Council archive · source document
0015D13F.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
NE@LOKG We Checklist - Applications Involving Land
\ Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter. ©
EEX ADB TOATIO NEO Bae a a IEEE TEMPER Ae Ue RR TE aE A BR ote
1.14. FormtPartA
1.1.1 Ensure that the form is fully completed. [7]
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
"4.4.2.1 Ifthere are multiple owners, the consent of each owner is required. v\ Ps
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [7]
© 1.1.2.1. Ensure that each of Forms 8-0 which are attached are fully completed. [7]
2:7 PREFERRAC INCOR AR eee ee ene chee ne coer nb ip NPE ne BF
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. al
SoS ENVIRONMENTACLY RECEVANT ACTIVITIES, on at van cramdhuden dann he aap dos
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council {see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
‘4 FPORM DE REQUEST.TO CHANGE ABEROVAL oo Oe eee Oe
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
Sih BEANS Saha. OR BEE line Uliana orate nab Sunes SCRE OS NaS
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
' Works) accompanies the application. In addition ensure that each set is complete.
5.2. Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is [ - |
unbound.
gait SIA a a a ee arty wmacanngmet ream ena Ra A Sn rN REN NT ERE mrt | sat ; ib watt > oe ae wash
6ke SUPPORTING INFORMATION. no ee aa a a ie ke tae ROU UN WORE [email protected]. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration [ - |
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
: capable of reproduction.
6.2. Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. =
iE eo es 5 Soe tiecp Ths ul Poe th ancl ‘ ne a ST TT A ICY RE, MITT MO IE NS AP: Me a ae abe ; re
PP TREE ee a Pe nd dati Pireasceadees aw Ege G OES AEM a TA
7.4 Ensure that the application fee, as determined from the Council's adopted scale of fees, LA
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form.
Receiving Officer Leta omnes Date DAP OM ccssesce
Having completed this form and.accepted the application, please deliver both to the following IDAS Application Receiving
trays:-
« Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.
« If the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
* ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
¢ = =Inall other circumstances - AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc /See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 28 sections
Section 2
“ nd
~ INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
~~ G RRR ror eit gege BR ECR AN IRSA ME OIE AE RE Ted eg nae ard
OR Stier telat 2A font inl alo) lle= ol cereal |
, ost oo is 7 rs eee POR PEN Ey rae ro Rea Naat OL vohwead at a EBA ee Sete ne ke RE ee
3 a t
C detail oS
| OMmmMon Weralis ail
. ‘The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one {1) or more other completed parts of tha Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land 1. Street address: fnctudinghouse number, street name, suburtvlocalily name & postcode) {if appficable)
teed Hower 2 decrpion fh land 0 Wnts (Ze 5 ounseehker CIAL. Mik avi lle 4s
Alt land the subject of the application, must be , 2
@ Ee onnentty Retsan avy (ERA 2. Name of water body or watercourse, within which the development is proposed: (if appficabie)
nade atin 2-2 NOEGWAHS
development is proposed within a water body or — -
watecourse. 3. Loton plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
ented Iya oe pen bya on pn despa, Tee eas hoff l¢¥n On G7F HAAS
for et - Most land can be
Ce comanent ue cesumenscrrowwh | 4 The above description is for: (ck appicabie box)
However, if the land on which the development is ae the land on which the development is proposed; or
Po eee ne a intaterboavar (ji) the land adjoining the water body or watercourse, within which the development is
watercourse) provide - proposed; or
0 agadomote [71 (iii) the water body or watercourse.
® sgotcnadjacet lard (eg in Morton Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
waremameatvmemmyem) [ } fd} EC
development is within a water body or watercourse.
euie for cas tating ae | erment ree 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) {if applicable)
now meteoniinwanrmrvomiwtine | [VOSA Wire lOWal d
focal government's area unless provided for under the a -
Local Government Act 1993. / 9. Port authority for the strategic port land or strategic port land tidal area on which the
sore A casei ; development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
@ Prdagsatletails fy \ 10. Existing use of the land: (eg. vacant, single house, shop etc.)
ttAhereig iis may be
[ 1. Proposed use of the land: (eg. 6 unif apartment building, 30 Jot residential subdivision, ERA for aquaculture in
13 JUL 2007 | H ” ponds with a total arpa of 7 ha for which wastes are released into waters etc).
<A NOOSA SHIRE COUNCIL Ri [Kriva Re F701, [Crs
O ter g plicable pars BFF Im DA 12. Other parts of Form 1 completed as part 6f this application: (eg. Part D, Par, etc}
Part Avgfust afwass be led b
when a partt cord Nay bop fefer to puide 4.
Applicant detalls 13. Applicant's name: . 15. Contact person: -
aymgemmememe™ | Whnca Te Ky Ba Ve
sppicant ned not be the omer ote land UNA fe ky Bui Bers CA
When signing and tedaing this appiication 14. Contact number. \/ 16. Facsimile number/e-mail address:
The appficant Is responsible for ensuring the
information provided Is correct. Tre een / c> S
manager, any referral agency & the Chief Executive
(whore 2potcabe) wil ely on this Information when | 17. Postal address:
{the applicant ig a company - a contact person KO FOx &* iH Oo C —
ithe anolcat isa company acor
must be shown. 48. Signature: /7 19. Date;
ACL Z
ft eeeSection 3
| «
col < k
*
* | INTEGRATEO PLANNING ACT 1997 Part A, Version 2.4, 29 May
Land owner's consent {if appicable) 20. Land owner’s consent to the making of this application:
SE ee afte appara De Pp Name | Sionature | ate
Section 3.2.1(3) of the IPA prescribes that an
written consent of the land owner!s, if the appfication . AANA
involves: I 5-
() amatertal change of use; 9 ROR WIELSEN | a LDU. LN... 976-0)
(9 reconfiguration of a fot 7 .
7 makeioaon i a ees| | ST, MELEE | OMNI CC aepnw.....0:6.0T
7) work on land below high-water mark & not within a i ,
{4} work on rail corridor fand defined under the (iti) /]
Management Act 1995;0r . ---
Transport infrastructure Act 1994. noe e cee eee cee eee ee ee cece eeceeeeeees Pn wee eee cee eee ence ee beeen eee ee ee
Section 3,8.1(2}(a) of the IPA provides that .
landowner’s consent is not required for a mobilg or {iv)
For more information refer to Guide 1, (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1{5) of the IPA requires evidence of ‘
ent be glen for that ne on State coastal land under the Coastal Protection and Management Act 1995)?
involve a prescribed State resource. O - goto Q24 (] YES - go to 022
Section 3.2.1{10}(a)(@ of the IPA prescribes that . Lo, . .
application ‘cama be taken tbe propery made 22. This application is accompanied by evidence: (tick applicable box)
@ ve en ee 1 (i) of the allocation of, or entitlement to, the resource ~ attach evidence and go to Q23(v)
Refer to schedule 10 of the intograted Planning (J (ii) the chief executive of the department administering the resource is satisfied the
Regufation 1998 that prescribes the nature of evdenca i i ' i ,
rod by the State fn support ofthe lndging of ths development is consistent with an allocation of, or entitlement to, the resource ~ go
development apptication. . ; . oo. .
