction
with decision-making on appropriate development applications.

COMPONENTS OF THE MP2 PLAN

Table 4.1 shows the elements indicated on MP2 Plan including their map object number, primary function,
secondary function and area. The primary and secondary functions are intended to indicate the dominant
activities within precincts and sub-precincts. The precincts and sub-precincts are not intended to define discrete
boundaries for the various functions, however the control of the scale of some of these functions will be of
importance,

MP2 Pian and Table 4.1 contain thé following elements:

a. A Business Precinct comprising a total of 3 sub-precincts totalling 12.1 hectares and allocated for future
business growth areas of Noosa Shire. The Business Precinct would include the highest order of retail
development in the Shire and significant vehicle parking.

b, An Employment Precinct comprising a total of 7 sub-precincts totalling 20.0 hectares and allocated for
future employment growth. The Emptoyment Precinct includes 3 sub-precincts with preferred themes. The
themes are not mandatory and the intent is to allow these sub-precincts to take advantage of new
employment opportunities, as and when they arise.-

c An Open Space Precinct comprising a total of 7 sub-precincts-totalling 29.6 hectares and allocated for a
Tange of open space functions. Some of these functions would see the tand left in its naturat state with
little human use, whilst others would see significant modification to the natural form and significant human
use. The Open Space Precinct includes an extensive area that would continue to serve as an ecological
corridor along and buffer to Eenie Creek. The open space precinct acknowledges that it is part of a wider
Open space resource which includes the National Park and Lake Weyba.

d. A Residential Precinct comprising 0.7 hectares. The precinct is intended to provide support
accommodation to the other key sub-precincts.

e. A Civic designation located between the principal retailing precinct and the northem entry road from
Walter Hay Drive. Council established a Civic Precinct Working Group to investigate the type of function
that Council would consider on the'site. The Group reported its findings to Council and nominated the
following activities for further assessment -

Central library

Art gallery

Performing arts center

Community radio and sound studio
Council one-stop shop

Tourist information center
Heritage interpretative center
Inter-regional transit center

Park and ride facilities

Community meeting and gathering spaces
Public art, sculptures and murals
Outdoor street entertainment

VVVVVWV VV VV Vv

GADEP\Projects\SBC\Masterplan-FinalApr04.doc Page 94

 

Section 97

Page 95


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 20

f A Recreation/Mixed Use Precinct comprising 1.5 hectares in the north east of the site. This site has

constraints and any development must satisfactorily address those failing which the land should remain
open space.

g. _ . The site has potential for an inter-regional transit facility. MP2 recognises this by including a Transit
designation for such a facility near the northem entry road from Walter Hay Drive.

h. Key external roads are Eenie Creek Road and Walter Hay Drive, respectively. Intersections with these
roads will be by way of roundabout, where this can be achieved to meet acceptable traffic management
practices. Access from Eenie Creek Road in the north west sector has not been resolved. [See section
3.5.k]

i. Key Vehicular Access Points

j. Key intemal Loop Road

k. Key Pedestrian and Bikeway Linkages.

Page 95
G-\DEP\Projects\SBC\Masterplan-FinalApr04.doc

Section 98

Page 96


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2

TABLE 4.1 PRECINCTS BY PRIMARY FUNCTION, SECONDARY FUNCTION & AREA

‘GADEP\Projects\SBC Masterplan-FinalApr04.doc

21

 

Page 96

 

Section 99

Page 97


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 22

43

G:\DEP\Projects\SBC Masterplan-FinalApr04.doc

KEY DEVELOPMENT CHARACTERISTICS BY SUB-PRECINCT & TRAFFIC TYPE -

For the purposes of this Master Plan, a range of land uses defined within the Schedule to the Planning Scheme,
have been condensed to a nested series of definitions relating to the primary and secondary functions defined by
MP2 Plan and Table 4.1.

These are indicated in Table 4.2. Note that the land uses indicated in the final column are the principal definitions
only. Other land uses that are not listed in Table 4.2 may occur, though these functions would not be dominant in
the precincts in which they occur.

The discussion in this Master Plan provides a guide to the use intentions associated with the defined precincts
and the scale of development intended for each of the sub-precincts. Final outcomes will be determined by
decisions on any relevant development application and by the new Planning Scheme.

Table 4.3 defines the key development characteristics anticipated for the various sub-precincts and includes the
following components:

vwvvv wv

Sub-Precinet: The sub-precinct number on MP2 Plan.
Primary Function: The primary function from Table 4.2.
Secondary Function: The secondary function from Table 4.2.

"Objective: The objective for the particular sub-precinct.

Process Principles: Initial Integrated Development Assessment System processes under the Integrated —
Planning Act for key forms of development (material changes of use and reconfiguration). Material
changes of use based on land uses indicated in Table 4.2 and reconfiguration only are considered. For
changes of use to functions not consistent.with Table 4.2, the impact assessment process is to be
followed. Note that the provisions focus on the principles for each sub-precinct and more detail on the
exact process for all development will be a necessary consideration of any relevant development
application. It is possible that as part of the new planning scheme, the assessment levels of some forms of
preferred development (ie business uses) will be changed from impact assessment to code assessment.

Strategic Plan Provisions: The Strategic Plan provisions that have direct influence on issues associated
with the sub-precinct. There will be many other provisions of the Strategic Plan that apply, however these
will have generic application over the whole of the Shire Business Centre site.

