Original source · versioned page text
RFI - Attachment F - Engineering Report
Very large file: it may take a few minutes
The original of this document is very large (15.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
15 May 2019 (7 1O M consulting Issue - Impacts on the receiving environment Specific Outcome O6 of the Water Sensitive Design Code requires that within the Shire Business Centre site, as shown on Map SBC of the Noosa Plan, on-site detention measures are contained within the developable areas of the site, clear of drainage lines and Open Space Precincts. Information Required 32. Demonstrate that on-site detention measures are wholly contained within the developable areas of the site, clear of drainage lines and Open Space Precincts. Response 33 the onsite detention measures are wholly contained within the developable areas of the site as per the concept plans and Stormwater Management Plan. Should you require any further information do not hesitate to contact the undersigned. Yours faithfully Lachlan Stephenson For and on behalf of MPN CONSULTING PTY LTD IIs:dh Excellence with Economy in Engineering 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.