Council archive · source document
4 CrankSt_24056(SWM) - 21.03.2014 · MCU14/0006
Attached to the e-mail MCU14/0006 Information Response (various of emails).
Using these figures calculated peak runoff of volumes for a storm with an Average Recurrance Interval (ARI) of 100yrs are as follows:- Pre Development Qo = 41 It/s Post Development Q199 (undetained) = 42.2 Itls Peak Flow Increase = 1.2 Its Peak flow increases will be minor. The use of infiltration pits and water storage tanks will offset this increase in peak runoff volumes. 4.2.2. MANAGE ALLOTMENT AND CROSS ALLOTMENT FLOWS: From the existing surface contours, runoff from the site travels from the rear of the allotment towards Crank Street. A series of townhouses exists at the rear of the allotment. These drain along a driveway adjacent the common boundary towards Crank Street. This ensures no cross allotment flows occur for the allotment. 43 MANAGE WATER DEMAND: A 5000It tank is proposed which will serve WC'’s and External Hose Cocks for irrigation purposes only. The tank are to be fitted with a switchover device which provides mains water supply when the tank volumes dropped to pre-determined levels. 4.4 PROTECT AGAINST FLOODING: Noosa Shire Council's major flood overlay map confirms the allotment is not prone to flooding. 5.0 CONCLUSION: The measures proposed in this report demonstrate that the development can incorporate Water Sensitive Urban Design principles into it’s construction and on-going use. The development will contribute positively to the built environment that will contain it. For and on behalf of SCG CONSULTING ENGINEERS Attachment: Drawing (No.) 24056 — C4 SCG CONSULTING ENGINEERS 6 SCG Ref: 24056(SWM)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
4 CrankSt_24056(SWM) - 21.03.2014.pdfRelated documentApplication case desk ↗
About this file
- File size
- 756 KB (small file)
- File type
No other editions are linked here.