Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

08/1994 - Preliminary Building Approval - Dwelling Addition - 2 Garage [As Published] · 172008.1994

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

mF red

 

 

n 9? 7 ra : : eet Te ag
i , « . .
Cy * My
“ .
INTEGRATED PLANNING ACT 1997 - IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL’ PLAN: Ftica ae sae!

     

 

3.11 A | Is any part of the premises within the South East Queensland (SEQ) Regional Plan area?
No -Gotoa3.118 ([] Yes

If yes, is the application seeking approval for subdivision?'?
(No -Gotoas12 [Yes - Answer both (a) and (b) below

{a) Is any part of the premises located within a Major Development Area and not included in‘a structure plan as defined under
the SEQ Regiona! Plan Regulatory Provisions?
[INo- Gotom) (Yes
{fyes, indicate whether or not the following circumstances apply to the subdivision proposal - (Tick it appficabte)
The subdivision: oy ee ; Joo F
“{() Creates lots with a size greater than 100 hectares, tt vow i: id: r ~ Oo No. Dives

at

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(i) Creates a residual lot Oo: (48 DNo E\Yes
: {iii) Creates the same number’ or fewer lots than the iter of tots being subdivided - ye oO No" Oo Yes’ :
(iv) Creates a single additional lot when a an existing lot is severed by a.road that was: “« {DINo [1 Yes
gazetted before 2 March 2006 mo, . 2 ft
(v) Creates a single additional lot for an emergency services facility . ; CINo Chvess! “4
“ ) Creates a single additional | lot for a water cycle management infrastructure Oo No C1Yes “
(vii) Creates a single additional tot for’ waste management facility. » ‘ (1 No - | Yes .
(vill) Creates a single additional lot for telecornmunications infrastructure Ono | ves
(ix) Creates a single additional lot for electricity infrastructure Ono {0 Yes.
(x) Creates a single additional lot for cemetery or a crematorium Ono |( Yes

 

(xi) Is carried out in association with a development approval for a material change of use of} (No |(1 Yes
.premises that has not lapsed, if the development approval was for a development
application that was made before 31 October 2006

 

(xii) 1s carried outin association with a development approval for a material change of use of Ono {7 Yes

— —-—— - |---| +». —- — |... premises.| ‘that -

“ *.. was given for evelopment made assessable under SEQ’ Regional Plan Regulatory :
Provisions, section 2.1 or 2.2; and

« — has not lapsed

 

 

{xiii} Creates lots for a purpose or is being carried out in association with development other other Dino jC Yes:
than those stated in (i) - (xii) above

 

 

 

 

 

tse
If yes to other development under (xii) above - This application must be referred to the Department of infrastructure and Planning
{DIP) as Concurrence Agency. Answer (b) on the next page of this Checklist

 

 

 

 

31 For the purposes of the SEQ Regional Plan, subdivision means ~ (a) creating a lot by subdividing another lot, or (b) dividing land into parts by agreement (other than a lease for a
term, including renewal options, not exceeding 10 years) rendering Giferent pats of @ lot immediately available for separate disposition or separate occupation)
"<

. Page 17 . 4

 

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1994 - Preliminary Building Approval - Dwelling Addition - 2 Garage [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.