Skip to the record
The only place to find full transcripts.

Original source · versioned page text

MCU21/0104.01 Application For A Minor Change To A Development Approval For A Material Change Of Use Of Premises (Undefined Use – Motorcycle / Scooter Sales & Repair) – 16 Rene St, Noosaville · Attachment 2 - (MCU21 0104.01) - Planning Officer'S Report

of 11

Page text shows just the words. Original shows the document exactly as it was published.

PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT                                        7 MAY 2024


developments driveway to provide a 12m x 3.6m bay, and as such the condition for onsite parking
is recommended to be retained.
It is noted that there is no requirement in the planning scheme for the service vehicle to be able to
manoeuvre on site (re. turn around so as to be able to exit in a forward gear). As such, a minor
change to the condition is included in the recommendation to remove the word ‘manoeuvring’ from
the condition. Additionally, a plan annotation is included in the recommendation to require the
proposed awning over the driveway to be a minimum height to 4.5m to allow a service vehicle to
enter the site.


Condition 10
10.   The site must be provided with a stormwater drainage system connecting to a lawful point of
      discharge. The works must be undertaken in accordance with an Operational Works approval
      and generally in accordance with report titled “Preliminary Stormwater Management Plan”,
      rev 0, dated 7 October 2021 and prepared by RECOR Pty Ltd.
Applicant’s Request
The applicant has requested that Condition 10 be amended to reflect the changes to the plans,
namely:




Assessment of Request
Council’s Coordinator Engineering, Development Assessment has reviewed the proposal plans
and proposed change to the condition and provided the following comments:
      The requested change deletes the need for a subsequent operational works application and
      is not in accordance with the recommendation of the applicant’s consulting engineer. It is
      also noted that the recently submitted engineering drawing has been prepared by a different
      consultant and has a drawing number.
A change to the condition has been included in the recommendation in accordance with the
Coordinator Engineering, Development Assessment recommendation, including retaining the
requirement for a subsequent Operational Works application for stormwater to be lodged and for
the full details (including the drawing number) of the Stormwater Management Layout Plan to be
referenced in the condition.


4.    CONSULTATION
4.1. Referral Agencies
Not applicable
4.2. Other Referrals
The application was forwarded to the following internal Council specialists:
•     Coordinator Engineering, Development Assessment




                                                                                     Page 10 of 11
Log in to download the original file

ATTACHMENT 2 - (MCU21 0104.01) - PLANNING OFFICER'S REPORT.pdf · 6.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.