Intent & Performance Standards: An intent statement or description for the particular sub-precinct,
followed by a series of performance standards. The performance standards are generally structured on the
basis of:

Development scale, using floor space, site cover and plot ratio techniques,

» Connectivity in visual and pedestrian/bikeway terms;

> Parking; {Car parking will be assessed against the provisions of the Planning Scheme]
> Timing; and

> Use relationships.

Page 97

Section 100

Page 98


[OCR of page images]
.
5
i
{

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 23

TABLE 4.2 PRIMARY & SECONDARY FUNCTIONS & PLANNING SCHEME DEFINITIONS

 

 

‘
|
t

 

GADEP'Piojects\SBOMasterplan-FinalApr04.doc

Page 98

Section 101

Page 99


[OCR of page images]
66 abed

Poot fo tl Lo bo bo to Co

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2

TABLE 4.2 SHIRE BUSINESS CENTRE MASTER PLAN: SUB-PRECINCTS

Retail Retail Centre and Provision of the highest 19.3.1.2, 19.3.1.9
Business (Shops —_| order retail facilities in :
including @ discount | Noga Shire, in a centre of
am store), | distinctive design that is

— unique, has an outdoor
focus and is integrated
with the site's topographic,
vegetation and local
climatic features.

B2 Business Car Parking and } Provision of principal parking, | 19.3.4.2,19.3.1.9,
Offices (3.1 ha.} and access for retall 19.3.4.17,  19.3.1.18,
development in Sub-Precinct | 27.10.4.2, 27.10.43
Bi.
These facliities will be added
to by office functions if tand Is
available.

Sub-Precinct B1 comprises the retail core of the Shire Business Centre site and as such has a commensurate
scale of development potential. Its design standards will reflect the identified core values within the Shire
Strategic Vision.

a. Shop floor space up to 18,300m? total use area (TUA‘).

b, Commercial and administrative office floor space up to 3, 000m? TUA.

c. Plot ratio for development within Sub-Precincts B1 and B2 combined up to 0.5:1.

d, Building heights of 1 and 2 storeys

e, Development to have strong visual linkages with Sub-Precincts B2, 83 and OS5 and Employment Precincts.
f, Development to have strong pedestrian and bikeway connectivity with Sub-Precincts B2, B3, E1 and E2.

g. Most vehicular parking will be provided as part of parking facilities in Sub-Precinct B2. :

h, Development to be staged, consistent with the needs of the population of the Shire in accordance with the
Strategic Plan alms. Sub-Precinet B1, together with Sub-Precinct B2, are to form part of the site of the first
stage of development.

i. Minimum open space may be 10% of the area of any development site within the Sub-Precinct provided that
the Sub-Precinct overall shall have a minimum open space area of 15%.

Sub-Precinct B2 comprises a car parking oriented precinct, with additional commercial offices If land is
available after provision is made for car parking. Along with Sub-Precincts B1 and £1, Sub-Precinct B2
comprises the core of the Shire Business Centre site, its functioning Is critical to the successful operation of
traffic management, parking schemes, and pedestrian movements through the overall site.

a, Parking facilities servicing Sub-Precincts B1, B2, and E1, with primary points of access located along the
loop road. It is desirable for a substantial part of the parking to be at basement level, under a building or
otherwise covered.

b. An important objective of the design shall be to avoid the appearance of a large single car park. This can be
achieved through landscape and preferably retention of existing established vegetation in key areas to frame
the car parking into almost discrete areas. itis acknowledged car parks need to be visible with clear accesses.

¢. The design of the parking areas shall include adequate provision for pedestrians, cyclists, bus transport and
taxis.

d. Commercial and administrative office floor space up to 4,000m? TUA.

 

‘ Total use area Ia a term defined In the Schedule to the Planning Scheme: The sum of the area (axelusive of al walls and columns) of all storeys of a building or bulidings which ls used or intended for uee for # particular purpose plus any other area of the atte which Is also used or intended for use for tha same

provided that the tarm does not inotude:-

purpose,
‘8. The areas (noluslve of al wails and columie) of eny Iftroome, mator room, eircondiioning or other mechanical or electical plant or equipment roms locstad at any topmoat story,

‘, The areas of any staircases or Eftwells;
¢. The areas of any common foyer, arcade or landscaped plaza; or
d, The areas of any public tollets,

GADEPWProjects\SBC\Masterplan-FinalApro4.doc

Section 102

Page 100


[OCR of page images]
Oot abeg

CHOOSING FUTURES: Shire Business Centre Master Plan - Siage 2 : 25

   
  
   

@. Plot ratio for development within Sub-Precincts B1 and B2 combined up fo 0.5:1.

f. Building heights of up to 2 storeys.

 
  

g. Development to have strong visual linkages and pedestrian and bikeway connectivity with Sub-Precincts B1,
B3 OS? and E1

    
    

h. Sub-Precinct B2, together with Sub-Precinct B1, are to form part of the site of the first ‘Stage of development.

    

i, Minimum open space may be 10% of the area of any development site within the Sub-Precinct provided that
the Sub-Precinct overall shall have a minimum open space area of 15%.

  
   
   

      
 
  
 
 

 
 
 
  
 
  

    
   

Provision of Offices and
showroom facilities in an open
Modular setting.

