Council archive · source document
Martoo Planning Report · 132007.2446.03
Attached to the e-mail Other Change application (Extension of Existing Visitor Hostel - 21 Beds) - 132007.2446.03.
proposal report 4.0 Proposed development details The applicant seeks to change the existing approval for visitor accommodation over 102 Pacific Avenue (Flashpackers – Council reference 2007/2446) by incorporating the adjoining site at 106 Pacific Avenue into the visitor accommodation development. 106 Pacific Avenue currently contains 3x1 bedroom units and the applicant seeks approval to renovate the units and convert them to visitor accommodation for a further 21 beds and relocated managers residence. The two sites will be operated as one and utilise existing reception, kitchen, laundry and communal recreation areas. Proposal plans and the existing approved plans (2007/2446) are included at Appendix B. The existing units at 106 Pacific Avenue are proposed to be renovated internally and externally and slightly extended by enclosure of the existing patios to provide a cinema room and 3 x 6 bed dorm with ensuite bathrooms and staff and managers quarters. Some minor alterations to the existing hostel will occur with regard to increased refrigeration space in the communal kitchen area. The existing driveway and cross over at the front of the site is to be retained with one of the existing carport spaces retained and a new space provided to the northern boundary. The remaining two spaces are to be converted to a covered communal area for the entire site. An acoustic fence is proposed to be provided around the existing and new carpark at the front of the site in accordance with the recommendations of the noise report. Table 3: Summary of development aspects Material change of use Building height New building: 1 Storeys and 3 metres Gross floor area (GFA) New building: 154.2m2 Site coverage New building: 39.6% Car parking Carparking: – 2 spaces Total carparking for site : 6 plus minibus Site access Existing site access from Pacific Avenue to be utilised. Proposed servicing The site is connected to all urban services such as water, arrangements sewer and electricity. Staffing management arrangements for reception and maintenance will not alter, however an additional contract cleaner is likely to be required for the new rooms with cleaning hours between 9.30 and 12 noon. Hours of operation will not alter from the existing hostel hours with no changes to the policy of ‘no noise in communal areas after 10pm’ which is regulated by the on site night manager. martoo consulting town planners + urban designers + development managers page 10 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Martoo Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.