the Noosa River certifications for the restoration
secured design, restoration substrate
configuration on-site, and
signage and biosecurity
management plan for live oyster
and shell recycling, transport,
handling and deployment.
(A2.3) Community, 1 set of 31 On track The project has met with more
industry and stakeholder engagement December than 67 key stakeholders to date.
consultation sufficient to records provided 2020 Most meetings have occurred
gain majority support for to Noosa Council since February 2020 when the
reef restoration locations. of public and project manager was appointed.
stakeholder See “Stakeholder Engagement”
consultations, section of this report for details.
including one-
A COVID-19 compliant public
on-one
consultation process for the
meetings, open project is currently being
forums, media, designed, in consultation with
etc. Noosa Council staff, to seek
formal endorsement for the
1 written permit preferred restoration sites.
secured from
Noosa Council All stakeholders met with so far
formally have expressed verbal support
allowing the for the preferred restoration
project to sites.
construct reefs.
(A3.1) Community, 1 consultation 31 On track Discussions with restaurants re:
industry and stakeholder completed December Shuck Don’t Chuck shell recycling
consultation to identify 2020 project commenced in
most appropriate 1 + volunteering November 2019.
community volunteering opportunities
opportunities (e.g. shell identified Groups with an interest in
recycling, oyster gardens, supporting restoration
oyster watch, video monitoring, oyster gardening
monitoring). and shell recycling projects have
been identified.
Monitoring, shell recycling and
oyster gardening systems are
currently being refined.
Volunteering will be constrained
by COVID-19 restrictions on
movement and contact, but the
project will adaptively manage
against these to ensure
meaningful engagement occurs.