Sub-Precinct B3 provides opportunities for showroom and office facilifies on the Shire Business Centre site.
Whilst some of these areas lie close to Eenie Creek Road, development will tum away from that road.

8, Showroom/homemaker floor space up to 7,000m2 TUA.

b. Commercial and administrative office floor space up to §,000m2 TUA,
¢, Business floorspace up to 6,000m2 TUA.

d, Plot ratio for development within the sub-precinct up to 0.8.

e, Buliding heights of generally 1 - 2 storey.

£, Development to have strong visual linkages to intemal roads with no tellance on visual association with
Eenie Creek Road. .

g. Vehicular parking will be provided on-site.

h, Development may be staged, but Council requires non-retail Offices and business elements to be part of the
first stage.

i, Minimum open space may be 10% of the area of any development site within the Sub-Precinct provided that
the Sub-Precinct overall shall have a minimum open space area of 15%.

Sub-Precinct E1 comprises the central employment core of the Shire Business Centre site. is expected that it
will Include a major employment tenant in a new sector of business in the Shire, to which other business and
sectors will cluster. Along with Sub-Precincts B1 and B2, Sub-Precinct E1 comprises the core of the Shire
Business Centre site. It is expected that development will accur in a park like setting,

a, Floor space allocations will be determined on specific applications.
b. The northem section may contain a smaller intemal Precinct set aside for civic purposes,

c. As a guide, plot ratio for development within the sub-precinct would be anticipated of the order of 0.6 and a
site cover of no greater than 50%,

d. Parking is to be provided for on site, generally at the side, rear or undemeath of | buildings.
@. Buildings are generally to have a presentation to the loop road with a sethack of the order of 6 metres

Showroom, Offices
and Business (5.3
ha)

 
 

 

 
 
   
   
   
     
   
     
  
    
   

   
    
     

   
  
   
  

  
   
  
  
    
   

    
   
   

 

19.3.1.2, 19.3.1.9,
19.3.1.12

Technology- Based
R&D, Business,
Offices and Civic
(4.0 ha)

Provision of a key
employment node in new
knowledge industries,

 

          
 
  
     
    
    
 
 

GADEP\Projects\SBC\Masterplan-Final Aprod.doc

 

 

Section 103

Page 101


[OCR of page images]
ToT abed

(Co Oo Le Lo Le LOL:

Peete Ptceettiy eee Nemes .

 

 

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 : “ 26

f. building heights of 1 and 2 storeys, with some building heights up to 3 storeys

g. Development to have strong visual linkages with Sub-Precincts B1, OS7 and E2.

h. Development to have strong pedestrian and bikeway connectivity with Sub-Precincts B14, B2 and E6.
i. Development expected to be staged consistent with market need.

j. Development in this sub-precinct will have significant relationships with development in Sub- Precincts B1
and B2,

k, Minimum open space may be 10% of the area of any development site within the Sub-Precinct provided that
the Sub-Precinct overall shall have a minimum open space area of 15%.

Employment Educative and Provision of a key 49.3.1.2, 19.3.1.9, ‘Sub-Precinct E2 comprises a central employment node with an educative theme. Itis expected that there will
Environmental R & | employment node based on 19.3.1.12 be business associations formed between this node and that of Sub-Precincts £1 and its proximity to Sub-
D, Business and the educative and Precincts B1 and B2 are key factors.

Offices (1.5 ha.) enviar rosea ares asFloor space allocations will be determined on specific applications.
| environmental theme : b. As a guide, plot ratio for development within the sub-precinct would be anticipated of the order of 0.6 and a

site cover of no greater than 50%.
c. Parking Is to be provided for on site, generally at the side, rear or undemeath of buildings.

~ | d. Bulldings are generally to have a presentation to the loop road with a setback of the order of 6 metres

. e, Bullding heights of 1 and 2 storeys, with some building heights up to 3 storeys
. f, Development to have strong visual linkages with Sub-Precincts B1, OS7 and RES.

g. Development to have strong pedestrian and bikeway connectivity with Sub-Precincts B1, E1 and RES.
h. Development expected to be staged consistent with market need.
1. Development in this sub-precinct will have significant relationships with development in Sub- Precincts B1
and B3.
j. Minimum open space may be 10% of the area of any development site within the Sub-Precinct provided that
the Sub-Precinct overall shall have a minimum open space area of 15%,

Employment Environmental R & | Provision ofa key 19.3.1.2, 19.3.1.9, Sub-Precinct E3 provides an opportunity for an employment node that will follow an environmental theme in
D, Business and employment node based on 19.31.42 accordance with the sensitivity of surrounding areas and promoting Noosa Shire's position as promoting
Offices (1.9 ha.) environmental research and environmental excellence, Development in this sub-precinct must recognize the role this site performs in linking
development industrial land in the west to the business and open space functions within the Shire Business Centre site. The
nature, design and operation of any activites in this sub-precinct will be key factors in ensuring compatibility _
‘with development in other sub-precincts.
a, Development in this sub-precinct is generally subject to the performance standards contained within Section
6.4 of the Schedule to the Planning Scheme, as if the land were included in the Industry Zone.
. b. Development to have strong pedestrian and bikeway connectivity with Sub-Precinct £4 and industrial land to

the west.
¢. Vehicular parking will be pravided on-site.

