SUPERSEDED - Decision Notice OPW26 0033 (As Published)
Prepared by TOD Consulting Engineers
19660-C301 B Stormwater Bioretention Basin Details 16 June 2026
Prepared by TOD Consulting Engineers
19660-CLC B Stormwater Drainage Catchment Plan & 16 June 2026
Calculations
Prepared by TOD Consulting Engineers
LD-01 A Landscape Design & Rehabilitation 3 July 2026
Management Plan – Cover Sheet
Prepared by Florafield Environmental
Design
LD-02 A Landscape Design & Rehabilitation 3 July 2026
Management Plan – Landscape Design
Prepared by Florafield Environmental
Design
LD-03 A Landscape Design & Rehabilitation 3 July 2026
Management Plan – Specification Notes
Prepared by Florafield Environmental
Design
LD-04 A Landscape Design & Rehabilitation 3 July 2026
Management Plan – Landscape
Construction Details
Prepared by Florafield Environmental
Design
LD-05 A Landscape Design & Rehabilitation 3 July 2026
Management Plan – Vegetation Covenant
Area - Rehabilitation Plan
Prepared by Florafield Environmental
Design
LD-06 A Landscape Design & Rehabilitation 3 July 2026
Management Plan
Prepared by Florafield Environmental
Design
LD-07 A Landscape Design & Rehabilitation 3 July 2026
Management Plan
Prepared by Florafield Environmental
Design
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 13 August 2028, unless an application to extend the currency period
is approved by Council.
Page 3 of 21
Document Set ID: 25057225
Version: 2, Version Date: 14/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (SUPERSEDED - Decision Notice OPW26 0033 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.