2020-09-14 GC Agenda - Item 7 - Attachment 1 - Noosa River Oyster Ecosystem Restoration Project Annual Report No. 1

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                          General Committee Agenda
                                                                                  14 September 2020
                                                                               Item 7 - Attachment 1




Noosa River Oyster Ecosystem
Restoration Project
Restoration of critically endangered oyster ecosystems in the Noosa River estuary

Annual Report No. 1

Reporting Period: July 2019 to August 2020




Figure 1. Mouth of the Noosa River estuary (© Marcos Barboza)


This project was made possible by The Nature Conservancy, Noosa Shire Council, The Thomas Foundation
      and Australian Marine Conservation Society. The project is located on Kabi Kabi Sea Country.




                                                                                                   1
Log in to download the original file

2020-09-14 GC Agenda - Item 7 - Attachment 1 - Noosa River Oyster Ecosystem Restoration Project Annual Report No. 1(PDF, 927KB).pdf · 949 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 26 sections

Section 2

Contents
Purpose and scope ................................................................................................................................................................ 3
Background ............................................................................................................................................................................ 3
Project overview ................................................................................................................................................................... 4
Project governance ............................................................................................................................................................... 5
Project resourcing ................................................................................................................................................................. 5
Conservation deliverables .................................................................................................................................................... 6
Work sequence ..................................................................................................................................................................... 6
Summary of Achievements to Date ..................................................................................................................................... 6
Total progress against agreed deliverables ......................................................................................................................... 8
Unforeseen issues arising and project adaptation ............................................................................................................ 17
Community consultations and engagement...................................................................................................................... 17
    Community meetings...................................................................................................................................................... 17
    Shuck Don’t Chuck – shell recycling project .................................................................................................................. 21
    Noosa oyster gardening .................................................................................................................................................. 21
Media ................................................................................................................................................................................... 21
Presentations....................................................................................................................................................................... 24
Project finances ................................................................................................................................................................... 25
Next steps ............................................................................................................................................................................ 27


      Version/Date                                                       Issued as                                                            Author                 Approved
           V1                                                    For TNC and NSC review                                                        TNC                  19.08.2020
           V2                                                           CD review                                                               CD                  26/08/2020
           V3                                                         For submission                                                           TNC                  31/08/2020




                                                                                                                                                                                          2

Section 3

Purpose and scope
The purpose of this report is to provide readers with insight as to the performance of the Noosa Oyster Ecosystem
Restoration Project (the “Project”). The governance arrangements for the Project are defined in the Alliance and
Funding Agreement between The Nature Conservancy and Noosa Shire Council, which was executed on the 25th July
2019. This report (Annual Report 1) pertains to the period 25th of July 2019 and 21st of August 2020.


Background
Over the last four years, Noosa Shire Council (NSC), The Nature Conservancy (TNC) and a range of stakeholders have
worked together to build a deeper understanding of the environmental significance and long-term sustainable
management options for the Noosa River. This has included:

Noosa River Expert Workshop, Powerhouse Museum, 2014
A two-day workshop, hosted by TNC on behalf of The Thomas Foundation and Noosa Parks Association, comprising
12 academic and NGO estuary scientists. The workshop identified 14 conservation activities that could lead to a
healthier Noosa River, with oyster reef restoration listed as a priority action in addition to prawn restocking and Kin
Kin sediment management. These activities (including further scoping studies) were later jointly funded by NSC, Noosa
Parks Association, The Thomas Foundation and the Noosa Biosphere Reserve Foundation.

TNC Oyster Restoration Scoping Study, 2015
TNC and Ecological Service Professionals Pty on behalf of NSC and others undertook a short, five month ecological
assessment to quantify oyster densities across 11 intertidal and subtidal sites within the estuary. The study confirmed
high densities of oyster recruitment particularly around Weyba Creek, the main channel around Tewantin, and in the
narrow channel between Goat Island and Noosa North Shore. The project recommended installing a number of pilot
reefs for further assessment.

University of Queensland Historical Ecology of the Noosa Estuary fisheries, 2015
Ruth Thurston from the University of Queensland undertook a historical ecology study on behalf of TNC and NSC in
the Noosa River estuary to develop an understanding of historical fisheries productivity, including oysters. The study
confirmed oyster reefs used to exist in the estuary and were commercial harvested in the early 1900s. Fish populations
were also significantly larger in the past than they are today.

University of Sunshine Coast, Bring Back the Fish, 2018-2020
A three-year study which installed a series of experimental ‘oyster habitat restoration units’ consisting of coir bags
filled with oyster shell at 14 sites across the estuary. The project studied the structural integrity of the units, oyster
recruitment, fish and invertebrate community assemblages and human interactions with the trail reefs. This project
collected important ecological information that will support the final design and implementation of reef restoration
in this Project.

NSC-TNC Partnership Agreement 2019
NSC and TNC, in addition to other organizations with an interest in the River’s sustainability (including Noosa Parks
Association, The Thomas Foundation and Noosa Biosphere Reserve Foundation), through a series of dialogue and
presentations to Noosa Shire Council, have recognized the strategic priorities of both organizations and of others
would be more effectively served through a formal partnership, rather than on an individual project basis. This led to
the development of this Project, and associated partnership agreement between NSC and TNC, and is the main
delivery mechanism of the TNC-NSC Partnership.

Draft Noosa River Plan, 2020
The completion of the Noosa River Plan by NSC will identify current and future threats and management interventions
to abate identified threats within the Noosa River estuary. The Plan will identify the strategic alignment of oyster reef



                                                                                                                        3

Section 4

restoration to the long-term health and resilience of the Noosa River estuary. The Noosa River Plan will support the
delivery of the Noosa Environment Strategy.

TNC Project Management Plan 2020
The TNC Project Management Plan including Communications Plan and Monitoring, Evaluation and Reporting (MER)
Plan were presented to Noosa Shire Council at its Ordinary Meeting, 16th July 2020.


Project overview
Past research projects demonstrated that the Noosa River estuary has sufficient oyster recruitment and survival, and
invertebrate colonization, at a number of locations to make the estuary a viable place to pursue an oyster ecosystem
restoration project at scale.

