Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20)

of 220

Page text read automatically using OCR, there may be inaccuracies

a ns

 

NOOSA COUNCIL IDAS Development Application Decision Notice 29

215,

216.

217.

218.

219.

- 220.

221.

222.

223.

224.

225.

As Constructed drawings certified by a registered surveyor and a registered Professional Civil
Engineer of Queensland showing the extent and finished levels of the filling works are to be submitted
for Council's records, prior to the use commencing.

These drawings must fully detail levels for all engineering works including water supply and sewer
reticulation, drainage structures, building floor levels, finished ground levels effluent trenches and
Pavement surface levels. Drawings shall be on transparencies, a hard copy highlighting any changes
from design and in electronic format on an IBM PC compatible floppy disk in a format capable of
integration with Council’s computer system.

Fire hydrants are to be provided throughout the development in accordance with Council and
Queensland Fire Service standards.

Conduits and kerb markers shall be installed for all necessary service crossings of roads to Council's
satisfaction. An. "As Constructed" plan showing the locations of the conduits shall be submitted to
Council prior to acceptance of the works “On Maintenance”.

Prior to the use commencing, a State Survey Mark shall be provided within the site. It shall be levelled
and located to the requirements of the Manager - Land Development. A ‘Form 6’ shall be submitted for
Council's records.

Each State or other Permanent Survey Mark shall be installed clear of overhead vegetation, making it
Suitable for Global Positioning Equipment, and accurately connected to at least one real property
corner by a registered Surveyor.

The applicant shall satisfy all relevant requirements of the Water Act 2000.

The developer is to implement the use of small-scale solar photovoltaic powered pumps for irrigation
systems and power for outdoor lighting. The development should utilise a significant amount of
tenewable energy produced on site. .

Use of occupancy censors for HVAC, Lighting systems and Automated -Toilet Flush systems were
appropriate.

Use only native tree species for landscaping to reduce the amount of water needed to be pumped for
on site irrigation. Only drip irrigations systems or systems with similar or better water and energy
conservation qualities are to be used on site,

Development does not result in obtrusive lighting as described in the Australian Standards AS4282
“The control of the obtrusive Effects of Outdoor Lighting”. :

Rainwater is captured on site and used to irrigate garden beds and for flushing toilets. Rainwater
storage tanks should be plumed, to allow refilling from mains supply, as weil as utilize the force of
gravity for distribution.

All infrastructure within the site shall be maintained to the reasonable satisfaction of the Manager Land
Development.

A o.\database\onestop\decision.doc

Page 62

Log in to download the original (Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.