(_] (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to Q23
Adve foe completing 223 sndatory ttevdenoe 23. Evidence of the resource entitlement:
tear aes aS (nab ences (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water ls mandatory where the . applicable,
application involves any water or riverine quarry (ii) Name of delegated officer
stort Td
Section 3.2.1(5A4) atows the eaouce reer ee
the fime the eviden be used. ust be se i:
sat {the evidence fine Tilted (a) m (iii) Position of a officer
{iv) Ps of ~ officer
(v) Date
(vi) -_ date of evidence tees
Assessment triggers 24. We Checklist completed and attached to this application?
re titin oPoe hee Botine rom oni rs Ss (L] NO - the assessment manager may refuse to accept this appication on the
must be completed for all other applications, grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
scan auger nceaee Pan/Oraving/Repor Number | toate
the application during public scrutiny or public (i) OT WU—/ é4|sor) otrice | fy 07
manager, referral agencies and any person viewing . ° . .
oseromeaie 0 O7]/Ug A... \Naliea Enleeticl yer
notification to understand the scope of the proposal wae Ee a fe Re oe Loe wenn nnn enn han aa fon Denon nnn Pe Rp
(iii)
(iv)
a a
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
aa gg es
OFFICE USE ONLY (applicable to assessment manager's,
DATE RECEIVING OFFICER'S | ¢7 REFERENCE
FEW [Bee 3/40
Notification of Engagement of Private Certifier (Optionat form be
To, Council. | have been engaged as the private certifier for the building work referred to in this application.
Dateofengagement / / AccreditationNumber_ Name Signature;Section 4
é Sng fh
— INTEGRATED PLANNING ACT 1997 Part A, Version, 2.4, 29 May 2006
, 7 elaine i Die ia\{0) pmen if App! Kereiie AR eeeee ees Oe eee d asad
; 7 : a a te ae SE EE RRR eh ce ORY cal Sed a a iat ce oR cee
, I a oe aE ns eae eS Oe eS
a A -s ;
| Common details ai!
A. £7.
The completion of aff applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For mora information on the parts of the Form refer to www.ipa.ald.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land 1. Street address: ¢nctudinghousa number, street name, suburtvlocality name & postcode) {if applicable)
ented However, desenpn of eared [gX[3_ Du ASEEKER, Os oOsinie ALC
Alljand the of the ion, t be mm
© Hee tay Retort ncbety (ea 2. Name éf water body or watercourse, within which the development is proposed: (if applicable)
development is proposed within a water body or -
wateoourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be
Kerby alt on lan desciton These deta OF [ER ON I~ Lf ge
Py nocanent ue Sonmentsortivouhe | 4 The above description is for: (tick applicable box)
However, ifthe land on which the development is () (i) the land on which the development is proposed; or
Seriorclpran tn peocend we walerbooror [Ti the land adjoining the water body or watercourse, within which the development is
watercourse) provide — proposed; or
0 niosgomtad oe C1 (iii) the water body or watercourse.
" own yafacent ant og. o Morton Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
wiememamavemmemie | [ ) CL
Gevelopment is within a water body or watercourse.
AE TE ee coer ment area. 8, Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo eft.) (if applicable)
Ramcmanammnneatonr | | (Voosa SDire lanc{ Sd
local govegments Beer unless provided for under the 008A Sf71 Te. LOEA7Cr
ies eng 179 9. Port authority for the strategic port land or strategic port fand tidal area on which the
eye aba co aos x development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
@ Proposal detdita/ E, 2. ¢ 10. Existing use of the !and: (eg. vacant, single house, shop etc.)
wl I ers Buy avaible, debieyya D .
=| provided in an Denes ahi !
Has, Sup - | 11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
FROW T coy fec ponds with a total arpa of 7 ha for which wastes are released into waters efc).
TER Ly eo Fivtei [Oley
“Sue ange rts rm 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part J, etc)
moments, | LE Ss CAICEUST
completed parts of Form 1. For information about ao
when a part of Foem 1 may apply refer to Guide 1.
Applicant details 13. Applicant'sname: | i 15. Contact person: 2
crpicant nee ot be fo ower of be and. [Noose Fy BADES| |G LA
When signing and lodgina this application 14. Contact number: C/ 16. Facsimile number/e-mail address:
information provided {s correct. The assessment
manager, any referral agency & the Chief Executive
(where applicable) will rely on this information when ~| 17. Postal address: -
eee 20 LOX QFIF Tpaaie Zoe
Hitha applicant Is a company - a contact person [HO a IT Nk OF: cokes
must be shown. 18. Signature: f/f 19. Date:
Ud
GSection 5
hy ws
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4,
Land owner’s consent (if applicable) 20. Land owner's consent to the making of this application:
spc ania espa Pp eme | Stanature | ate
application must contain, or be supported by, the 4 Signature Date
written consent of the land owners, if the appication 0 f A, Ce S. 6-07
() 2 material change of use; _ tol Nested Kieran IT AY TT
involves: i z
(@ reconfiguration of a lot;
G9) work on land below high-water mark & not within a (ii)
Canal as defined under the Coastal Protection and oe ee eee eee n en ecccwenccncwcecececcbaccencceccccccanensccnececcccnscccdecccunnecceee
Management Act 1995.0r exe
(tv) work on rail corridor land defined under the (iii)
Section 3.8.1{Z}a) of the IPA provides that .
landowner’s consent is not required for a mobile or {iv)
For more information refer to Guide 1. (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.(5) of the IPA requires evidence of quarry méterial on State coastal land under the Coastal Protection and Management Act 1995)?
resource entiement be givan for applications that
involve a prescribed State resource. O - go to 024 (1 YES - go fo q22
Section 3.2.1(1 of the IPA prescribes that . ep . .