The primary goal of the Project is to restore functionally extinct oyster-dominated ecosystems (beds and reefs) and
other associated oyster species, in the Noosa River estuary. These ecosystems benefit nature and people.

Historically, oyster ecosystems were prolific throughout the Noosa River estuary. They were created predominantly
by rock oysters (such as Saccostrea glomerata), which, in association with other oyster species, formed three-
dimensional ‘natural infrastructures’ in the river, either forming ‘beds’ of low relief or ‘reefs’ of high relief. Oyster
ecosystems provide valuable fish habitat and substantial ecological services to coastal ecosystems (Peterson et al
2003; Beck et al 2011; Grabowski et al 2012). Oysters are ecosystem engineer species capable of improve ecosystem
function and providing habitat for other organisms (Grabowski et al 2012).

Oyster ecosystems thus added extensive ‘natural infrastructure’ to the estuary and provided the estuary with a
range of environmental functions. These included providing complex habitats for marine species (the diverse
habitats typically consist of fish, invertebrates, corals, ascidians, lace corals, encrusting sponges and algae); filtering
water and removing suspended sediment and pollution; processing nutrients; providing bank stabilization and
protection; and, providing complex vertical and horizontal living spaces, and feeding grounds, for a multitude of
intertidal and marine creatures, which are today important for marine and coastal lifestyle and tourism activities
such as fishing, diving and bird watching.

The recognition of the significant contribution of oyster ecosystems led to their recognition as an important wetland
habitat type in the Convention on Wetlands of International Importance (The Ramsar Convention – habitat type
‘Ga’) (Kasoar et al. 2015).

Key related references include:

Kasoar T, zu Ermgassen PS, Carranza A, Hancock B, & Spalding M. 2015. New opportunities for conservation of a
threatened biogenic habitat: a worldwide assessment of knowledge on bivalve-reef representation in marine and
coastal Ramsar Sites. Marine and Freshwater Research. http://dx.doi.org/10.1071/MF14306

Peterson CH, Grabowski JH, & Powers SP. 2003. Estimated enhancement of fish production resulting from restoring
oyster reef habitat: quantitative valuation. Marine Ecology Progress Series 264, 249–264. doi:10.3354/MEPS264249

Grabowski JH, Brumbaugh RD, Conrad RF, Keeler AG, Opaluch JJ, Peterson CH, Piehler MF, Powers SP, & Smyth AR.
2012. Economic valuation of ecosystem services provided by oyster reefs. Bioscience 62, 900–909.
doi:10.1525/BIO.2012.62.10.10




                                                                                                                              4

Section 5

Beck MW, Brumbaugh RD, Airoldi L, Carranza A, Coen LD, Crawford C, Defeo O, Edgar GJ, Hancock B, Kay MC, Lenihan
HS, Luckenbach MW, Toropova CL, Zhang G, & Guo X. 2011. Oyster reefs at risk and recommendations for conservation,
restoration, and management. Bioscience 61, 107–116. doi:10.1525/BIO.2011.61.2.5


Project governance
The Project is framed by a formal partnership agreement between TNC and NSC. This partnership is specified in the
Alliance and Funding Agreement, which came into effect on 25th July 2019. The agreement is effective for three years
and two months and the project is scheduled to be completed by 30th September 2022. The terms of the partnership
will be reviewed prior to July 2022.

The Project is overseen by an executive level forum comprising two key Contact Officers, those being the Director of
Oceans (TNC) and Director of Environment & Sustainable Development (NSC). The governance of the activities for
the project are the responsibility of the Executives of TNC and NSC, or their nominated delegate/s and day-to-day
operations the responsibility of TNC and its appointed Project Manager for that purpose.

The Project Manager is supported by the Noosa Technical Advisory Group (TAG), formed for the Project. The TAG’s
purpose is to:

•   Support detailed project planning for the Noosa Oyster Reef Restoration Project that will see reefs re-established
    in the Noosa River estuary by June 2022.
•   Provide ongoing expert advice on the implementation of the Project Plan, and support in overcoming legislative,
    scientific and practical barriers that occur during the term of the project.
•   Ensure that the Project meets all technical, statutory and policy requirements in a timely manner to the
    satisfaction of relevant decision-making authorities.
•   Ensure actions within the Project Plan are effectively delivered and communicated to all stakeholders.

The composition of the Noosa TAG is:

•   The Nature Conservancy – Oceans Operations Manager + Oceans Restoration Scientist
•   Noosa Shire Council – Environmental Services Manager
•   Department of Environment & Science - Water quality and aquatic ecosystems expertise
•   Department of Agriculture & Fisheries - Fisheries, permits and biosecurity expertise
•   Maritime Safety Queensland - Regional Manager and Noosa local officer (on occasion)
•   Kabi Kabi Traditional Owner – For technical expertise
•   Independent aquatic ecologist/biologist – With in depth ecological knowledge of the Noosa River estuary

The Noosa TAG held its inaugural meeting on the 15th May 2020. The second TAG meeting was held on the 20th August
2020. TAG meetings are held on a semi-regular basis, as required to drive the project forward. Specific matters are
often addressed out of session. Minutes from TAG meetings are produced and made available on request.


Project resourcing
The total operating budget for the project is $2.4M, inclusive of $1.2M from The Nature Conservancy (TNC), which
includes $200,000 from the Australian Marine Conservation Society (AMCS), and $1.2M from NSC. There is an
expectation that TNC will raise further funding, from a variety of other sources, to support further delivery of the
restoration component of the project.




                                                                                                                    5

Section 6

Conservation deliverables
The Project principally delivers the following:
    1. Restoration of Noosa’s oyster ecosystems at practical and agreed locations;
    2. Engagement of the Noosa community and local businesses in meaningful volunteering and marine education
         opportunities;
    3. Exploration of the potential to restore seagrass habitats in Lake Cooroibah (and potentially elsewhere) to
         reduce sediment resuspension and increase invertebrate and fish biomass in the estuary (to be delivered as
         part of Objective two and five); and,
    4. Provision of technical advice to Noosa Shire Council (NSC) in identifying opportunities for sustainable
         commercial and recreational fisheries in the Noosa River.


