Our Reference: Project: Permanent installation Sand Shifter
Your Reference:
14 July 2008
ENVIRONMENTAL PROTECTION AGENCY
BRISBANE NORTH REGION
PO BOX 168
COTTON TREE QLD 4558
Dear Zoe Helyer
Re: Application for construction of a permanent Sand Shifting facility and Seawater
Supply Pump Jetty, Noosa Spit
I refer to your department’s letter dated 27 June 2008 and respond accordingly to the
information request.
1. Information addressing the land and activity.
The design drawings attached have been signed by an RPEQ as requested.
Nominated or attached plans.
Existing use of land is open space.
The seawater and slurry pipes to and from the sand shifter will be buried however,
depending on tidal conditions on some occasions may become exposed. The
delivery line to Main Beach will be above ground until it reaches the boardwalk.
The pipe at this point will be located under the boardwalk.
The seawater pipeline from the seawater pump will be underground until it crosses
the road and then above ground to the control building.
The jetty will be for private (Council) use only.
There will be no shower in the new building and the toilet will be a chemical toilet
so accordingly there will be no effluent disposal required on site.
Concept plan attached.
2. Information addressing the Noosa Sand Shifter Trial
Reports attached.
3. Erosion prone areas.
The project is a sand recycling system, moving sand from one end of the beach,
where it is naturally deposited back to the source. Accordingly coastal
management and outcomes will not be compromised.
As indicated, the drawing (33020-0-03) the permanent pumping station is located
behind the frontal dune and accordingly will not affect natural cycles of erosion and
accretion. Existing vegetation on the frontal dune will not be affected and once the
temporary pump station’s removed the dune will be revegetated with appropriate
species of plants.
4. Coastal hazards
Refer attached plans and information for storm tide inundation hazard area.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
5. Public access to the coast
Refer to attached drawing 33020-0-03. There will be no adverse affect on public
access to the foreshore.
6. Water Quality Management
There will be no impact on water quality. The new seawater pump will be electric
not diesel negating any opportunity for spills. The new slurry pumps are also
electric. There will be no discharge other than seawater and the sand slurry.
7. Stormwater Management
Refer design drawings
The overflow pipe will extend to the top of the beach close to its current location.
The beach profile has not changed during the course of the current trial other than
some scouring at the discharge point that is quickly filled in once the tide is in. The
discharge will be significantly reduced with the new system so accordingly will be
of less concern. If there is an issue, a flexible pipe will be attached to the end to
extend further down the beach.
8. Acid Sulphate Soils
Refer attached report
9. Biodiversity
The site is not located within a fish habitat area.
During the trial program there has been no indication of interference with soft
bottom benthic or marine life. No marine life has been noted on the screen.
Yours faithfully,
Wayne Brogden
Team Leader Technical Support
Used in these records
08/0383 - Information Response to Referral Agency - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11 KB (small file)
- File type
No other editions are linked here.