application canta te taken to be property made |22. This application is accompanied by evidence: (tick appiicable box)
@ without evidence of ie ae (1 @)_ of the allocation of, or entitlement to, the resource — atfach evidence and go to 023{u)
Refer to schedule 10 of the integrated Planning [_] (ii) the chief executive of the department administering the resource is satisfied the
Reguiation 1998 that prescribes the nature of evidence ; i , .
sod by the State in support of the lodging ofthis development is consistent with an allocation of, or entitlement to, the resource — go
development apptication. ws . . neg wg
1 {ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource — go to Q23
Advice for completing 223 valor it edonoe 23. Evidence of the resource entitlement:
ado Oto isos | (i) Resource entitlement / authority details (vii) Official stamp of the department
The offical stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . ficable)
application involves any water or riverine quarry (ii) Name of delegated officer
material under the Water Act 2000. CY
Section 3.2.1(5A) allows the resource manager to fimit
the time the evidence may be used. 023 (vi} must be tii iti
Tote tthe evvhionce s tne Ernted (ii) Position of a officer
(iv) P of ~ officer
(v} Date
(vi) Expiry date of evidence (if applicable)
Assessment triggers 24. ts the JOAS Assessment Checklist completed and attached to this application?
Misheieinieers.-s sa niorvarseieh ony A YYES [INO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
Plans | drawings / reports 25. Plans/drawings/reports accompanying this application:
Sipe be opal eee fe eiesnat Plan / Drawing / Report Number
anager, referral agencies and any person viewing .
the application during public scrutiny or public (i)
notification to understand the scope of the proposal wot retereccsa reese sesecenscaececesasces fearcoseecaser co cansosonaascecacs
and any potential impact. (ii)
(iii)
(iv)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide ail applicable information required by Part A
and any other relevant part of Form 1.
ee eee en eee ener
OFFICE USE ONLY (eppticabie to assessment manager's}
een [tee |e ee
RECEIVED NAME/S NUMBERIS
Notification of Engagement of Private Certifier (Optionat format}
To Council. { have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement / / Accreditation Number: ___ Name: Signature:Section 6
7 4 . 7
fo. «
INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
; Form 1 Development Application idas
Operational &/or building work '3
assessable against a local government’s planning scheme aC
. ; *
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time).
Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against ~ [[] Building work assessable against a planning scheme - provide details of the aspects of building
a planning scheme are determined by the work (e.g. building height greater than 8.5m; building work on high landslip risk area)
scheme for a particular local goverment and
willvary across ihe State cnt tlian GUE
To determine the types of work that are Operational work assessable against a planning scheme - provide details of the nature of the
assessable under a particular planning operational work (e.g. roadworks; fandscaping; drainage works; stormwater; water infrastructure; sewerage
scheme, contact the relevantlocal infrastructure; earthworks; clearing vegetation; signage) ;
Theifoma NAS Timber fey.
. The information in Q2 is necessary for pe fy pe Li
(/
statistical and planning purposes. 2. Is the application for operational work invol¥ing the creation of new lots?
io ‘CO YES - specify number of new lots to be created below
3. Does the proposal involve the construction of a canal that is associated with reconfiguring a lot?
meno Ol yves
‘Nature of the application _ 4. This application is for: (tick one (1) or both if applicable)
A development PA en - {_] Pretiminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
development to offur, ghile gpraliminary infrastructure. etc .
approval is.a‘glap-trthe-ahipfoyal process *
te ae a ok cca ett patting ETT
nm R Eo Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
@ Q E { VE D infrastructure, etc ‘
13 guy ‘mba Jéefy-. ,
te 2007 SY . _
Nos, Stipe co 5. Are the works subsequent to a previous development permit or preliminary approval?
c FRON TCounre Ch Rao [] YES - provide details of all previous approvals
‘ MY
<-
\ %
Portable Long Service Leave levy (if |6. ls payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) ; . C) YES - complete Q7
Prior to issuing a development permit for the
works, the assessment manager is required O ~ 07, 8 & 9 do not apply
by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSL levy |7. Has the PLSL levy been paid? .
has been paid. . oO YES ~ complete 08
For further information refer to
hito:/Amww.gleave.qld.gov.au (_] NO - the appticabie levy must be paid before a development permit can be given for the works
8. How much was paid?
'|9. Whats the receipt number of the payment?Section 7
'" .
Pia.
INTEGRATED PLANNING ACT 4997, Part E, Version 2.1, 18 June 2007.
PLEASE NOTE
. This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
’ REFERENCE
{i) Is aPLSL levy applicable in this instance? JNO L_] YES - complete Q(ii)
(i) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?
[_] NO [_] YES - provide receipt details ;Section 8
° INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Apr 2007
” hee . ; :
AS Form 1 Development Application ort
(Formerly the “Referrals Checklist”)
° -
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerty referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the .
“Referrals Checklist. The name of this checklist was changed from 25 July 2005 to more accurately describe its function. .
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.9. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist-the applicant to
determine the assessment manager for the application. . .
© 4. Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. __ Itis the responsibility of the applicant to accurately complete this checklist.
6. — Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
7. — Depending on the nature of the application, an applicable State entity may be either the assessment manager or an DAS referral agency for the application.
8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material fodged in support of the application} to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
/ 9. Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qld.gov.ay. Guide 25 explains the role of the IDAS
Assessment Checklist in the [DAS application pracess, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
, www.ipa.qid.gov.au. - ’
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regutation 2006.
ng LL A
| SECTION 1 - STATE ASSESSMENT (completion mandatory) _ , a
{Note: The following state assessment triggers apply.to development other than for building work assessable against the Buifding Regulation 2006, wast
Environmentally relevant activity 1. The application involves: (tick applicable bowes)
For more information refer to Guide 4. \L1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Untess you answered “none of the above” to 01, has not been made - complete Part G of Form 1
the application requires assessment by the — . . .
administering authority?. | {ii} a mobile or temporary ERA for which a code of environmental compliance has not been
. If an entity, other than the administering made - complete Part G of Form 1
authority, Is the assessment manager for the — - (iii) none of the above
application, the administering authority is a ‘
concurrence agency fir the gpptialion in relation
to this maker. a, . :
NotezAn appipation involving ERE ade 20 ;
wilfalQ seytiire compel o Fa PagF uit,
fot appiplal where atrallotation under Me Wate
porzefo sequen WEN) .
f * —_ Continued overleaf
43 JUL 2007,
HOOSA Sitize CO | .