Work sequence
The Project comprises three work stages, to reduce ecological and financial risks through the application of an
adaptive management framework whereby learnings from previous phases are included in future stages to consider
prior learning and minimize risk:

1. Optimal design and siting (2020) which includes pre-planning to determine the optimal design, locations and most
cost effective method of reef restoration;

2. First site implementation (2020-2021) which seeks to restore oyster beds at two pilot sites; and,

3. Full restoration (2021-2022) where additional oyster beds are restored at additional sites.


Summary of Achievements to Date
Considerable progress has been made in the first year of the partnership. Despite delays with the appointment of a
dedicated project manager and numerous challenges imposed by COVID-19 restrictions (as well as impacts on
individuals, families and businesses), the project has still managed to achieve the following key results in its first year
of operation.

    •    Appointment of a Project Manager for the project, Craig Bohm, who commenced work on the 29th of January
         2020, and is based in Noosa.
    •    Developed the Project Management Plan (also called ‘Implementation Plan’).
    •    Developed the Noosa Risk Assessment, Communications Plan and Monitoring, Evaluation and Reporting
         (MER) Plan.
    •    Secured endorsement of the Project Management Plan, and associated plans, from the newly elected Noosa
         Council.
    •    Completed preliminary field assessments (baseline surveys) of potential restoration sites in the Noosa River
         estuary.
    •    Completed extensive data reviews and developed the Noosa Habitat Suitability Model and Noosa Restoration
         Suitability Model;
    •    Completed site visits and preliminary assessment for the Noosa ‘Shuck Don’t Chuck’ oyster shell recycling
         project.
    •    Established Shuck Don’t Chuck program with new project partners Mooloolaba River Fisheries (MRF) and
         Resource Recover Australia (RRA).
    •    Provided input to, as well as three expert reviews of the draft Noosa River Plan.
    •    Facilitated two media statements and secured positive media profiling in the local press (see: Media section).




                                                                                                                         6

Section 7

•   Facilitated a major scientific literature review and publication of results regarding the history of oyster reefs
    in South East Queensland.
•   Completed two Enviroforum seminars (Dr Chris Gillies, Dr Hugh Possingham) for Noosa Parks Association
    members and guests. Dr Chris Gillies also presented to the community at the Noosa Shire Council.
•   Contracted Ecological Service Professionals (ESP) to map all seagrass beds in the Noosa River estuary as well
    as to develop detailed habitat maps for potential oyster ecosystem restoration sites.
•   Held two ‘meetings of the Noosa Technical Advisory Group (TAG).
•   Identified key (initial) community partners.
•   Held consultation meetings with more than 67 key stakeholders and strengthened relationships with each of
    these wherever possible.
•   Provided communications content to Tourism Noosa.
•   Commenced scoping of the Noosa oyster gardening project, which will be a major community engagement
    vehicle.




                                                                                                                   7

Section 8

Total progress against agreed deliverables
Table 1 presents the total progress of the project against the deliverables as outlined in the Alliance and Funding
Agreement Schedule 1.

Table 1: Total progress of the project against the deliverables

 Deliverables                   Measurable          Timeframe     Progress         Total progress to date and notes
                                outcomes
 (A1.1) A Technical Advisory    1 Technical         30 April      Achieved         Terms of Reference (ToR) for the
 Group (TAG) is established     Advisory Group      2020                           TAG finalised
 to provide project             with TOR
 oversight. This will include   established                                        200821 Noosa TAG ToR revised
 a clear terms of reference
 (ToR) and consist of                                                              Inaugural meeting held 13 May
 representatives from key                                                          2020.
 stakeholders (NSC, TNC,
 Kabi Kabi and at least two                                                        200601 TNC Noosa TAG Meeting
 other independent                                                                 1 - Minutes Final
 parties).
                                                                                   Second meeting held 20 August
                                                                                   2020.

                                                                                   200830 TNC Noosa TAG Meeting
                                                                                   2 - Minutes Final

                                                                                   Key representation from the Kabi
                                                                                   Kabi Nation have been invited to
                                                                                   participate in the TAG meetings
                                                                                   and have expressed a keen
                                                                                   interest. To date, they have been
                                                                                   unavailable to participate
                                                                                   directly in the meetings but will
                                                                                   be engaged by appropriate
                                                                                   means.

 (A1.2) Appointment of          1 Project           31 January    Achieved         Craig Bohm appointed by TNC as
 dedicated project manager      Manager             2020                           Marine Coordinator for South
 who is a marine biologist      appointed                                          East Queensland, based in
 with extensive project                                                            Noosa. Position commenced 29
 management experience,                                                            January 2020.
 for the term of the
 Agreement.
 (A1.3) A Project               1 Project           31            Achieved         The project implementation plan
 Implementation Plan            Implementation      December                       was endorsed by Noosa Shire
 detailing at a minimum:        Plan completed      2019                           Council as the ‘Project
 A detailed risk assessment     and endorsed by                                    Management Plan’ at its
 associated with the            Noosa Council                                      Ordinary Meeting held 16 July
 project.                                                                          2020.
 A communications and                                             Achieved
 media plan, outlining



                                                                                                                       8

Section 9

media protocols,              1 Detailed Risk                        200802 Noosa Project
opportunities and the role    Assessment                             Management Plan_V11
of TNC and NSC.               included                               Endorsed
A monitoring, evaluation                                  Achieved
and reporting plan which      1
identified ecological and     Communications
social monitoring             and Media Plan
programs, how they will       completed                   Achieved
be reported on and how
this will fed back into the   1 Monitoring,
project.                      Evaluation and
                              Reporting Plan
                              completed
(A1.4) Participation and      3 community       30 June   On track   Project manager and team have
delivery of public            engagement        2022                 met with more than 67
education and                 forums                                 stakeholder groups to talk with
engagement forums and         facilitated                            them about the project and to
media statements                                                     secure their in principle support.
                              3 media                     On track
                              statements                             See: “Stakeholder Engagement”
                              released                               section of this report.

                                                                     2 Noosa Enviroforum seminars
                                                                     held in November 2019 with TNC
                                                                     Chief Scientist, Pr. Hugh
                                                                     Possingham and Dr Chris Gillies.

