Original source · versioned page text
2020-09-14 GC Agenda - Item 7 - Attachment 1 - Noosa River Oyster Ecosystem Restoration Project Annual Report No. 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
General Committee Agenda
14 September 2020
Item 7 - Attachment 1
Noosa River Oyster Ecosystem
Restoration Project
Restoration of critically endangered oyster ecosystems in the Noosa River estuary
Annual Report No. 1
Reporting Period: July 2019 to August 2020
Figure 1. Mouth of the Noosa River estuary (© Marcos Barboza)
This project was made possible by The Nature Conservancy, Noosa Shire Council, The Thomas Foundation
and Australian Marine Conservation Society. The project is located on Kabi Kabi Sea Country.
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.