Evaluation of Gully Pit Inlet Litter Control Systems– Brisbane City Council and Gold Coast City Council
2. TEST SPECIFICATION AND PROCEDURE
Test specification:
• Approach flows ranging from 0 – 320 L/sec.
• Channel longitudinal slopes:
- 1%, 4% and 12% (3 off)
- “Sag” 0% slope for all configurations.
• Road pavement modelled to simulate asphaltic construction (hot-mix)
seal (Manning’s “n” = 0.014).
• Crossfall slope of 3.3%.
• Kerb type: Roll-top type kerb-and-channel currently set-up on Road
Rig.
• Lintel: Small (S) as per Gold Coast City Council (Drawing 59301).
• BCC perpendicular support bar grate
Procedure:
The test procedure involved:
(i) Add the pollution (10L) to an approach flow of 25 L/sec.
(ii) Observe and record the amount of pollution retained.
(iii) Increase approach flow and record capture flow.
(iv) Observe and record amount of pollution retained.
These procedures were repeated several times during each test to assess
the effect of increasing flows on litter and hydraulic capture performance.
Urban Water Resources Centre 5 University of South Australia
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.