                                                                     1 media statement:

                                                                     200301 - The surprising history
                                                                     of Queensland’s oyster reefs
                                                                     revealed

                                                                     The statement details Aboriginal
                                                                     use (inc. Kabi Kabi) and historical
                                                                     harvest of oysters in SE
                                                                     Queensland was published in
                                                                     February 2020.

                                                                     2 project-related publications:

                                                                     2020 Thurston et al - Charting
                                                                     Two Centuries of Transformation
                                                                     in a Coastal Social-ecological
                                                                     System - A Mixed Methods
                                                                     Approach - SE Queensland

                                                                     2020 Gillies et al - Conservation
                                                                     Status of Oyster Reef Ecosystem
                                                                     of Southern and Eastern




                                                                                                           9

Section 10

                                                                         Australia - Global Ecology and
                                                                         Conservation

                                                                         1 TNC-orchestrated interview
                                                                         between the project manager
                                                                         and Noosa Today

                                                                         1 positive media story in Noosa
                                                                         Today:

                                                                         200708 Noosa Today - Oysters
                                                                         for the river not the menu

                                                                         Additional:
                                                                         In response to COVID-19, and in
                                                                         compliance with TNC and
                                                                         government COVID-19
                                                                         restrictions, community
                                                                         engagement actions beyond the
                                                                         above have been principally via
                                                                         extensive stakeholder meetings
                                                                         and phone calls between the
                                                                         Project Manager and key
                                                                         stakeholders. These are reported
                                                                         under the ‘Stakeholder
                                                                         Engagement’ section.

                                                                         The project team is currently
                                                                         refining the Communications
                                                                         Plan to adapt to the ongoing
                                                                         COVID-19 situation and to
                                                                         provide more creative avenues
                                                                         of informing the community
                                                                         about the project.

                                                                         The project has been invited to
                                                                         several community forums, but
                                                                         these have been delayed due to
                                                                         COVID-19 restrictions, as groups
                                                                         seek to adapt alternative
                                                                         engagement models.

                                                                         Community participation is being
                                                                         designed as part of the project
                                                                         monitoring, oyster gardening
                                                                         and Shuck Don’t Chuck programs.
(A1.5) Annual project         3 six monthly      First        Achieved   The first six monthly report was
reports and final report      status updates     Report: 31              submitted to the Noosa TAG for
each of which address, at a   submitted     to   January                 review and then to TNC and
minimum:                      Noosa Council      2020                    Noosa Council.




                                                                                                           10

Section 11

Activities undertaken
during the subject                                                         200601 TNC Noosa TAG Meeting
financial year, status and                                                 1 - Minutes Final
progress against
deliverables, budget             3 annual reports    For each   On track   This report is the first annual
progress, income and             submitted     to    annual                report to be submitted.
expenditure, report              Noosa Council       report -
against monitoring and                               yearly
evaluation program and
measurable outcomes and
outline of proposed
upcoming works/activities
for future period.

(A2.1) Oyster reef               1 Habitat           30 June    Achieved   1 restoration suitability model
restoration suitability          suitability model   2020                  developed as well as associated
model incorporating              developed which                           habitat suitability model and
physical parameters of           incorporates                              socio-economic suitability
oysters and public and           industry, Kabi                            models.
industry usage, access etc.      Kabi and public
to identify priority sites for   interests                                 200820 Noosa Restoration
restoration.                                                               Suitability Model Report

                                                                           1 associated presentation
                                                                           developed

                                                                           200820 Noosa Restoration
                                                                           Suitability Model Presentation

                                                                           1 restoration suitability model,
                                                                           which includes socio-economic
                                                                           information from river
                                                                           stakeholders, has also been
                                                                           developed and presented to the
                                                                           Noosa TAG.

(A2.2) Obtain necessary          1 set of ‘all’      31         On track   The project team is preparing a
State Government                 relevant state      December              highly developed set of
permits/authorities              permits for         2020                  documents to support the
including particular             oyster reef                               permitting process. This
resource allocation              restoration in                            approach should help assure the
authority, for oyster reef       the Noosa River                           relatively efficient progression of
restoration                      secured                                   the permit applications through
                                                                           the governance systems of both
                                 1 set of ‘all’                            Noosa Council and the
                                 relevant local                            Queensland government.
                                 government
                                 permits for                               Permit applications will be
                                 oyster reef                               supported by detailed ecological
                                 restoration in                            mapping and engineering




                                                                                                              11

Section 12

                              the Noosa River                          certifications for the restoration
                              secured                                  design, restoration substrate
                                                                       configuration on-site, and
                                                                       signage and biosecurity
                                                                       management plan for live oyster
                                                                       and shell recycling, transport,
                                                                       handling and deployment.
(A2.3) Community,             1 set of           31         On track   The project has met with more
industry and stakeholder      engagement         December              than 67 key stakeholders to date.
consultation sufficient to    records provided   2020                  Most meetings have occurred
gain majority support for     to Noosa Council                         since February 2020 when the
reef restoration locations.   of public and                            project manager was appointed.
                              stakeholder                              See “Stakeholder Engagement”
                              consultations,                           section of this report for details.
                              including one-
                                                                       A COVID-19 compliant public
                              on-one
                                                                       consultation process for the
                              meetings, open                           project is currently being
                              forums, media,                           designed, in consultation with
                              etc.                                     Noosa Council staff, to seek
                                                                       formal endorsement for the
                              1 written permit                         preferred restoration sites.
                              secured from
                              Noosa Council                            All stakeholders met with so far
                              formally                                 have expressed verbal support
                              allowing the                             for the preferred restoration
                              project to                               sites.
                              construct reefs.
(A3.1) Community,             1 consultation     31         On track   Discussions with restaurants re:
industry and stakeholder      completed          December              Shuck Don’t Chuck shell recycling
consultation to identify                         2020                  project commenced in
most appropriate              1 + volunteering                         November 2019.
community volunteering        opportunities
opportunities (e.g. shell     identified                               Groups with an interest in
recycling, oyster gardens,                                             supporting restoration
oyster watch, video                                                    monitoring, oyster gardening
monitoring).                                                           and shell recycling projects have
                                                                       been identified.

                                                                       Monitoring, shell recycling and
                                                                       oyster gardening systems are
                                                                       currently being refined.

