4. CONCLUSION
The main findings from the testing programme are:
• The reinforcing bar placed across the inlet had little effect on
hydraulic capture for on-grade tests. However for sag conditions and
at flows above 200 L/sec, the hydraulic capture capacity was reduced.
Depths at invert were up to 50mm greater for the case with no
pollution and up to 120mm greater with pollution. A build up of
pollution on the grate, restricted by the bar, caused ‘jetting’ of water
above the kerb.
• The crate basket was ineffective in retaining pollution above a flow
rate of 25 L/sec for on-grade testing. Nearly all (90%) of pollution
added to the gutter after the basket had become blocked bypassed the
basket. After an approach flow of 320 L/sec only 2% of pollution
was retained for all longitudinal slopes. The basket was more
effective in retaining pollution under sag conditions.
• The mesh pit insert was inefficient in retaining pollution above a flow
rate of 25 L/sec. Only 5% of the pollution was retained at an
approach flow of 25 L/sec for the 1% and 4% longitudinal slope.
10% was retained for the 12% grade however all pollution had
bypassed the pit at an approach flow greater than 60 L/sec for all
slopes.
• The Enviropod basket was capable collecting and retaining large
amounts of pollution and had no significant effect on the hydraulic
performance of the gully pit. The basket retained up to 70% of
pollution added after an approach flow of 320 L/sec. At 12% grade,
litter was trapped in the overflow outlet, reducing the capture
capacity of the gully pit. This could also occur for flatter grades and
high approach flows. Initial testing of the basket led to some
modifications to increase support under high approach flows used in
the testing programme.
Urban Water Resources Centre 20 University of South Australia
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.