 

GADEP\Projects\SBC\Masterplan-FinalApro4.doe

Section 104

Page 102


[OCR of page images]
Zot abed

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 27

  
 
 

 
 

d. Building heights of 1 and 2 storeys, : .
e, Development in this sub-precinct will have significant relationships with development in Sub- Precinct E4,
f, Development will acknowledge the open space function of the adjoining Sub-Precinct OS2,

g. Minimum open space may be 10% of the area of any development site within the Sub-Precinct provided that
the Sub-Precinct overall shalf have a minimum open space area of 15%,

Sub-Precincts E4 and E5 provide the opportunity for expansion of the Noosaville industiial estate,
Development in these sub-precincts must recognize the Tole these sites perform in jinking industrial land in the
west to the business and open space functions within the Shire Business Centre site, The nature, design and
Operation of any activities in this sub-precinct will be key factors in ensuring compatibility with development in
other sub-precincts.

a. Development in these sub-precincts is generally subject to the performance standards contained within
Section 6.4 of the Schedule to the Planning Scheme, as if the land were included in the Industry Zone.

b, Development to have strong pedestrian and bikeway connectivity with Sub-Precinct B1 and B3,
c. Vehicular parking will be provided on-site.
d. Building heights of 1 and 2 storeys.

e. Development in these sub-precincts will have significant relationships with development in Sub- Precinct B3.
In this regard development in Precinct E5 may have a dominance of business activity to complement
development of Sub-Precinct B3.

f. Minimum open space may be 10% of the area of any development site within the Sub-Precincts provided
that each Sub-Precinct overall shall have a minimum open space area of 15%,

 
   
 
   

 
    
     

   
 
 
   
  
  

 
    
 
  
  

 
    
   

Provision of additional land for
industrial and business
purposes.

9.3.1.2, 19.3.1.9,

Employment
19.3.1.12

   
    
    
 
 
 
 

 
     

{2.9 ha & 2.1 ha}

  
     
      
     

  
      

   

      
  

   
  

   
     
 
 
 
 

    
     

   
    

19.3.1.2, 19.3.1.9,
193,112

Sub-Precincts E6 and E7 comprise a node with unspecified employment opportunities that may be developed
in the later stages of the Shire Business Centre. Itis expected that there will be a mixture of uses and that
business associations will be formed between this node and Sub-Pracinct E1.

a, Floor space allocations will be determined on specific applications.

c. AS a guide, plot ratio for development within the sub-precinct would be anticipated of the order of 0.6 and a
site cover of no greater than 50%,

4. Parking Is to be provided for on site, generally at the side, rear or undemeath of buildings,

e. Bulldings are generally to have a presentation to the loop road with a setback of the order of 6 metres

£, Building heights of 1 and 2 storeys.

g. Development to have strong visual linkages with Sub-Precincts E1, OS1 and OS2.

h, Development to have strong pedestrian and bikeway connectivity with Sub-Precincts B1 and £1.

i, Development expected to be staged consistent with market need. :

j. Development in these sub-precincts will have significant relationships with development in Sub- Precinct E14.

E6 & E7 Employment Business, Offices
and Transit (3.1 ha

&37ha)

Provision of employment
opportunities in unspecified

business areas and an inter-
regional transit facility in E6,

    
  
 

        
     
   
    
    
    
 

G:ADEP\Projects\SBC\Masterplan-FinalApr04.doc

   

Section 105

Page 103


[OCR of page images]
Co 6h OL OL OL

Reveal ten ‘eon

 

Environmental (11.3
ha & 12.6 ha))

/

GADEP\Projects\SBC\Masterplan-FinalApr04.doc

€0T abeg

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2

     

tot

These opn space areas 49.3.1.11, 19.3.1.42
underpin the key ecological
values of the Site, They are
key open space linkages
providing corridor connectivity
to the Noosa National Park
and a riparian open space to
Eenie Creek. The objective Is
to protect and maintain these
areas as near as possible to
their natural state,

k. The northem section of Sub-Precinct E6 may contain a smaller intemal precinct set aside for an inter-region
transit facility. . .

|. Development in Sub-Precinct E7 will acknowledge the open space function of the adjoining Sub-Precinct
os2

m. Minimum open space may be 10% of the area of any development site within the Sub-Precincts provided
that each Sub-Precinct overall shall have a minimum open space area of 15%.

Sub-Precincts OS1 and OS2 are intended to protect plant communities and habitats of conservation
significance, to help protect water quality in Eenie Creek, to maintain the Doonan Link, to protect wildtife of
conservation significance (in particular the Elf Skink, Wallum Froglet and Silvia's Blind Snake) and help to
buffer the National Park. The Increase in human activity and the environmental need for occasional firing of the
vegetation will provide key challenges to the overall management of the Shire Business Centre site.

a, Land within Sub-Precincts OS1 and OS2 is to be dedicated to the Crown or Council for open space
purposes, That part of the Sub-Precinct adjacent to the Recreation/Mixed Use Precinct may be acceptable in
private ownership depending on the nature of any proposed use. .

b. No development except for tracks for pedestrian access or for essential environmental management
purposes.

c, Pedestrian access is to be limited to designated tracks.
d. Vehicular access, apart from for essential environmental management purposes, will be precluded.