                                                                       Volunteering will be constrained
                                                                       by COVID-19 restrictions on
                                                                       movement and contact, but the
                                                                       project will adaptively manage
                                                                       against these to ensure
                                                                       meaningful engagement occurs.




                                                                                                          12

Section 13

(A3.2) Establish at least    1 + volunteering          31         On track   The project has identified Oyster
one community                program defined           December              Gardening as the first
volunteering program         and                       2020                  volunteering program. TNC is
identified from the above    implemented                                     currently scoping this project
process which takes into                                                     and discussing its possible
account current and future   Record of volunteer                             configurations with local groups.
                             hours dedicated to
resources, management                                                        The general public will also have
                             community
and interest.                volunteering                                    access to the program, which will
                             programs, such as:                              commence in 2021, as the
                             shell recycling, oyster                         project is subject to permits
                             gardens, oyster
                                                                             being secured.
                             watch, video
                             monitoring.
                                                                             There will also be some scope for
                                                                             volunteer in other aspects of the
                                                                             project, which are also being
                                                                             discussed with local groups.

(A4.1) Restoration at two    1 approval from           30 June    On track   Detailed site assessments and
sites (approx. 40m-50m       Noosa Council             2021                  substrate design work is in
shore length per site)       secured to                                      progress. Documents to support
which test reef design and   restore 2+ trial                                applications for relevant permits
construction and oyster      restoration sites                               are being prepared.
growth and survival.         in the Noosa
                             River estuary

                             2+ sites
                             recovered with
                             at least overall
                             80 m shore
                             length of reef
                             constructed

(A4.2) Restoration across    1 approval from           30 June    On track   The project plans to secure
multiple further sites, as   Noosa Council             2021                  approvals for all restoration sites
determined by habitat        secured to                                      and works from the community,
suitability modelling and    restore an                                      NSC and the QLD Government
outcomes of community        additional 2+                                   prior to commencement of any
consultation.                sites as agreed                                 works.
                             to by
                             stakeholders, in
                             the Noosa River
                             estuary

                             2+ additional
                             sites recovered
                             with at least an
                             overall
                             additional
                             600m2 surface
                             area of




                                                                                                               13

Section 14

                             established
                             oyster reef,
                             constructed in
                             the Noosa River
                             estuary.
(A4.3) Monitoring and        1 related reef    As         On track   The Monitoring, Evaluation and
evaluation study for both    monitoring        required              Reporting (MER) Plan is in place
pilot and full restoration   program                                 and is being refined, as more
sites. Monitoring to         established                             specific methodologies are being
include oyster metrics,                                              refined, and in line with
invertebrates and fish use                                           recommendations made by the
(detailed in MER plan).                                              independent review of the plan.

                                                                     See:
                                                                     200802 TNC&NSC Noosa Project
                                                                     Management Plan Final –
                                                                     endorsed by Noosa Council

                                                                     The MER plan is currently being
                                                                     operationalised and baselines
                             2 six monthly                On track   established prior to the first
                             status reports                          deployment of restoration
                             submitted                               substrate into the estuary,
                                                                     forecast for 2021.

                                                                     The first six monthly report was
                             2 annual                     On track   completed in May 2020.
                             monitoring and
                             evaluation                              200527 TNC&NSC Noosa Oyster
                             report cards                            Project 6 Monthly Report 1
                             produced and
                             published                               The first of these will be released
                                                                     annually after the deployment of
                                                                     substrate at the first two trial
                                                                     restoration sites in 2021.
(A5.1) Run workshop with     1 workshop        31 March   Achieved   2019 workshop held between
Noosa Council to identify    facilitated       2020                  TNC and NSC and discussions
ongoing focus areas for                                              resulted in the development of
TNC support.                                                         the Alliance and Funding
                                                                     Agreement.

                                                                     TNC and NSC communicate
                                                                     weekly on areas of mutual
                                                                     interest and support.
*(A5.2) Provide              5 + peer review   30 June    On Track   When requested
technical/peer review on     reports           2022
minimum five                 submitted to
plans/reports/studies if     Noosa Council
requested by Noosa           during the
Council.                     three-year term




                                                                                                        14

Section 15

                               of this
                               Agreement, if
                               requested by
                               Noosa Council.

                               If Noosa Council
                               requests a peer
                               review, TNC will
                               provide a minimum
                               of 3 experts who are
                               qualified in the
                               relevant area of
                               expertise for Noosa
                               Council consideration
                               and Noosa Council’s
                               acceptance of 1
                               expert for the peer
                               review.
*(A5.3) Facilitate a           3 + study tours         30 June   On hold    Study tour 1 was in planning for
minimum of three study         facilitated during      2022                 2020 but has been placed on
tours of relevant sites in     the three-year                               hold due to COVID-19 travel
line with objectives and       term of this                                 restrictions.
scope of the program in        Agreement, if
Australia/US if requested      requested by                                 The study tour schedule will be
by Noosa Council (flights      Noosa Council.                               revisited by TNC and NSC once
and incidentals covered                                                     COVID-19 travel restrictions have
separately by Noosa                                                         been eased or lifted.
Council, accommodation
and in country travel
covered by this Grant).
*(A5.4) Review and             1 Conservation          30 June   On track   Detail to be agreed between
feasibility of opportunities   Action Plan             2022                 parties
for sustainable commercial     developed, as
and recreational fishing       required
management options for
the Noosa River.               1 set of
                               Community
                               Workshops
                               facilitated, as
                               required.
*(A5.5) Facilitate access to   1+ new formal           30 June   On track   When requested
TNC conservation               networking              2022
networks and researchers       connections
if requested by Noosa          facilitated to
Council.                       assist Noosa
                               Council with
                               ongoing and
                               future marine
                               conservation
                               activities*




                                                                                                               15

Section 16

                               * As and if
                               requested by
                               Noosa Council
(A5.6) Promote Noosa           1+ presentations    30 June   When able   All relevant conferences are
Council’s Noosa River Plan     given at national   2022                  currently suspended or cancelled
and shellfish restoration      conference/s                              due to COVID-19.
project in at least one        over 3 years
national and one                                                         The Noosa River Plan will be
international conference.      1+ presentations                          promoted once finalised.
                               given at
                               international
                               conference/s
                               over 3 years

(A5.7) Promote Noosa           1+ New              30 June   On track    TNC forged a new relationship
Council’s Noosa River Plan     corporate/          2022                  with the Department of
and shellfish restoration      government/                               Environment and Science (DES),
project to corporate,          philanthropic                             who has expressed support for
philanthropic and              alliances formed                          the Noosa oyster project.
state/federal government
audiences to establish         1+ New in-kind                            TNC sits on the Department of
further support for            support/financial                         Environment and Science (DES)
conservation activities that   funding                                   Oyster Reef Restoration and
support the Noosa River        contributions                             Adaptation Working Group,
Plan                           secured                                   which aims to advise a new
                                                                         policy framework for oyster
                                                                         restoration.

