Council archive · source document
08/1994 - Preliminary Building Approval - Dwelling Addition - 2 Garage [As Published] · 172008.1994
* tr Saehie *
so - ve 8
“ane .
“ * +
INTEGRATED PLANNING ACT 1997 “= Part E, Version 3.1, 3 March 2008
Nature of the works” Awe ae ent
oe rey, x —
4. Natyre of work that requires assessment against a planning scheme: .,. 7+
LxBuilding work - Complete Table A CO Operational work - Complete Tate 8B
Table A we Sone
(i) What is the nature of the building work made assessable i ini the planning “schcine?
[ Dweniwt, Aa0's AND Mew Cee AlEeES (rv)
(ii) Are there any current approvals associated with this application? (ea. metertel change of use)
No Yes ~ Provide details below
f* List of approval referencels”
[t.-
| “ox Date approved =~" |* Date ’approval lapses known)
Table B ‘
(i) What is the nature of the operational work made assessable in the planning scheme?
LD Roadworks (C1 Stormwater ; (CO Water infrastructure (CD Clearing vegetation under the planning scheme
(2 Drainage works ~~ _L] Earthworks (1 Sewerage infrastructure
(Landscaping oO Signage LC Other - Specity
(iii) What type of approval is being sought? (NOTE: If you have indicated muttiole operational works in question (i) above and your answers fo this question .
would be different for different operational work, it may be more appropriate to provide, these details in an attachment to this form)
[1 Development Permit CJ Prefiminary Approval C1 Both (specity betow) /
(iv) Is the operational work necessary to facilitate the creation of new lots (ie. subdhasion)? . a
(CJ No C1 Yes.- Spécity the number of lots being created . : r ve
w) Are there any current approvals associated with this application? (¢.9. Development Permit or Preliminary Approval for MCU or reconfiguring a ti)
No O Yes Complete Table B(a}
Table B(a) ., List of approval references" 0" ak hae /3
1;
Date approval lapses (if known),
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour)
ee
Method of lodgement:
Advice for r completing Part E
General advice
. Part A must also be completed forall IDAS development appicatton.
« The applicant is responsibie for answering ail questions fully and correctly, untess following a response there Is a statement to go directly to another question.
Qi [A development permit authorises development to occur, while a preiminary approvet is a step in the approval process and does not authorise development to ocaur.
Page 1
he
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1994 - Preliminary Building Approval - Dwelling Addition - 2 Garage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.