32 COUNCL ,
FRONT COUNTER ie) . .
| ora 6S :
PLEASE NOTE>~ The assessment manager may refuse to accept an application, which, at the time of Jodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OT
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED , | REFERENCE NUMBERIS
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA,
2 For additional information refer to Guide 6 ‘Dees my application trigger the referral coordination process?", ‘
3 The ‘administering authority’ may be elther the Environmental Protection Agency, the retevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for adetegated ERA).
Page | ; . ;Section 9
INTEGRATED PLANNING ACT 1997 / / IDAS Assessment Checklist, Version 20, 2 April 2007.
State-controlled road matters 2. The application involves: (tick applicable box/es)
For more information refer to Guide 3 (J {i) development on land contiguous+ to a State controlled road and for -
Unless you answered “none of the above” to O2, . . .
the application triggers referral to the Department J (a) materia! change of use assessable against the planning scheme;
olain Roads (DMR) as a referral agency. (J (b) reconfiguring a lot unless - |
In certain circumstances DMR will be an advice . . . .
agency, while in other circumstances DMR wil » the total number of lots is not increased; and ;
be a concurrence agency. + the total number of lots abutting the State-controlled road is not increased;
Schedule 2 of the IP Requiation will assist you to . . . . .,
determine where DMR is an advice or [1] (c) opera tional work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a fot mentioned in (b} above)-
« associated with access to a State-contralied road; or
+ for filing or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(C (ii) development on land not contiguous to a State-controlled road and -
[_] (a) material change of use -
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. that schedule; @
(J (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
“* and exceeding the thresholds set by that schedule;
[_] (c) operational work {not associated with a material change of use assessable against the
. planning scheme or reconfiguring a lot mentioned in (b) above)—
; * assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. that schedule.
(iii) none of the above :
- Clearing vegetation 3. The application-involves: (tick applicable box/es)
For more information refer to Guide 12. | (i) material change of use -
Unless you answered “none of the above" to Q3, . . :
the application requires assessment by the (a) assessable against the planning scheme;
Department of Natural Resources and Water ining —
(NRW), (b) on a lot containing . .
if an agency other than NRW is the assessment . * acategory 1, 2 or 3 area shown on a property map. of assessable vegetation; or
manager for the application, NRWisa - + if there is no property map of assessable vegetation for the lot - remnant vegetation;
poncurTence agency forthe application in relation (c) where the existing use of the land is a rural or environmental use; and
If you ticked 03(i) or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 ,
referrat to NRW for assessment regardless of CL] (ii) reconfiguring a lot -
whether vegelation clearing is proposed or not. ; _. @
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
. “ assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation:
, (b) » where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and ;
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
. C1 dill) operational work - :
; (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and '
(b) not associated with a material change of use assessable against the planning |
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Pari J of
Form 4
(iv) none of the above.
Strategic port land 4. The application involves:
i ated te. i ae vish [J (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (T|
you ti i) - the relevant Po. ority is the
{ manager for the application. Act) - complete Part! of Form 1 ;
If you ticked (ii) Queenstand Transport is a (li) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application. TI Act for the strategic port land - complete Part | of Form 1
(iii} none of the above
4 Land contiguous to a State-controllad road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controtled road; or that is part of a future State-
controlled road. .
Page 2Section 10
4 ‘
a INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Aprit 2007
Acid sulfate soils 5. The application involves development on land situated in an identifiedS local government area
For more information refer to Guide 10, and where the surface of the land is: (tick applicable box)
Unless you answered “none of the above" to Q5, (J (i) below 20m AHDS and the development will involve the excavation of 1000m?or more of
the application requires assessment by F . AHD .
Department of Naturat Resources and Water soil or sediment at or below 5m , OF :
(NRW). ~ (2) (ii) at or betow 5m AHD and the development will involve filling the site with 1000m3 or more
ff an agency other than NRW is the assessment of materiat :
manager for the application, NRW is an advice- {
agency for the application in rélafion to this iii} none of the above '
matter.
Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities majoyhazard facility as defined under the Dangerous Goods Safety Management Act 2001?
- For more information refer to Guide 17. 0
If you answered "YES" to Q6; the application
requires assessment by the Department of * (YES - complete Patt of Form
Emergency Services (DES). .
{f an agency other than DES is the assessment
manager for the application, DES is a ,
concurrence agency for the application in
relation to-this matter. . .
Water related development under the |7. The application involves:
Water Act 20000 [J {i} operational work, for taking or interfering with water under the Water Act 2000, that is:
© For more information about items (a) — (f), refer {tick applicable box/es)
to Guide 15. For more information about item ’ . : Co . oo .
(g), refer ta Guide 14 Does my application OC] {a} ina watercourse, lake or Spring, (eg. a pump, gravily diversion, stream re-direction, weir or
involve assessment of a referable dam? , dam) - complete Part Kz, K3, Ks, Ks, or Ka of Form 1 whichever is applicable;
Unless you answered “none of the above" to Q7, [_] (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
the application requires assessment by the : : : :
Department of. Natural Resources and Water K; of Form 1, .
(NRW). ; [J (c)_ for a subartesian bore, in declared subartesian area’, or in acertain areacovered
if an agency other than NRWis the assessment by a water resource plan, for use for purposes other than stock and/or domestic
manager for the application, NRW is a use fete Parl Ky of Form 1: .
concurrence agency for the application in . . ~ complete Pan Ky OF ror f, /
relation to this matter. [_] (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
. and/or domestic purposes - complete Part Ky of Form 1;
[J (e) for taking overtand flow water in certain areas covered by a water resource plan
— complete Part Ks of Form 1; ;
[_] (f} for interfering with overland flow water in a drainage and embankment area -
complete Part Kicof Form 1
(J (g) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
wm none of the above.
Removal of quarry material froma |8. Does the application involve development for the removal of quarry material from a watercourse?
© watercourse requing an allocation notice under the Water Act 2000?
For more information refer to Guide 16. NO
If you answered “YES" to Q8, the application
requires assessment by the Department of L_] YES - complete Parts Kr and G of Form 1 .
Natural Resources and Water (NRW).
If an agency ather than NRW is the assessment .
manager for the application, NRWisa
concurrence agency for the application in . ‘
' felation to this matter. : .
Note: Part G of Form 1 is required to be
completed as the activity of removing quarry —
material from a watercourse is also an :
Environmentally Relevant Activity (ERA). .