                                                                         TNC formed a new relationship
                                                                         with the Department of
                                                                         Agriculture and Fisheries for the
                                                                         purpose of progressing the
                                                                         Noosa project.

                                                                         TNC is formally discussing
                                                                         funding proposals with the
                                                                         Australian Government and
                                                                         Queensland Government to
                                                                         support oyster restoration work
                                                                         in Noosa and South East
                                                                         Queensland more broadly.

(A5.8) Assess feasibility of   1 Habitat           30 June   On track    TNC has contracted Ecological
seagrass restoration in        mapping report,     2022                  Service Professionals Pty Ltd to
Lake Cooroibah as a            habitat                                   develop a map of seagrass beds
method of reducing             suitability                               in the Noosa River estuary
sediment resuspension          model, PhD                                including in Lake Cooroibah.
and increasing                 study or similar
invertebrate biodiversity      output                                    TNC is discussing seagrass
                               completed and                             restoration research options




                                                                                                             16

Section 17

                               presented to                                       with Central Queensland
                               Noosa Council                                      University.


Unforeseen issues arising and project adaptation
The delayed appointment of the project manager, along with a legacy of confusion in the community about the nature
of the project, its purpose, relationship with the previous project (led by the Noosa Biosphere Reserve Foundation
and University of the Sunshine Coast) and role in broader river issues, has meant considerable effort has had to be
placed on community consultation meetings with numerous key stakeholders, rather than on progressing the
refinements to the restoration design, engineering technical support, ecological assessments and shell recycling.

The project manager has invested heavily in stakeholder meetings (see ‘Stakeholder’ section) and building stakeholder
relationships. While this work is far from complete, considerable progress has been made. Focus on these meetings
will continue but work on the operational aspects of the project will also receive attention.

The project, project team and Noosa stakeholders have all been affected by COVID-19. Noosa has lost businesses,
families have had to leave the region, and long-trusted systems of engagement and participation have been dissolved.
We have all had to adapt to new ways of operating, of working together, of achieving progress. This has taken time,
and much effort, as we all learn about ‘Zoom’, ‘Microsoft Teams’ and the art of working from home.

The Noosa oyster project has been particularly challenged in terms of community engagement. Personal contact has
been constrained, prevented or limited. Group meetings and event planning have been stifled, and many locals made
less available due to COVID-19 adaptation overload, reprioritisation of efforts, the fear of contamination and the
pressure of home office and/or home schooling. However, the project has adapted to these changes and remains on
track.

The mechanisms for community consultation have changed to primarily to ‘one on one’, or small group meetings. This
is a highly effective consultation method, but is very time consuming. Progressing the restaurant component of ‘Shuck
don’t Chuck’ oyster recycling was delayed due to the COVID-19. This component will soon be reinvigorated. A shell
recycling system with wholesalers has progressed and is in place. Community forums and presentations will now be
primarily held ‘online’, rather than in face-to-face gatherings.


Community consultations and engagement

Community meetings
The project manager, working closely with council staff, has met with more than 67 key stakeholders and community
representatives (see Table 2 below). Most of these meetings have occurred since February 2020. The list does not
include individual households met (for reasons of privacy), some political meetings held at a state level and with
research institutions, or internal meetings with TNC or Noosa Council staff.

The project manager met with some organisations on multiple occasions. While more meetings are needed, and a
formal community consultation process regarding the selection of the restoration sites warranted, the overwhelming
feedback received so far is positive and supportive. Once the project has been clearly explained, and contextualized,
many groups have offered help and provide resources or public communication channels to share key messages and
stories about the project.




                                                                                                                  17

Section 18

Table 2: List of stakeholders met with to date

 #        Organisation                           Position                                 Organisation Type
 1        Biotechnology Aquaculture Pty Ltd      Manager                                  Commercial

 2        Boral - Moy Pocket                     Accounts Manager                         Commercial

 3        Cafe Le Monde                          Executive Chef                           Commercial

 4        Central Queensland University          Interim Director: Coastal Marine         Science Community
                                                 Ecosystems Research Centre
 5        Cleanaway                              Site Manager                             Commercial

 6        Department Agriculture and Fisheries   Fisheries Officer                        TAG
 7        Department Agriculture and Fisheries   Principal Scientist (Aquatics)           TAG
                                                 WSD Management and Bait Awareness
                                                 Program, Biosecurity Queensland
 8        Department Agriculture and Fisheries   Fisheries Officer                        TAG

 9        Department of Agriculture and          Principal Policy Officer, Fisheries      State Agency
          Fisheries                              Queensland

 10       Department of Agriculture and          Deputy Director-General, Fisheries and   State Agency
          Fisheries                              Forestry
 11       Department of Agriculture and          Fisheries Officer                        State Agency
          Fisheries
 12       Department of Agriculture and          Principal Scientist (Aquatics)           State Agency
          Fisheries                              WSD Management and Bait Awareness
                                                 Program, Biosecurity Queensland
 13       Department of Environment and          Principal Environment Officer, Aquatic   TAG
          Science                                Ecosystem Health& Environmental
                                                 Monitoring and Assessment Science

 14       Department of Environment and          Principal Environment Officer            State Agency
          Science
 15       Department of Environment and          Acting Manager - Utilities and           State Agency
          Science                                Government Organisations Assessment,
                                                 Waste, Development & Southeast
                                                 Compliance, Environmental Services and
                                                 Regulation
 16       DigsFish Services Pty Ltd              Director, Digsfish Services              Science Community

