08/1994 - Preliminary Building Approval - Dwelling Addition - 2 Garage [As Published] · 172008.1994
INTEGRATED PLANNING ACT 1997
Nae ST
IDAS Assessment Checkfist, Version 21.3, 9 May 2008
S ECTI O N 3 Section 3 must be completed when the application seeks approval to reconfiguring. a lot. IPA, schedule 8, part 1. table 3
| STATE-CONTROLLED,ROAD #*
SEF nd
34 |Is y part of the premises located i in part of a future State-controlled road, or within 100m of a State controlled toad?
lo
If no, is the proposed reconfiguration listed in integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold?
LI No (Yes - The application must be referred to the Department of Main Roads (DMA) as Concurrence Agency.
O1 Yes ,
If yes, will the proposed reconfiguration result in the following?
(i) An increase in the total number of lots
, -(ii) Anin increase in the total number of lots ts abutting ne cen oe 4 ie
a : lt we ate
SONIA AGEMENT DISTRIC ;
3.2 part of the premises within.a coastal, management district?
No-Gotoa33 [] Yes- This appteation | ‘must be referred to the Environmental Protection Agency ‘iepA) as Céneunence sie ” 4
iP Reguilatic schedule 2 table 2, item 13(a).." re foe . '
. [VEGETATION CLEARING: ;
3.3 | Do the premises include.a lot containing, the. following? 4). 0! : “ a . ye Jaf
(i) A category 1, 2 or 3 area shown on a Property Map of. Assestable Vegetation ‘(PMAV DONo [Yes
(ii) if there is no PMAV for a lot, remnant vegetation : ‘ [No {J Yes
If yes to eittier or both (i) or (ii) above, aré’2 dr’ ‘More lots proposed to be created?
No-Gotoa34 ((] Yes ‘
It yes, is any lot, before the proposed reconfiguration, 2ha or larger?
No - Go toa3.4 Ces , se .
It 88; is the sizé of. proposed 8 be cieated: 25ha or smaller? ; . “
|] — }No- Go" to. 03.4
ae 6 ”
iP Regu schedule 2, table 2, item 4,
“agar x and Wal or NE) as § Concurrence ve Agere. . oe
[EASEMENTS
3.4
|. Regulation, schédule 2, table 2, itam 20{a) (electricity easement): IP Regulation, schedule 2, table 2. item 32 (pipeline easement).
Is any part of the premises subject to an easement?
No'- Go to 03.5 C1 Yes - ‘Answer both (a) and (b) below a
(a) _ Is there an easement in favour of a distribution entity or ‘transmission entity under the Electricity Act 1994 for a transmission
grid or supply network under that Act?
O No ED Yes - This application must be referred to the entity as Advice Agency.
(b) is there an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum Act 1923 for the
. construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
CONo CJ Yes - This application must be raferrad to the licence holder as Advice Ageficy. . “
Js gny part of the premises situated Within 100m of a substation site under the Electricity Act 1994?"
No - Go t9 03.6 oO Yes +, This application must be referred to the entity responsible for the substation as Advice Agency.
{P Regulation, schedule 2 table 2 ir 200.
AT
.Yes-; - (Complete: Form: 4; Part J) This. application must be. teterted to the. Department-of Natural. Resources. .
aa
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1994 - Preliminary Building Approval - Dwelling Addition - 2 Garage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.