 

Section 106

Page 104


[OCR of page images]
 

vOT abed

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2

$3 Open Space | Preservation of visual
amenity (2.2 ha)
OS4 &OS7 Open Space Environmental These open space areas are
Drainage (2.6 ha & natural wetlands and drainage
| 4.3 ha) pathways that drain info OS2.

. 0S4 has important ecological
values associated with vegetation
of conservation significance and
habitat for Elf Skinks and Wallum
Froglets, The objectives are to
protect the ecological values and

. to provide drainage paths for
polishing previously treated
stormwater runoff, as well as
providing key open space for
aesthetic purposes through the
site.

OS5 & OS6 Open Space | Preservation of Visual | Provision of significant landscape
Amenity (0.2 ha & 0.2
ha)

buffering to the intemal loop road
GADEP\Projects\SBC\Masterplan-FinalApr04.doc

This open space area consists of
narrow strips of native vegetation
fringing Eenie Creek Road and
Walter Hay Drive. The objectives
are to provide landscape screening
to extemal main roads and to
contribute to habitat finkages
through the Site.

 

  

29

The intent of Sub-Precinct OS3 is to provide a landscape screen between the site and the two principal frontage
toads Walter Hay Drive and Eenie Creek Road. The role of this screen Is not to hide the development from view,
as itis an important urban centre needing identification. However it is not intended that development within the
site be oriented to the principal roads and the screening is to be an effective deterrent to potential for advertising
or buildings to be featured from the roads. Itis desirable for the parts of this Sub-Precinct to be held in a suitable
tenure to ensure their long term availability for screening vegetatton.

a, Whilst the aim of these precincts is to retaln existing vegetation adjacent to the two principal frontage roads,
some disturbance may occur during construction of the main roads and access points. In this instance, re-
vegetation using species endemic to the Site will be necessary. Enhancement planting to enhance screening
and habitat values is to be carried out using species endemic to the Site

b, These buffers are to ensure that the development maintains an intemal focus, whilst allowing entry
statements at access points along the main roads.

c, “The tenure of O53 is to be park reserve over that part containing vegetation to be protected, or otherwise
secured for open space purposes in the long term (eg. environmental covenant).

d. Those sections of OS3 that adjoin the roads linking Walter Hay Drive and Eenie Creek Road to the intemal
oop road are permitted to be landscaped as an entry area and retention of existing vegetation is not a
requirement, but some existing vegetation could still contribute to the desired effect.

Sub-Precineis OS4 and OS7 comprise the existing defined natural drainage path through the site. The intention
is to retain this in its natural state where possible, however the need to ensure that run-off waters are polished
necessitates some engineering of the drainage works.

                

  

  
      

The intent of Sub-Precincts OSS and OS6 is to create an open space element adjacent to part of the intemal

loop road and between precincts. These areas are to assist in a visual frame and reference for traffic on the

pe (oa and for development in Sub-Precincts B3, E4 and E5. They are also intended to provide intemal
al inkages.

a Easting vegetation Is to be retained though some minor disturbance may occur through the provision of
services,

19.3.1.9

 

       
     

Section 107

Page 105


[OCR of page images]
 

C.

Cn

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2

on

 

Residential Employment Support

(0.7 ha.)

Provision of the residential support
facilities for other key components
of the Shire Business Centre.

Recreation / 19.3.1.9 & 19.3.1.12
Mixed Use /

Open Space

Minor Recreation
Use, Minor Mixed

Use or Open Space
(1.6 ha)

Retention of open space character
and values and protection of
adjacent national park +

SOT abeg

GADEP\Projects\SBC\Mastetplan-FinalApr04.doc

b. Existing vegetation may be enhanced by additional plantings of appropriate species.
c, Revegetation of any areas disturbed during construction activities is to be carried out using species endemic
to these open space areas.

Sub-Precinct RES is intended to provide support accommodation to other key sub-precincts on the site,
Consequently, there will be strong associations between the use of Sub-Precinct RES and that of Sub-Precincts
E1 and E2 and other sub-precincts. Residential development is intended as an adjunct to development in other
sub-precincts, rather than stand-alone accommodation for permanent occupation. Accommodation that is not
self-contained such as hostel style would be appropriate.

a. Specific floor space allocations will be considered as part of any relevant development application, however
by way of guide, plot ratio for development within the sub-precinct up to 0.6.

b. Building heights of up to 2 storeys.
c. Development to have strong visual linkages with Sub-Precinct OS4,

d, Development to have strong pedestrian and bikeway connectivity with Sub-Precincts B1, E1 and E2.
e. Vehicular parking will be provided on-site. .

f, Development expected to be staged, consistent with development in Sub-Precincts E1 and E2.
g. Development will acknowledge the open space function of the adjoining Sub-Precinct OS4.
h, The Sub-Precinct shall have a minimum open space area of 15%.

i, External building design treatment shall accord with provisions of the Residential Low Density Zone of the
Planning Scheme .

This sub-precinct is constrained for development [See Section 3.7] and may be assessed for use for minor
recreational development. Altematively the land may be used for a minor mixed use development including
business activity that need not be associated with the balance of the site. Retention of open space values both
on the site and for the adjacent national park are important outcomes.

a, Development to be low intensity and involve retention of substantial existing vegetation.
b, Plot ratio to be less than 0.1
¢, Buildings to be one storey.

