Our Ref: 20250996 SARA Ref: 2508-47877 SRA Council Ref: MCU25/0090 and OPW25/0136 16 October 2025 Department of State Development, Infrastructure and Planning - SEQ North PO Box 1129 Maroochydore BC QLD 4558 Via email: [email protected] Attention: Celeste Bownds Dear Celeste, INFORMATION RESPONSE - DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE (MULTIPLE DWELLING – 2x DWELLINGS, 11x SMALL DWELLINGS) AND OPERATIONAL WORKS – (ROAD WORK, DRAINAGE WORK, STORMWATER, EARTHWORKS, LANDSCAPING AND ACCESS) AT 15 AND 17 MYALL STREET, COOROY (LOTS 21 AND 22 C5605) Further to SARA’s Information Request issued 10 September 2025, we now respond in full to each of the items raised. In support of this response, please find enclosed: ● Revised Proposal Plans and Landscape OPW Plans prepared by Blackburne Jackson (submitted for completeness); ● Revised Traffic Engineering Response prepared by Hayes Traffic Engineering; ● Revised Engineering Plans prepared by Ingeniir. Please find below the response to each of the items raised by Council: Item 1 Submit a traffic impact assessment, certified by an RPEQ and prepared in accordance with the TMR Guide to Traffic Impact Assessment (GTIA) that assesses how vehicles can safely and efficiently: ● access the site from the north and ● exit the site and head south toward the highway without impacting the safety and efficiency of Myall Street. Response: Please refer to the revised Traffic Engineering Response prepared by Hayes Traffic Engineering. The response confirms that the sight visibility to the north is 55m and to the south is 148m, and is compliant with AS2890.1 for safe stopping sight distances.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Item 2
The power pole (P62170-A) located at the front of the premise is for the use of the subject
properties only. SARA considers the power pole, which is proposed to be located in the
access island to be a safety issue for vehicles. Therefore, SARA proposes to condition that
this pole be removed from this location. Removal of the power pole from the access area
would remove the hazard and need for a traffic island which requires pedestrians to divert
around a traffic island at the access. SARA advises the applicant so that alternative
arrangements for electricity can be considered.
Response: Please refer to the revised Engineering Plans prepared by Ingeniir. The existing power pole is
proposed to be relocated, and accordingly, the previously proposed traffic island within the driveway has
been removed.
We thank SARA on behalf of the applicant for assessing the attached additional application material.
Based on the information provided in this application we respectfully request that SARA proceed to issue
an approval.
Should you have any questions with respect to the above, please do not hesitate to contact the
undersigned.
Yours faithfully,
Adapt Development Management Pty Ltd
Liam Pinese Tiani Boulton
Managing Director Director