Original source · versioned page text
Attachment 5 - Deed of Variation to Infrastructure Agreement (22.01.20)
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 9 TABLE 2.3: CONSTRAINTS INFLUENCING THE MASTERPLAN ISSUE CONSTRAINT Flooding No development below RL 3.0 metres Potential Acid Sulphate Soils Avoid exposure of PASS if possible. Otherwise development in accordance with the State Planning Policy on Planning and Managing Development Involving Acid Sulfate Soils Habitat links No development that would place at risk the functioning of the Doonan Link and provision of habitat links for movement of native fauna throughout the Site Eenie Creek and associated wetlands and drainage lines No change in hydrological regimes and water quality of Eenie Creek and its associated wetlands and major drainage lines Vegetation of Conservation Significance - ‘Of Concern’ Regional Ecosystems No development that would place at risk the long term viability and sustainability of ‘Of Concer’ Regional Ecosystems on the Site Fauna of conservation significance No development that would place local populations of these species at risk Proximity of Noosa Airport Types of land use that are able to sustain possible future aircraft noise Values of adjacent Noosa National Park Provision of vegetated buffers adjacent to the national park and provision of habitat links to and from the national park. ‘GADEP\Projects\SBC\Masterplan-FinalA ps04.doc Page 84
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.