 

Section 108

Page 106


[OCR of page images]
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 31
5.0 CODES
Specific Codes for the site will be developed by Council as part of the preparation of the IPA Planning

Scheme for Noosa Shire.

H g:\dep\projects\sbc\masterplan-finalapr04.doc

Page 106

]

~ 4

Section 109

Page 107


[OCR of page images]
 

 

 

 

 

 

 

 

 
   
  
  
 
  

| ____. rotet ares 0.2 He

E4

oka rea j
29 He

 

 

 

 

 

SCALE 1:3500 (43)

be

 

QS3..

  
 

Tote Ares 1.9 Ho

1
aves

 

Tolet area 1.SHo

ot Area 0.7 ra \ \

oss

Total Area 2.8 Ho

OS2

Total ares 12.6 Ho

 

  
 

 

 

N

 

Fatal Aeeo 3.7 Ho

53
sprees

 

NOOSA SHIRE BUSINESS CENTRE
MASTER PLAN - STAGE 2 - MP2 PLAN

    

Notional Park
sit 54221

oS!

joss
oi

LEGEND

B1 BUSINESS
(Retail Centre and Business)

B2 BUSINESS
{Car Parking & Offices)

B3 BUSINESS
(Showroom, Office & Business)

E1 EMPLOYMENT
(Technology bosed R&D
Business Offices & Civic)
€2 EMPLOYMENT

(Educative & Environmental
R&D Business & Offices)
E3 EMPLOYMENT
(Environmental R&D
Business & Offices)

4 EMPLOYMENT

(Industry & Business)

123
waren

—5 EMPLOYMENT
(Industry & Business)

—6 EMPLOYMENT
(Business Offices & Transit}

EMPLOYMENT
E7 (Business & Offices)

O81 OPEN SPACE
(Environmental)

O82 OPEN SPACE
7 (Environmental)

peyoron

OS3 OPEN SPACE
(Preservation of Visuot Amenity)

O84 OPEN SPACE
(Environmental Drainage)

O85 OPEN SPACE
(Preservation of Visual Amenity}

OSG OPEN SPACE
(Preservotion of Visual Amenity)

OS7 OPEN SPACE
(Environmentat Drainage)

RES RESIDENTIAL
(Employmen|, Support)

IREC/MU RECREATION MIXED USE
Minor recreation/
‘minor mixed u: 2
or open spaces) — rewovas

. BICYCLE PATH
_. WALKING PATH

 

 

 

L.

Page 107

Section 110

Page 108

Section 111

Page 109


[OCR of page images]
 

 

Page 30

Annexure 6 — Plan showing Public Road required from the Land for Walter Hay Drive

Page 109

Section 112

Page 110


[OCR of page images]
 

                    

           

8 @

a:

RESUMPTION POINTS

 

  

 

 

      

                                      

     

   

 

 

PONT CO-ORDINATES TO-DROINATES PONT CO-ORDINATES CO-ORDINATES
No._| Easting | _nonmime—|_PEMARKS EASTING REMARKS | Wo. NORTHING EASTING | _ NOR
504873.095 304672398 35 7077479.988

 

   

FOTTAS. S93,
"7071657.163

504 715.486

 

 

   

'504736.3
504697.271
SO47IS.A71
506726,066
500780.936
S047w1565 {707726357
'50678L613 | 1077253.963

 

 

'SOL661.682
500622.916

   

 

 

 

 
 

 

 

  

7076928.96.
"7076935.719
7076985.66

  

 

 

 

  

 

 
    

 

50475056 | 7077270.11
504006.293 [7077301426

 

 

 

 

 

 

305139.665

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PRELIMINARY

      

      

 

j= RESUMPTION PLAN
__SHEET3 OF 4

Bouche? 1D 20 30 M8 Sta

    

GHD Pty bid son scan
ESS 20 cnaroto Sveetoranane LO 4000

 

 

 

 

 

 

Section 113

Page 111


[OCR of page images]
 

 

 

 

  

 

 

 

 

 

 

 

 

 

    

 

9 Hu S0Z-07 bby NE a] imuciesomncie: Sue | cumin = = aera
¥ 40 > 1aaHS suasty] Con eeu la me Ir roe wos Oy Oe Oe he Ziiov- cadgv Auvannoa Noliarinsau Avani | @
NV1d NOUANNSD au i ee PARRA sooamonan Fa [sin yaneoven veiven i|'S
vs [3 _-maeo|
SWONNOD VSOON vo[ 3198 LON OG] _ Morey oon Peer OO
AYVNIAITSed

 

 

 

 

 

 

 

 

 

ANNILNOD

    
       

 

9 MeN

 

 

 

 

9 MN 9
OVEN
898601 WSd@®
“
eqkom jo ysireg 7
a asiaco, —| zavee0s0s | “Vet
DNILSV2_ “ON
ANIOd ‘SWUYHIY
SiNIOd NOILdWNS3Y

ystieg : YN So eu6o

 

 

 

 

Section 114

Page 112


[OCR of page images]
 

Page 31

. EXECUTED AS A DEED.

