Original source · versioned page text
2020-09-14 GC Agenda - Item 7 - Attachment 1 - Noosa River Oyster Ecosystem Restoration Project Annual Report No. 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Next steps
The next steps for the project include:
Oyster ecosystem restoration
1. Finalisation of detailed bathymetric, engineering and habitat surveys
2. Finalisation of restoration substrate design and configurations + engineering certification
3. Pre-permit lodgement meeting with SARA
4. Drafting of permit applications and approvals
5. Submission of permit applications
6. Engagement of restoration contractors
7. MER Plan implementation
Community Engagement
1. Shell recycling and re-engagement of restaurants for Shuck Don’t Chuck program
2. Formal community consultation on restoration sites Consultation report to TNC and Noosa Council
3. Completion of communication products, publication and distribution
4. Scoping, design and launch of Oyster gardening
5. Identification and formal engagement of project partners in project actions
27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.