Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

RFI - Attachment F - Engineering Report

of 118

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Figure 1: Sediment removal by the Gullypit Containing an Enviropod Filter with a 200 micron mesh
                                       (Tonkin & Taylor)

Project Methodology
The Blackbutt Creek catchment was separated into three different reticulated sub-
catchments. Each sub-catchment was characterised by the different types of land use and
geographic characteristics within the catchment. Different land uses and geographic
characteristics (in this case catchment grade) produce contaminants at different rates

It was proposed to clean all Enviropods in the catchment together, on approximately 2-
month cycles, however at the time of monitoring this was increased due to the high
loading of many of the Enviropods. Not all Enviropods were cleaned during each event
due to access problems associated with cars parked on pits and other obstructions.

As part of the cleaning, 5 samples were taken from the retained material from each sub-
catchment on every alternative clean i.e. 15 samples were collected from the Blackbutt
catchment. The 5 samples from each sub-catchment were combined in a composite
sample and sent to a NATA approved laboratory for grain size distribution. The grain
size distribution was conducted to examine the type of material collected in the
Enviropod filter and define the suspended solid load such that it is consistent with the
CRC catchment hydrology definitions of Suspended solids and the definitions for the
CRC “Music” modelling programme. The “Music” modelling package has assumed that



                                               7
Log in to download the original file

RFI - Attachment F - Engineering Report.pdf · 15.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.