5 The identified tocal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloota, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
6 Australian Height Datum (AHD).
7 The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
8 Referabte dam is defined under the Water Act 2000. :
9 Watercourse is defined in sch 10 of the IPA. :
. Page 3Section 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 -
Operational work that is tidal work or |9, The application involves operational work that is: ( tick the applicable box/es)
work in coastal management district (1) (i) tidal work"® as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 8. For : : . ,
more information about prescribed Bdal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or ;
local goverment lidal areas refer to Guide 24. [J (ii) tidal work that is prescribed tidal work" other than in a canal! -complete Part P of Form 1: Or
Unless you answered “none of the above" to Q9, vee . wpe gs :
the application requires assessment by the (1) (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a} to (i) below are ticked. :
If an agency other than EPA isthe assessment [J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
manager for the application, sa eae :
‘concurrence agency for the appkcation i other than those works in tidal water) where the development has been determined not
relation to this matter. to be assessable against the Water Act 2000 ;
Local governmentis the assessment manager [_] (b) constructing a canal12 intended to be connected to tidal waters:
for all prescribed tidal work. . es
["] (c) constructing an artificial waterway;
[[} (d) reclaiming land under tidal water;
CJ] (e) disposing of dredge spoil or other solid waste material in tidal water;
(J (f) "interfering with quarry material on State coastal land above high-water mark;
: [J] (g) draining or allowing drainage or flow of water or other matter across State
‘coastal land above high-water mark;
[J (h) removing or interfering with coastal dunes on land, other than State coastal “@
that is in an erosion prone area and above high-water mark;
CJ (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
¥) none of the above. ;
Operational work below high water 110. The application involves operational work that is: ( tick the applicable boxes)
mak ,; (_] (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For : 4 : : ,
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
local goverment dal areas Oe to Guide 24. 1] (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; or
Unless you answered “none of the above" to ses . wage ar
Q10, the application triggers referral to (1 (ii) carried out within a coastal management district'S under the Coastal Act and for -
Queensland Transport (QT) (Maritime Safety ; i j i iat in ti _
id) as a concurrence agency. [_] (a) disposing of dredge spoil or other solid waste materiat in tidal water - complete Part
. M of Form 1;
Loca! government is the assessment manager i” .
for all prescribed tidal work, 3 (b) reclaiming land under tidal water - complete Part M of Form 1; or
; [1 (c) constructing a canalt2, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1; : /
(iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es) @
For more information refer to Guide 18. (] (i) -a material change of use assessable under a planning scheme involving operationa
Unless you answered “none of the above" to work carried out completely or partly in a coastal management district's
Q11, the application requires assessment by the | . . . ; _ a
Environmental Protection Agency (EPA). (J (ii) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment work, Carried out completely or partly in a coastal management district that is -
t for the application, EPA is’ . . .
conanence agency for the application in + the construction of a new premises with a GFA'6 of at least 1000m?
relation to this matter. e the enlargement of the GFA of existing premises by more than 1000m?
LJ (iii) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
Lo completely or partly in a coastal management district
[1 (iv) reconfiguring a lot” assessable under schedule 8 of the PA and in connection with
the construction of a canal12 - complete Part M of Form 1
(v) none of the above ~ |
LP , .
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed bdal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995 ,
13 Tidal work is defined in sch 10 of the IPA. ’
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes cerlain lida works completely or parly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coaslal management district under the Coastal Protection and Management Act 1995, other than an area declared as a~
coastal management district under section 47(2) of that Act. -
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway. .
, Page 4Section 12
+
4 INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Development within the limits of a | 12. Does the application involve development below high water mark'® and within the limits of a port
port under the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For 0
Information about prescribed tidal work refer to
Guide 24. (1 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Wf you answered “YES” to Q12, the application :
triggers referral to the Port Authority. ,
The Post Authority is a concurrence agency i the
development is - :
© within 200m of a shipping channel or an entry ;
and exit shipping comidor for the port
e within 1000m of a swing basin, a commercial
shipping whavl, a mooring, anchorage or spoil ;
grounds; - tae
© within 1000 of a planned port facility
identified in a land use plan approved under :
the Transport Infrastructure Act 1994. ;
. {n all other situation the Port Authority is an ;
advice agency. . . .
Marinas 13. Does the application involve operational work that is tidal work for a marina'? with more than 6
* For more information refer to Guide 18, For vessel berths? — |
information about whether a marina is prescribed 0) :
tidat work refer to Guide 24. Thetocal —
@ govemmentis fie assessment manager for afl (1) YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
prescribed tidal work. . .
if you answered "YES" to 013, the application ' :
triggers referral to Queensland Fire and Rescue
Service as an advice agency. no . oo . . , .
Tidal works in strategic port land tidal] 14. Doeéthe application involve tidal works within a strategic port land tidal area20? ,
areas . [*] NO oe .
For. more information refer to Guide 48. (J YES - complete Part M of Form 1 .
Unless you answered“NO” to Q14, the relevant . : . .
Port Authority is the assessment manager for the . ‘
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application. | ; .
Heritage ‘ 15. Does,the application invoive development in a heritage registered place as defined under the
For further information refer.to Guide 19. Queensland Heritage Act 1992? —
If you answered “YES” to Q15, the application NO : .
, triggers referral to the Queensland Heritage
: Councit as concurrence agency for the | YES - complete Part C of Form 1
application. :
Unless you answered "none of the above" to ee © application moes er applicable eres) inst the planni h d the lot sh
Lo, ti i . .
0115(b), the application involves referrat to the (i) amaterial change o use assessable against the planning scheme and the lot shares a
@ Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
agency for the application ‘ Heritage Act 1992:
C (ii). reconfiguring a lot if the lot shares a common boundary with a protected area or
hy registered place under the Queensland Heritage Act 1992;
{ili} none of the above.
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the involves: (tick the applicable box/es)
declared catchment areas within Queensland, . . : . wo.
veter o Guide 13. [J (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Unless you answered “none of the above” to (ii) development assessable against the planning scheme involving the establishment or
Q16, the application requires assessment by the xpansion of a waste water disposal system, other than a disposal system for carrying
Department of Natural Resources and Water . oe - .
(NRW). / outan environmentally relevant activity under the Environmental Protection Act 1994;
if an agency other than NRWis the assessment (ii) none of the above
manager for the application, NRW is a
concurrence agency for the application in ,
relation to this matter. ,
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. .
. Page 5. :Section 13
é . ‘ te
INTEGRATED PLANNING ACT 1997 _ IDAS Assessment Checklist, Version 20, 2 Aprit 2007.
Contaminated land’ , 17. The application involves: (tick the applicable box/es} . .