 17       Ecological Service Professionals Pty   Principal Ecologist (Director)           TAG
          Ltd
 18       Fisheries NSW                          Manager Marine Estate Oyster Reef        State Agency
                                                 Rehab



                                                                                                              18

Section 19

19   Department of Agriculture and            Fisheries Biologist, Impact Assessment   State Agency
     Fisheries                                and Management

20   Fresh Advisory                           Consultant                               Commercial

21   Groundworks Plus                         Senior Environmental Engineer            Contractor

22   Healthy Land and Water                   Strategic Partnerships Manager           Non Govt
                                                                                       Organisation
23   Healthy Land and Water                   Scientific advisor                       Non Govt
                                                                                       Organisation
24   International Coastal Management         Principal Coastal Engineer               Contractor


25   James Cook University                    Assistant Director - TropWATER           Science Community
                                              Principal Research Scientist

26   Kabi Kabi Nation                         Technical advisor                        Indigenous

27   Maritime Safety Queensland               Area Manager | Marine Operations –       TAG
                                              North Brisbane/Sunshine Coast
28   Massoud fisher family                    Owner operator                           Commercial

29   Mooloolaba River Fisheries               Retail Manager                           Commercial

30   Noosa and District Landcare              Committee Member                         Non Govt
                                                                                       Organisation
31   Noosa Biosphere Reserve Foundation       President                                Non Govt
                                                                                       Organisation
32   Noosa      Community         Biosphere   Chair                                    Noosa Community
     Association
33   Noosa Environmental Education Hub        Director                                 Non Govt
                                                                                       Organisation
34   Noosa Environmental Education Hub        Educator                                 Non Govt
                                                                                       Organisation

35   Noosa Ferry and Cruise Company           Manager                                  Commercial

36   Noosa Ferry and Cruise Company           Manager                                  Commercial

37   Noosa Fish Providers Pty Ltd             Manager                                  Commercial

38   Noosa Heads Surf Life Saving Club        Restaurant Manager                       Commercial

39   Noosa       Integrated    Catchment      President                                Non Govt
     Association                                                                       Organisation




                                                                                                         19

Section 20

40   Noosa       Integrated    Catchment     Project Officer                          Noosa Community
     Association
41   Noosa Jetty Builders                    Owner                                    Commercial

42   Noosa Parks Association                 President                                Non Govt
                                                                                      Organisation
43   Noosa Yacht and Rowing Club             Club Manager                             Commercial

44   Noosaville Fish Markets                 Manager and chief                        Commercial

45   O-Boats                                 Manager                                  Commercial

46   Noosa Waters estate                     Director                                 Noosa Community

47   Ozfish - National                       National Director                        Non Govt
                                                                                      Organisation
48   Ozfish - Central Moreton Bay Chapter    Manager                                  Non Govt
                                                                                      Organisation
49   Ozfish - Noosa Chapter                  President                                Non Govt
                                                                                      Organisation
50   PDF Food Distributors Pty Ltd           Sales Rep - Sunshine Coast               Commercial

51   Noosa North Shore Association Inc.      President                                Non Govt
                                                                                      Organisation

52   QLD Oyster Growers Association          Executive Officer                        Commercial

53   Queensland Boating Patrol - Noosa       Manager                                  State Agency

54   Queensland Parks and Wildlife Service   Acting Principal Ranger, SE Queensland   State Agency


55   Queensland Parliament                   Independent Member for Noosa             Politician
56   Resource Recovery Australia             National Manager                         Commercial
57   Resource Recovery Australia             Noosa Facility Manager                   Commercial

58   Shuck It Pty Ltd                        Manager                                  Commercial

59   Soulfish Seafoods                       Owner                                    Commercial

60   Noosa Today                             Journalist                               Commercial

61   Tewantin Bushcare                       Coordinator                              Noosa Community

62   The Thomas Foundation                   Advisor                                  Non Govt
                                                                                      Organisation
63   The University of Queensland            Lecturer                                 Science Community




                                                                                                        20

Section 21

 64        Thomas Corner Eatery                   Chef and Owner                              Commercial


 65        Tourism Noosa                          Head of Tourism Sustainability + Design     Commercial
                                                  Program

 66        Tourism Noosa                          Chief Executive Officer                     Commercial

 67        University of the Sunshine Coast       Lecturer in Animal Ecology                  Science Community
                                                  School of Science and Engineering


Shuck Don’t Chuck – shell recycling project
Shuck Don’t Chuck has commenced with engagement of Moolooolaba River Fisheries and Resource Recovery Australia
to facilitate the wholesale (or bulk supply) of oyster shell for the project.

Shuck Don’t Chuck at a local level has been scoped with local seafood retailers but was put on hold due to COVID-19
restrictions and challenges. The project now plans to re-engage local businesses in Shuck Don’t Chuck in the lead up
to the summer tourist season.

Noosa oyster gardening
The project has selected oyster gardening as the primary wide-community engagement vehicle for the project. While
there will be some opportunities to be involved in oyster bed monitoring, as well as other education actions, the
project team expects oyster gardening to have wide local appeal, to groups, schools and individuals.

TNC has established Mussel gardening in Western Australia, with wide community appeal. The Mussel gardening
handbook will now be adapted for oyster gardening in Noosa. Oyster gardening is currently being scoped, with
implementation planned for 2021, once the relevant permits are secured and management systems established.


Media
      A. Project in the News




                                                                                                                 21

Section 22

Reference: 190729 The National Tribune - Partnership to improve future of Noosa’s waterways - collated




Reference: 200216 Noosa News - Nature group says Noosa’s oysters the real deal




Reference: 200701 Noosa Today - Oysters for river not menu - collated



                                                                                                         22

Section 23

B. Project in Science

Dr Chris Gillies authored a seminar scientific paper about the conservation status of oyster ecosystems in Australian
waters. This paper provides an important background for the Noosa oyster project. The work has led to rock oyster
ecosystems being listed by the International Union for the Conservation of Nature (IUCN) listing rock oyster
ecosystems as critically endangered.

Reference: 2020 Gillies et al - Conservation Status of Oyster Reef Ecosystem of Southern and Eastern Australia -
Global Ecology and Conservation

Dr Chris Gillies co-authored a new scientific study: Charting two centuries of transformation in a coastal social-
ecological system: a mixed methods approach.

