Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20)

of 220

Page text read automatically using OCR, there may be inaccuracies

 

CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 2

This Plan (MP2) is the second stage of the master planning process for the Noosa Shire Business Centre and follows on
from the Shire Business Centre Master Plan: Stage 1 - Concepts (MP1). This document together with MP1 comprises a
Planning Study prepared as part of the supporting documentation for The Noosa Plan: Choosing Futures process. It is
intended to support a planning scheme that is consistent with the requirements of the Integrated Planning Act. MP2 is
also consistent with the master plan process nominated by the 1997 Strategic Plan.

Project: Shire Business Centre Master Plan
Project Type: Master Plan Stage 2
Report Author/s: Raul Weychardt plus material from MP1 prepared by Paul Summers

Completion Date: April 2003

Status of Report: Final - Adopted by Council 10 April 2003

Page 77
G:\DEP\Projects\SBC\Masterplan-FinalApr04.doc

Log in to download the original (Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.