Applications involving material change of use j ‘ i j -
andi or reconfiguring a lot may tigger this (i) reconfiguring a lot for which all of part of the premises are
referral, (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
For more information refer to Guide 5. e item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above” to e item 6, including the exemption otherwise provided for by paragraph (e); or -
Q17, the application requires assessment by the ¢ item 7, including the exemption otherwise provided for a mining activity or petroleum
Envwonmental Protection Agency (EPA). If an activity:
-agency other than EPA is the assessment activity, or ; ;
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in ordnance - complete Part N of Form 1
relation to this matter. . . .
LJ (ii) a material change of use —
. {a} made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises isin an area -
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
oo iii) none of the above .
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the IP. [1 (i) reconfiguring a lot where any part of the lot is -
voce y y ou answered “none of the above” to * subject to an easement in favour of a distribution entity or transmission entity under the @
18, the application triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easementis granted in that Act; or .
favour of as advice agency. « situated within 100m of a substation site;
[1] (ii) a material change of use, assessable against a planning scheme and not associated
! J g g
with reconfiguring a lot if - :
. * any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and -
* any structure or work that is the natura! and ordinary consequence of the use is, or will be,
. - located wholly or partly in the easement: ‘
. (J (iii) a material change of use, assessable against a planning scheme and not associated
. . 9 . + g +
with reconfiguring a lot if any part of the premises is. situated within 100m of a substation
site; ;
’ (1 (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if - |
+ any part of the premises is subject to an easement in favour of a distribution entity or
: transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
. the easement; .
/ « the work is located wholly or partly within 10m of a substation site: ; ©
{v) none of the above.
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure designated for community infrastructure?
. Applications involving development on land Ne . A Faye ‘
designated for community infrastructure may (i) intended to be supplied by a public sector entity; and
trigger this referral. (ii) on land not owned by or on behalf of the State; and
For more information refer to schedule 2 of the An . :
IP Reculation, (ili) other than development -
if you answered “YES" to Q19, the application (a) for the designated purpose; or .
requires assessment by the chief executive of i ;
the department administering the Act authorising ) carried out by, or on behalf of, the designator. |
the development for the designated purpose. NO |
tf an agency other than the designator is the - ‘ i
assessment manager for the application, the O YES |
designating agency will be a concurrence . . |
agency for the application in relation to this
matter. . .
. . Page 6 tSection 14
. INTEGRATED PLANNING ACT 1997 ‘ : iDAS Assessment Checklist, Version 20, 2 April 2007
SEQ Regionaf Plan 20. The application involves (tick appticable box/es) -
For more information refer to schedule 2 of the [J i) a material change of use of premises —
F Renwieion in a Major Devel Area in the Urban Footprint fe
Refer to Chapter 2, part 5A and schedule 10 of (a) ina Major Development Area in the Urban Footprint for -
the Integrated Planning Act 1997, and schedule CI (i) anurban activity -
see orelevant / LJ in an area inclided in a structure plan where the IPA, section 3.1.6
2of jatory Provisions fi . we, ; ; .
Unless you answered."nane of the above” to applies; , : ‘ ‘
Q20, the application requires assessment by the (in an area not included in a structure plan where -
Off a ‘OUM). . a . oe .
ice of ban Mena erent {OUM) » the IPA, section 3.1.6 applies to the application for the material change
of use; or ,
, e the premises exceeds 10,000m2; or :
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
. So e impact assessment is required under the relevant planning scheme
C] (i) intensive animal husbandry,or ©
6) iii residential development involving a rural residential purpose
. (b) in the Regional Landscape and Rural Production Area for -
{"] (i) an urban activity and not specified in section 2.4(2); or
(J (ii) residential development involving a rural residential purpose andnot
@ , specified in section 2.6(2) mo, ; ot
- ; (c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
. (d) in the Investigation Area for -
‘CJ (i) anurban activity and not specified in section 2.10(2};
(J (ii) residential development involving a rural residential purpose and not —
specified in section 2.12(2); or
C1 (ii) intensive animal husbandry
; C1 (ii) reconfiguring a lot~
od On land in a Major Development Area in the Urban Footprint thatis: . °
: {a) not included in a structure plan; and
/ (b) not specified in section 3.1(2).
(iii) none of the above
Fisheries matters 21. The application involves: (tick the applicable box/es) .
For more information refer to schedute 2of the IP LJ (i) an assessable material change of use for aquaculture - complete Part O; of Form 1;
. Regulation Li) assessable operational work that is the construction or raising of a waterway barrier
Unless you answered “none of the above” to Pp : 9 y .
bm 221, the application requires assessment by the . complete Part O3 of Form 1; :
@ Ce titan industies and Fisheries [] (iii) assessable operational work completely or partly within a declared fish habitat area-
lf an agency other than DPI8F is the assessment complete Part O2 of Form 4;
manager for the anpicaton, DPaF isa C1] (iv) assessable operational work that is the removal, destruction or damage of a marine
concurrence agency for the application in .
relation to items (i) — {iv} and an advicé agency plant - complete Part O2 of Form 1,
in relation to item (v). (J (vy development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area:
, (vi) none of the above. .
. ' Page?Section 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007.
Integration of land use and public 22. The application involves: (tick the applicable box/es)—
vanspo r emmaton refer to Guide 23, schedule {] (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & schedule 2 of the IP Requlation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the schedule.
application triggers referral to QT as a :
concurrence agency. L_] (ii) reconfiguring a lot—
(J (a) onland that is completely or partly within a public transport corridor, and the
‘ total number of lots increases;
[_] (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area; ;
(1) (c). on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(1 (4) _ for a residential purpose within the 25 ANEF contour for an airport;
, [J (e) _for-a residential purpose resulting in 100 or more allotments.
(_] (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
; | (J (a) _ is completely or partly within a public transport corridor or a future public
. transport corridor; @
(CJ (b) will result in work that encroaches into an airport's operational airspace.
, iv) none of the above. ,
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule i) a material change of use assessable against the planning scheme for a purpose
BA ofthe IPA & schedule 2 of the |P Regulation. | . O0 mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above", the . . ,
application triggers referral to QT as a _ Schedule. ; .
concurrence agency. [1] {ii) reconfiguring a lot—
{J (a) on land that is completely or partly within a future public transport corridor,
: . future railway land or a railway tunnel easement: oo.
