Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20)
ot MBNeyer.
~ @ | COUNCIL
————
Column 1
Activity group
Column 2
Uses
Sequential clearing
sequential clearing means—
(a) amethod of clearing trees whereby felling operations are conducted in discrete
stages such that wildlife is provided sufficient time and space to enable them to move
from the clearing site of their own volition without the need for human intervention to
remove or relocate them; and
(b) _ the felling of limited numbers of trees at any one time at the clearing site and not
clearing where native wildlife is present; and
(c) not the clearing of all trees on site in a single, uninterrupted operation.
Service catchment
Service catchment means an area serviced by an infrastructure network.
Setback
setback, for a building or structure, means the shortest distance, measured horizontally,
between the outermost projection of the building or structure to the vertical projection of the
boundary of the lot where the building or structure is.
Site
site, of development, means the land that the development is to be carried out on.
Examples—
1. If development is to be carried out on part of a lot, the site of the development is that
part of the lot.
2. — If development is to be carried out on part of 1 lot and part of an adjoining lot, the site of
the development is both of those parts.
Site cover
site cover of development, means the portion of the site, expressed as a percentage, that
will be covered by a building or structure, measured to its outermost projection, after the
development is carried out, other than a building or structure, or part of a building or
structure, that is—
(a) in alandscaped or open space area, including, for example a gazebo or shade
structure or;
(b) | abasement that is completely below ground level and used for car parking; or
(c) _ the eaves of a building; or
(d) asun shade.
Slope
**FINAL DRAFT - Post Consultation 2019**
slope means:-
(a) _ for the purpose of reconfiguring a lot:-
(i) where the proposed lot is contained wholly within a single slope category
shown on a slope analysis, the slope of that category; or
(ii) | where a proposed lot is contained within more than one slope category shown
on a slope-analysis, the predominant s/ope of the use area, as follows:-
(A) | where the house site area or use area is contained within one slope
category shown on a slope analysis, the slope of that category; or
(B) | where the house site area or use area is contained within more than one
slope category shown on a slope analysis, the slope is the average of all
predominant slopes of the house site area or use area.
(b) For the purposes of building works or material change of use, the slope of the building
footprint or use area is that determined as follows—
(i) where the building footprint or use area has one predominant slope, that slope;
(ii) | where the building footprint or use area has more than one predominant slope,
the average of all predominant slopes, provided that—
(A) _ the slope shall be determined to the nearest whole number; and
(B) where there is any question about the determination of slope, the slope
shall be as determined by the Assessment Manager.
Page 39 of
42
Page 203
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.