Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Planning Report - Other changes and OPW

of 15

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                   proposal report




4.0 Proposed development details
The application seeks an Other Change to MCU18/0009.02 Multiple Housing Type 3 – Retirement
and Special Needs 32 beds) to provide an additional parking area on the adjoining lot at 4 Carramar
Street, Tewantin and rearrange the carparking layout on the existing Carramar site. The proposal
includes:

      New carparking area on Lot 2 on RP177554 (4 Carramar Street) for 14 cars.
      Access to new carparking area via Lot 2 on RP177554 (186 Cooroy Noosa Road).
      Carparking area to be bitumen sealed.
      No lighting to be provided to carparking area.
      Carpark to be opened from 6.30am to 4.30pm with gates closing the carpark after these
       hours.
      Carpark to predominantly used by staff.
      Change to carparking spaces on Lot 2 on RP177554 (186 Cooroy Noosa Road) including
       relocation of 12 carparking spaces at Area 7 and 2 spaces at Area 10 to Lot 2 on RP177554.
      Loss of one space on Lot 2 on RP177554.
      Existing fence to be retained.

The revised carparking layout and use of Lot 2 is a result of a review of the existing maintenance
area where 12 carparking spaces were proposed to be located. The carparking spaces were
determined to remove valuable loading and unloading areas associated with maintenance
operations and as a result, the alternative solution of utilising the adjoining site was proposed.
Attachment A includes proposed plans of the location of the proposed carpark and alterations to
the existing carparking layout.

The applicant advises that the adjoining Lot 2 will eventually be developed for accommodation
purposes associated with the Carramar facility.

An application for Operational Works (carparking, access, stormwater drainage, erosion control) for
the proposed carpark is also included as part of this application. Attachment B includes plans
prepared by Callaghan and Toth.




             martoo consulting
             town planners + urban designers + development managers                      page 10 of 15
Log in to download the original file

Planning Report - Other changes and OPW.pdf · 984 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.