. (1) (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000mz2 or
. greater; , ;
{_]{c) on land that abuts rail corridor land, commercial corridor land or future railway
{and, and the total number of lots increases:
Co (1) (4) on land that abuts rail corridor land, commercial corridor {and or future railway
land and an easement abutting the corridor or future railway land is created; |
[1 (e) on land that is completely or partly within 100m of, and abutting an approach: : ,
to, a railway level crossing, and the total number of lots increases; ©
, [1 (f} for a residential purpose resulting in 100 or moré allotments.
. (_] (iii) operational work assessable against the planning scheme, but not associated with a va
. material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that— ;
[]{a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
[J (b) is completely or partly within future railway land, or a railway tunnel easement; '
, (J (c} abuts rail corridor land, commercial corridor land or future railway land, and i
_/. the work is within 25m of the railway boundary.
(iv) none of the above, .
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to |
For mare information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: {tick the applicable box/es)—
anneal ered “none of the above" th J (i) a material change of use assessable against the planning scheme and not associated
| application tigers veferral tothe holder of with reconfiguring a lot, and any structure or work will be located wholly or partly in the - |
pipeline licence No 4 issued under the Petroleum easement. : - |
Act 1923, currently Santos QNT Pty Ltd, for [] (ii) reconfiguring alot .
ae. (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
(iv) none of the above. , |
: _ PagesSection 16
., | INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Koala habitat area 25. The application involves: (tick the applicable box/es)—
schethle? of the Dheaaiee and [_] (i) a material change of use of premises in a koala conservation area or koala
Unless you answered “none of the above’, the - _ Sustainability area made assessable under a planning scheme, that is not for a domestic
application requires referral.to the Environmental - activity and will result in- -
Protection Agency as a concurrence agency. L) {a) clearing of native vegetation over an area greater than 2500m?;
(1) (b) anew building and any reasonably associated structure with a total footprint .
a 7 greater than 1000m2;
J (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2:
- (1 (4) extracting gravel, rock or sand from an area’greater than 5000m?;
(J (e) excavating or filling an area greater than 5000m2; .
(J (f additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
; ‘ [_] (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
: result in -
(J (a) anincreased number of lots;
[_] (b) clearing of native vegetation over an area greater than 2500m2.
i (_] (iii) operational work in a koala conservation area or koala sustainability area made
© : assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ij) above) that will result in the clearing of native vegetation
over an area greater than 2500m2. ; oo.
. 1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -
. [7] (a) clearing of native vegetation over an area greater than 2500m?;
[-] (b) extracting gravel, rock or sand from an area greater than 5000m2;
-[_J (c) excavating or filling an area greater than 5000m?.
Wm none of the above.
’ Wild river area 26. Does the application involve development in a wild river area declared under the Wild Rivers Act
pp Pp
For more information, refer to Guide 27 200.
if you answered YES to Q26, you must also J NO
complete section 2 of this checklist. This will .
enable you to determine if your application can { ]YES
proceed in a wild river area and which referral os :
agency will assess your application against the .
Wild Rivers Cade, or if the proposed .
development is “prohibited” in a wild river area. ,
@ Note: Development can be “prohibited in a wild
river area because the application cannot be
accepted by the assessment manager.
Preliminary Approval 27. Does the application involve a development for which preliminary approval is sought under
. Ifyou answered YES to Q27, the application Sectiop’3.1.6 of the integrated Planning Act 1997?
triggers referral to the Department of Locat .
Gavemment, Planning, Sport and Recreation as 0 :
an advice agency. - LJ YES
Wetlands 28. The application involves: (tick the applicable boxes) -
. Domestic acthity the construct [J (i) amaterial change of use, other than for a domestic activity, assessable against the
. omestic activity Means the cons! jon OF use . * tas Bhs :
of a single residence on a lot and any reasonably ; planning scheme fhat is in or within 100m of a wetland;
associated building or structure. Examples of a CJ (ii) reconfiguring a lot - :
nO structure that could be reasonably In or within 100m of a wetland that will result in ;
associated win a single residence include: i .
caretaker’ residence, granny flat, building or CL) (a) more than 10 lots being created; or :
structure used for a home business, (_] (b) lots less than 5 hectares;
(it) none of the above
Note: Welland is defined in the Integrated
Planning Regulation 1998,
Unless you answered “none of the above" to . :
Q28, the application involves referral to the : .
Environmental Protection Agency as an advice ;
agency for the application. ‘ : ;
. Page 9 ,Section 17
INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 20, 2 April 2007...
Conservation Estate 29. The application involves: (tick the applicable box/es)—
Urban purposes is defined in the Integrated C1] (i) a material change of use for urban purposes that is in or within 100m of any of the
Planning Act 1997 as “purposes for which land is following — —
indeatel spartan ee mena rositenta 7 [_] (a): a protected area, forest reserve, critical habitat or area of major interest under
purposes, but not inchiding environmental the Nature Conservation Act 1992; .
conservation, rural, natural or wildemess area (_] (b) a State forest or timber reserve under the Forestry Act 1959;
PUrpOses « , * (1(©) amarine park under the Marine Parks Act 2004;
Unless you answered “none of the above” to [_} (d) arecreation area under the Recreation Area Management Act 1988;
Carron pearaton mvoNes elena) tote Tle) a world heritage area listed under the World Heritage Convention; .
agency for the application. . (J (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
. {J (ii) reconfiguring a lot if -
. {-] (a) any part of the lot is situated in, or within 100m of, any of the following -
— CO (i) — aprotected area, forest reserve, critical habitat or area of major ,
. interest under the Nature Conservation Act 1992;
(_] (ii) a State forest or timber reserve under the Forestry Act 1959;
- (1 {iii) a marine park under the Marine Parks Act 2004:
, (1 (iv) arecreation area under the Recreation Area Management Act 1988;
: ["}(v) a world heritage area listed under the World Heritage Convention;
, Brisbane forest park under the Brisbane Forest Park Act 1977; and @
. {] (b) the reconfiguration involves more than 10 lots being created, or any lot
An none of the above. .
| resulting from the reconfiguring is less than 5ha;
: Page 10Section 18
. INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checklist, Version 20, 2 April 2007 .
, . Z ; = F ; a . 8
SECTION 2 - ASSESSMENT IN A WILD RIVER AREA as
(completion mandatory if the proposed development is located in a wild river area) 4
: Wild River Area 1. Which wild river area is the development proposed in?
. It the responsibility of the applicant to
determine if the development is proposed in
a wild river area.
Information about wild river areas inctuding the The proposed development is to.be located in: (tick the applicable boxes)
geographical location and position of . / . .