THE COMMON SEAL of the COUNCIL)
OF THE SHIRE OF NOOSA was affixed )
by authority of a resolution of the Council )

   
   
 

in the presence of:

Name of the Mayor (print)

EXECUTED by MIROSE PTY LTD
(ACN 010 278 118) in accordance with its
Constitution

P:\0312735\050903-DOC0022.doc

Page 112

Section 115

Deed of Variation

Schedule 2 Variations

The Infrastructure Agreement is varied as follows:

1.     Stockwell is included as a party to the Infrastructure Agreement.

2.     Clause 1.5, the insertion of the following new definitions:

       “Draft Framework and Character Plan means the Noosa Business Centre Framework and
       Character Plan of the Draft New Noosa Plan as endorsed by Council (with amendments) at its
       Special Meeting on 11 December 2019 a copy of which is contained in Annexure 7 (together with
       Zone Map 12 - Noosaville, the Major Centre Zone Code and table of assessment, Schedule 1
       Definitions, and the Minutes of Special Meeting on 11 December 2019 which detail the
       amendments).

       Draft New Noosa Plan means the draft New Noosa Plan publically notified between 18 February
       2019 and 20 May 2019 and incorporates the significant changes publicly notified between 16
       September 2019 and 11 November 2019, and endorsed by Council (with amendments) at its Special
       Meeting on 11 December 2019.

       Hofmann Drive Extension means the extension of Hofmann Drive through to Walter Hay Drive
       identified in dark pink on the Subdivision Plan as “Dedication of road reserve for extension of
       Hofmann Drive”.

       New Public Road means the new public road from the northern roundabout on Walter Hay Drive to
       the boundary of proposed Transit Lot 24 identified in dark yellow on the Subdivision Plan as “New
       Public Road”.

       Pedestrian Thoroughfare Easement means the proposed 4m wide easement for public pedestrian
       access along the eastern side of Lot 1 and the western side of Lots 3 and 4 crossing covenant J as
       identified in pale pink on the Subdivision Plan as “4m Pedestrian Thoroughfare Easement.”

       Proposed Lot 23 means the lot marked as “23” on the Subdivision Plan

       Reconfiguration of a Lot Application means the development application for a development permit
       for reconfiguration of a lot with respect to Lot 3 on SP246584 (Council reference RAL18/0023).

       Subdivision Plan means the subdivision plan prepared by Bennett & Francis Pty (reference
       034389.57) dated 29 November 2019 a copy of which is contained in Annexure 8.

       Transit Lot 24 means the lot marked as “24” on the Subdivision Plan”.

3.     Clause 1.5, by amending the definition of Master Plan 2 and Shire Business Centre by addition of the
       words shown in underlining below:

       “Master Plan 2 means The Shire Business Centre Master Plan: Stage 2 (MP2) adopted by the
       Council on 10 April 2003 a true copy of which is contained in Annexure 5 or as amended by the Draft
       Framework and Character Plan.

       Shire Business Centre means the Shire Business Centre for Noosa planned for development on
       land including the Land and described in Section 19.3 of the Strategic Plan or Draft Framework and
       Character Plan.”

4.     Clause 1.5, by amending the definition Open Space Area G by addition of the words shown in
       underlining below:

       “Open Space Area G means the area shown as “OS7” on Master Plan 2 which is proposed to be
       maintained as Private Open Space substantially in its natural state for environmental drainage and


HopgoodGanim Lawyers                                                                         Page 113
1958131 - 20415602_1

Section 116

Deed of Variation
       ecological purposes and is hatched on the plan in Annexure 2, with its area
       reduced to align with the area identified as “Character Landscape” on the Draft
       Framework and Character Plan (that is, up to the southern boundary of the 5000sqm Transit Lot 24
       identified in pale yellow on the Subdivision Plan) .”

5.     Insertion of a new Clause 3.4:

       “3.4 Compliance with Clauses 4.6c, 6.7, 6.8. 6.9, 6.10, 6.11 and 6.12 and 7.3

       a. The obligations of the Applicant in Clauses 4.6c, 6.7, 6.8. 6.9, 6.10, 6.11 and 6.12 and 7.3 are
          subject to and conditional upon:

               i.    the Reconfiguration of a Lot Application being approved and taking effect;

               ii.   the approval for the Reconfiguration of a Lot Application not lapsing; and

               iii. the approval for the Reconfiguration of a Lot Application not being cancelled.

       b. If the Applicant is obliged to comply, the time for compliance is contemporaneously with sealing
          of the plan for the reconfiguration or an earlier time at the Applicant’s sole discretion”.

6.     Insertion of a new Clause 4.6 as follows:

       “4.6 Open Space Area G

       For the avoidance of doubt, the parties acknowledge that:

       a. The area of Open Space Area G (which, in this clause, is taken to be a reference to Open Space
          Area G without incorporating the amendments shown on the Draft Framework and Character
          Plan) is reduced under the Draft Framework and Character Plan;

       b. The reduction in the area of Open Space Area G as shown on the Draft Framework and
          Character Plan does not alter:

               i.    the deemed contribution to community infrastructure - private open space provided by
                     clause 4.3;

               ii.   the immunity provided by clause 4.4 of the Infrastructure Agreement; or

               iii. the limitation on buffers, building setbacks and land requirements provided by clause 4.5.

       c.   The Applicant will amend the covenant over The Land so that the extent of Covenant J accords
            with the reduced area of Open Space Area G.”