The paper was published in Global Environmental Change with Dr Ruth Thurston as Lead author. The study identifies
Aboriginal use, including Kabi Kabi, and early European harvesting of oysters from southeastern Queensland
including Noosa. TNC released a media statement in March 2020 on the study, which mentions the Noosa oyster
project as an example of restoration.

References:
Media Statement: 200301 TNC Media Statement - The surprising history of Queensland’s oyster reefs revealed
Research publication: 2020 Thurston et al - Charting Two Centuries of Transformation in a Coastal Social-ecological
System - A Mixed Methods Approach - SE Queensland




                                                                                                                     23

Section 24

Reference: 200301 TNC Media Statement - The surprising history of Queensland’s oyster reefs revealed

TNC also produced a scientific paper that provides a step by step summary of how to establish a shell recycling
project. The paper uses the Shuck Don’t Chuck project in Victoria as the case study and advises the Noosa shell
recycling project.

Reference: Shell Recycling Paper -Branigan, S, Fitzsimons J, and Gilles CL (In Press) Modern middens: Shell recycling
for restoring an endangered marine ecosystem in Victoria, Australia. Ecological Restoration and Management.


Presentations
Thursday 25th of July (2019), TNC Program Director, Oceans, Chris Gillies. presented at Noosa Shire Council.

Friday 26th of July (2019), TNC Program Director, Oceans, Chris Gillies presented at the Noosa ‘Enviroforum’.

Friday 29th of November 2019, TNC Chief Scientist, Pr. Hugh Possingham, presented at the Noosa ‘Enviroforum’.
Thursday 25th of June 2020, TNC Program Director, Oceans, Chris Gillies, + Project Manager, Craig Bohm, presented
to Noosa Shire Council.



                                                                                                                        24

Section 25

Project finances
This section details the project finances. Table 3 presents project expenditure across five activity codes:
     1. Reef Building
     2. Hatchery and seedling
     3. Reef integrity and performance assessment
     4. Community engagement, volunteering and media
     5. Project management

To date, a total of 18 percent of the total project budget has been spent. This is significantly less than the 31 percent
anticipated in the first year of a three-year and three-month long project. Considerable savings have been made in
the following areas:
     • Data analysis and restoration suitability mapping – achieved in-house rather than outsourcing.
     • Office space and equipment and sundry costs – project manager is working from home office.
     • Technical assessments – project manager and in kind contributions from experts.
     • Travel, training and conferences – COVID-19 impact.

The following current contracts are in place:
    • Ecological Service Professionals Pty Ltd - Seagrass and habitat mapping contract ($42,592)
    • Resources Australia Ltd - Oyster shell transport contract (up to approx. $15,000 over 2.5 years)

The following Requests for Quotation (RFQ) are under development and will shortly be released for tendering:
    • Detailed intertidal and shallow subtidal bathymetric assessment of proposed restoration sites
    • Engineering advice and certification of restoration designs, configurations and signage

In Year 1, the project team also undertook:
     • Extensive detailed planning, with the development of a Project Management Plan, Risk management plan,
         Monitoring, Evaluation and Reporting (MER) plan, Communications plan and development of the Technical
         advisory group.
     • Detailed field assessments to identify candidate restoration sites and analysed those sites with stakeholders
         through one-on-one meetings and site visits.
     • Identified partners for collaboration in aspects such as water quality monitoring.
     • Designed and entered into complex contracts for further detailed habitat and bathymetric assessments and
         shell recycling.
     • Commenced negotiations with Central Queensland University about seagrass restoration in the Noosa River.
     • Engaged a technical intern.
     • Supported three post graduate students wishing to work in beneficial environmental projects in Noosa.

In Year 2 costs are expected to flow towards community outreach, as Shuck Don’t Chuck and oyster gardening projects
coming online, contracts for technical assessments, monitoring and evaluation and the procurement and deployment
of restoration substrates at the first two sites.




                                                                                                                      25

Section 26

Table 3: Total project expenditure


                                                                          Total        Expenditure   Remaining
 PROJECT COSTS
                                                                          Budget       to date       budget

 Reef Building

 Bathymetric, hydrological assessments, oyster bed engineering, rock        861,982        100,915       761,067
 and shell material procurement, construction and engineering
 assessments.

 Hatchery and seeding

 Procurement of oysters, hatchery/farmer engagement, shell                  293,332         29,575       263,757
 transport, recycled shells collection, permitting, record keeping and
 reporting.


 Reef integrity and performance assessment

 Pre-substrate deployment site assessments (bottom ecology,                 580,289         24,325       555,964
 surface profiles, oyster densities, vulnerable habitats mapping (e.g.
 seagrass), river uses analysis (e.g. boating, fishing), data analysis,
 WHS and safety plans, operational equipment, periodic reports.

 Community engagement, volunteering and media

 Community engagement products, engagement coordination, sub-               424,397        177,722       246,675
 contractor identification, contracting and management, volunteer
 briefings, volunteer recruitment, stakeholder meetings, personal
 protective equipment, media statements, media management and
 education material production and distribution.
 Project Management

 Production of Project Management Plan, Monitoring Evaluation and
 Reporting Plan, Communications Plan, project risk assessments, plan        240,000        102,017       137,983
 and risk refinements and revisions, government permitting, legal,
 technical science support

 Total expenditure                                                         2,400,000       434,554     1,965,446




                                                                                                                 26

Section 27

Next steps
The next steps for the project include:

Oyster ecosystem restoration

    1.   Finalisation of detailed bathymetric, engineering and habitat surveys

    2.   Finalisation of restoration substrate design and configurations + engineering certification

    3.   Pre-permit lodgement meeting with SARA

    4.   Drafting of permit applications and approvals

    5.   Submission of permit applications

    6.   Engagement of restoration contractors

    7.   MER Plan implementation

Community Engagement

    1.   Shell recycling and re-engagement of restaurants for Shuck Don’t Chuck program

    2.   Formal community consultation on restoration sites Consultation report to TNC and Noosa Council

    3.   Completion of communication products, publication and distribution

    4.   Scoping, design and launch of Oyster gardening

    5.   Identification and formal engagement of project partners in project actions




                                                                                                           27

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