Council archive · source document
Archs - 2023-11-16T162602.571 · EXE23/0037
Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
stormtech tile insert drain
in bronze
1/ A518
4/ A518
2/ A518
5/ A518
2000
490
SD Bath View 1 SD Bath View 3
4 1 : 25
2 1 : 25
microcement on
walls
microcement on walls
and in niche
1/ A517
-/ ---
door swing
tr
230
mxr
trh
900
SD Bath view 4 SD Bath view 2
5 1 : 25
1 1 : 25
JMF DESIGN PTY LTD CLIENT: LOCATION: Project number NO: DATE: AMENDMENTS:
27 Sunhine Beach Road
Noosa Heads Q 4567
Rebecca & Ryan Cutler Mossman 2023 Proposed SD Bathroom & Bedrooms 20/10/2023 Proposed design
33 Mossman Court,
e: [email protected] Noosa Heads Qld 4567
www.jmfdesign.com.au A518
PROJECT: Date Scale Drawn by Author
Proposed SD bath
3 House Renovation 05/08/23
Drafting: Jessica Fleming 1 : 25 Checked by JMF
QBCC 15200440
1 : 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Archs - 2023-11-16T162602.571.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.