Original source · versioned page text
Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20)
ot MBNeyfer., ~ @ | COUNCIL ban hn Se Column 1 Activity group Column 2 Uses Outermost projection outermost projection, of a building or structure, means the outermost part of the building or structure, other than a part that is— (a) retractable blind; or (b) a fixed screen; or (c) a rainwater fitting; or (d) an ornamental attachment. Plan of development plan of development means a plan that forms part of a development approval that regulates the type or forms of development on a site and is included in Table SC1.2.3 Plans of development. Planning assumptions planning assumptions means an assumption about the type, scale, location and timing of future growth in the local government area. Plot ratio plot ratio means the ratio of the gross floor area of a building on a site to the area of the site. Predominant slope predominant slope is the slope of a house site area, building footprint or use area measured perpendicular to the contours of the area and calculated as follows: Predominant slope (%) = (x / y) x 100 where: x’ is the vertical distance in metres between the highest point and the lowest point of the area; and ‘y’ is the horizontal distance in metres measured in a straight line between the highest point and the lowest point of the area. Where the area has more than one predominant slope, eg. a knoll or a gully, the average of the predominant slopes shall apply. Prescribed tidal work prescribed tidal work - tidal work (operational work undertaken in tidal waters) which is completely or partly within a local government tidal area Private open space private open space means outdoor areas of the premises set aside for the exclusive use of occupants of a dwelling or accommodation unit that are accessed directly from living areas. The term includes courtyards, decks, terraces, balconies, and verandas and hard and soft landscaping. Probable maximum flood (PMF) probable maximum flood (PMF) means the largest flood that could reasonably occur at a particular location, resulting from the probable maximum precipitation. The probable maximum flood defines the extent of flood-prone land. Generally, it is not physically or financially possible to provide general protection against this event. PMF PMF - probable maximum flood means the largest flood that could reasonably occur at a particular location, resulting from the probable maximum precipitation. The probable maximum flood defines the extent of flood-prone land. Generally, it is not physically or financially possible to provide general protection against this event. Probable maximum storm tide (PMST) probable maximum storm tide (PMST) means the maximum storm tide level that may be expected from the combination of meteorological and hydrological conditions that are reasonably possible in a particular locality, including the predicted impacts of climate change. PMST PMST - probable maximum storm tide means the maximum storm tide level that may be expected from the combination of meteorological and hydrological conditions that are reasonably possible in a particular locality, including the predicted impacts of climate change. Projection area **FINAL DRAFT - Post Consultation 2019** projection area means a part of the local government area for which the local government has carried out demand growth projection. Page 35 of 42 Page 199
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.