7.     Insertion of a new Clause 4.7 as follows:

       “4.7 Koala habitat trees acknowledgement

       For the avoidance of doubt, the parties acknowledge that performance of Stockwell’s obligations
       under Clauses 4.1 to 4.3 of the Infrastructure Agreement is intended to fully offset the residual impact
       of any clearing of koala habitat trees required to undertake development of the Shire Business
       Centre as contemplated by Master Plan 2 (and where, to the extent relevant, amended by the Draft
       Framework and Character Plan)”.

8.     Insertion of a new clause 6.7 as follows:

       “6.7 Hofmann Drive Extension

       The Applicant shall, at no cost to Council:


HopgoodGanim Lawyers                                                                              Page 114
1958131 - 20415602_1

Section 117

Deed of Variation
       a. design and construct the Hofmann Road Extension in accordance with the
       conditions imposed on any approval of the Reconfiguration of a Lot Application,

       b. dedicate any land required for the Hofmann Road Extension.”

9.     Insertion of a new clause 6.8 as follows:

       “6.8 New Public Road

       The Applicant shall, at no cost to Council:

       a.      design and construct the New Public Road (or any part not yet constructed) in accordance with
              the conditions imposed on any approval of the Reconfiguration of a Lot Application; and

       b. dedicate any land required for the New Public Road.”

10.    Insertion of a new clause 6.9 as follows:

       “6.9 Pedestrian Thoroughfare Easement

       The Applicant shall, at no cost to Council, grant the Pedestrian Thoroughfare Easement to Council
       on terms satisfactory to both parties and in accordance with the conditions imposed on any approval
       of the Reconfiguration of a Lot Application.”

11.    Insertion of a new Part 6A as follows:

       “6A BUSHFIRE ACCESS AND PEDESTRIAN CONNECTION

       6.10       Emergency bushfire access to Walter Hay Drive

       The Applicant shall, at no cost to Council, provide an emergency bushfire access to Walter Hay Drive
       on terms satisfactory to both parties and in accordance with the conditions imposed on any approval
       of the Reconfiguration of a Lot Application.

       6.11 Emergency bushfire access to Eenie Creek Road

       The Applicant shall, at no cost to Council, provide an emergency bushfire access to Eenie Creek
       Road on terms satisfactory to both parties and in accordance with the conditions imposed on any
       approval of the Reconfiguration of a Lot Application.

       6.12 Pedestrian connection to Proposed Lot 23

       The Applicant shall, at no cost to Council, provide for pedestrian connection to Proposed Lot 23 in a
       form satisfactory to both parties and in accordance with the conditions imposed on any approval of
       the Reconfiguration of a Lot Application.”

12.    Insertion of a new clause 7.3 as follows:

       “7.3       Dedication of Transit Lot 24

       a. The Applicant shall, at no cost to Council, dedicate to Council the land described as Transit Lot
          24.

       b. For the avoidance of any doubt:

                  i.    Stockwell is not required to construct the transit centre facility on Transit Lot 24;

                  ii.   All carparking required to deliver development on Transit Lot 24 is contained on Transit
                        Lot 24;


HopgoodGanim Lawyers                                                                                    Page 115
1958131 - 20415602_1

Section 118

Deed of Variation
               iii. Stockwell agrees not to claim any offset, refund, or to make any
                    conversion application under the Planning Act 2016 in relation to the
                    dedication of Transit Lot 24 to Council.”

13.    Insertion of a new clause 10.6 as follows:

       “10.6 Development Intensity

       For the avoidance of doubt, the parties acknowledge that:

       a. The Draft Framework and Character Plan identifies different uses in different precincts to those
          shown on Master Plan 2 (which, in this clause, is taken to be a reference to Master Plan 2
          without incorporating the amendments shown on the Draft Framework and Character Plan);

       b. The intensity of development contemplated by the Draft Framework and Character Plan does not
          exceed the intensity of development contemplated by Master Plan 2.”

14.    Insertion of a new Annexure 7 Draft Framework and Character Plan as attached and marked “Draft
       Framework and Character Plan”

15.    Insertion of a new Annexure 8 Subdivision Plan as attached and marked “Subdivision Plan”




HopgoodGanim Lawyers                                                                          Page 116
1958131 - 20415602_1

Section 119

                                                                     EE
                                                                          NIE
                                                                                CR
                                                                                     EE
                                                                                          KR
                                                                                               OA
                                                                                                  D
                                                  COMMERCE CT                                                                                                            D
                                                                                                                                                                 ROA
                                                                                                                                                   EC   REEK
                                                                                                                                              EENI

                                                                                                                                                               Noosa
                                                                                                                                                              National




                                          S ST
                                                                                                                                                                Park




                                         SANDER
           LEO ALL
                     EY ROAD




                                                        REET
                                                     TION ST
                                                                                                                                    Transit




                                                  PR O D U C
                 AC TION
                         ST       REET                                                                                      Civic
                                                                                                                                                   AY DRIVE
                                                                                                                                                 WALTER
                                                                                                                                                        H




            RENE ST
                      REET
                                                                                                                                                                             Draft Framework and Character Plan




                                                                                                                                                                  Noosa
                                                                                                                                                                 National
                                                                                                                                                                   Park




             SCALE 1:4000 (A3)
                                                                                                      Framework & Character Plan
                                                                                                           New Noosa Plan
             0       40          80                            200




Page 117

The text continues on section 120.

Used in these records

About this file

File size
6.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20).pdf · 6.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