Original source · versioned page text
RFI - Attachment F - Engineering Report
Very large file: it may take a few minutes
The original of this document is very large (15.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Evaluation of Gully Pit Inlet Litter Control
Systems
Final Report
PROJECT NUMBER: 23 68261
Prepared for Brisbane City Council
GPO BOX 1432
BRISBANE QLD 4001
Att.: Mr. M Steer
Prepared by Mr. Michael White
Mr. David Pezzaniti
Urban Water Resources Centre
University of South Australia
MAWSON LAKES SA 5095
Telephone +618 8302.3652
Facsimile +618 8302.3386
Date of issue 10 April 2002
Distribution Client (2)
Urban Water Resources Centre
Authors (1)
Important Notice
This report applies only to the subject of the project. University does not accept
ISO 9001 responsibility for the conformity or non-conformity of any other subject to the findings
QEC6382 of this report.
This report is confidential and was prepared exclusively for the client named above. It is
not intended for, nor do we accept any responsibility for its use by any third party.
This report consists of one cover page, twenty pages of text and seven pages of
appendices. It may be reproduced only with permission of the copyright owner, and
only in full.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.