Management areas in relation to properties, can CO i) a high preservation area (HPA);
be accessed by contacting the Department of + . . :
Natural Resources and Water (NRW), accessing (Iii) a preservation area (PA); .
the department's webske wwe seqkd.dov,au oF iii) a wild river floodplain management area (FMA);
contacting the department by email on: O . ) . oodp ain ge a (FMA), .
wild [email protected] [_]iv) a wild river nominated waterway;
Note on Referrals (J v) a designated urban area (DUA).
Referrals for development in a wild river area
(other than for agricultural activities and animal
husbandjy activities) are not changed from the
existing referral arrangements.
; Notes on development assessable : . .
against the Wild Rivers Code : .
© For information regarding development in a wild . :
; river afea, see the relevant witd river declaration .
_ and Guide 27. The relevant wild river
_ declaration will provide information regarding
‘ which types of development must be assessed
against the Wild Rivers Code, and in some” ;
casés which types of development are exempt :
from wild river requirements. : :
The notes on development assessable against :
the Wild Rivers Code in this section of the .
. checklist provide some guidance however this _ a
may vary between wild river areas. The relevant ; .
Geclaration will provide the information apptying : :
to each wild fiver area. :
Applications for some new developments wilt not |
be accepted if the proposed development is in a
: high preservation area (HPA). Most applications .
for development activities which may be made . .
including those in a preservation area (PA), must .
be assessed against and must comply with the . . .
Wild Rivers Code where indicated in a retevant
wild river declaration.
Environmentally relevant activities |2. Does the proposed development only involve any of the following environmentally relevant
(ERAs) in a designated urban area activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
@ ERA is exempt from any wild river requirements i) An ERA 28 or ERA 14; or
: Ifyou answered YES, your application for an AY . :
and provided there are no other aspects of this ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
development that require assessment against .
witd rivers, you do not need to comptete the CT NO [] YES (ensure you have completed Part G of Form 1)
remaining questions in Section 2.
Hf you answered NO to Q2, please compiete the
remaining questions in Section 2. .
Clearing native vegetation 3. Is the application operational work for clearing native vegetation in a HPA?
'f YES, there are a limited number of purposes -
for which an application to clear native LJNo LJ YES (ensure you have completed Part J of Form 1
vegetation may be accepted in a HPA. See
Guide 27 fora list of relevant purposes for 4 |f YE S, is the clearing?
which an application may be’made in a HPA. . ; ; ; . .
YES and you ticked Q4 box i) the application LC] i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
may be made and is assessable against the Wild area of agriculture in a HPA (see Guide 27): or
Rivers Code. if YES and you ticked Q4 box il} ays . : . :
the application will not be accepted. L) ii) in a HPA outside a registered area of agriculture?
Note: if clearing native vegetation is In a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements . ,
apply, do not complete the remaining questions
in Section 2. . .
. Page 11 :Section 19
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 «
Works in tidal areas, coastal 5. Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
management districts and fish habitat Development in a wild river area)
areas .
If you answered YES to Q5, and ticked any : O NO O YES ;
boxes in Q6), your application is required to be :
assessed against and must comply with the Wild/ 6. © The application is for one or more of the following:
ers Code.
Ht you answered YES to Q5 and ticked box in L_] i) Operational works that is tidal works or works in a coastal management district (ensure you
Q6, your application is required to be referred to have completed Part M and/or Part P of Form 4); oF ;
the EPA. . . ‘ . ‘ .
Note: specttelwosks are propesed in a toce! [_] ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
government area, itis prescribed tidal work ~ the completed Part O2 of Form 1); Of
relevant local government will be the te ag ' . . .
assessment manag or with the EPA as a [_} ii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
caneurence agency ,
If you answered YES to Q5, and ticked box ii) or
ii} in QS, your application requires referral to
OPIF. ‘ .
if you answered NO to Q5 and ticked box j) in .
Q6, the application will not be accepted. : :
If you answered NO to Q5, ticked box ii} in Q6 ;
and the development is necessary to instatl
authorised works or infrastructure where a ,
development permit is not required, or if a . @
required permit is held, the application must be . .
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
, than specified works or as described above will .
Notbeaccepted.- . . .
If you answered NO at Q5 and ticked box iii) in 7
Q6, the application may be made if the works are . .
ina PA. These applications must be assessed .
against and must comply with the Wild Rivers
Code. The application will not be accepted if the . .
development is proposed to be located in a HPA. . .
For more information about specified works refer : : '
to Guide 27 ;
Residential, commercial or industrial |7, Is the application for residential, commercial or industrial development in a designated urban
development area?
if you answered YES to Q7, your application is
not subject to wild river requirements. Provided CJ NO LC YES
there are no other aspects of this development
that require assessment against the relevant wild) 8 If NO, does the application for residential, commercial or industrial development involve:
tiver declaration or Wild Rivers Code, you do not . | .
need to complete the remaining questions in C] i) a material change of use made assessable in a local government planning scheme .
' g p g
cota OS (ensure you have completed Part D of Form 1); or
if you answered NO to Q7 and ticked either box . . . . . ,
i) or ii} in Q8, the assessing agency is the (J ii) operational works associated with reconfiguring a lot (ensure you have completed Part F ©
relevant focal government. The application must of Form 1). . :
be assessed against and must comply with the 4
. Wild Rivers Code.
Animal husbandry activities _|9. Does the application involve a material change of use for-animal husbandry activities (as defined
‘ Ifyou answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA?
requires assessment against and must comply .
with the Wild Rivers Code. Cj NO C] YES (ensure you have completed Part R of Form 1) :
The assessing agency is NRW.” .
Note: Applications for anima! husbandry :
activities will not be accepted if proposed in a '
HPA. For more details and a definition of animal .
» — husbandry activities see the Wild Rivers Act :
2005 and refer to Guide 27. . |
Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
If you answered YES to Q10, your application a PA? !
requires assessment against and must comply . !
* with the Wild Rivers Code. CT] NO FE YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW. ; —
Note: Applications for agricultural activities witt | 11. If YES is the application for: .
not be accepted if proposed in a HPA. For more . . '
details and a definition of agricultural activities LI i) a material change of use; or
or Suge} Ji operational works.
see the Wild Rivers Act 2005 and refer to Guide A ‘
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance .
techniques is not an agricultural activity as :
defined under the Wild Rivers Act 2005. For ,
more information see Guide 27. |
; Page 12Section 20
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
+ ‘ < = . .
Works that take overland flow water {12. Does the application involve works that take overland flow water in a HPA or an FMA?
The retevant wad river declaration wil state :
works that take overland flow water are either [J No [1 YES (ensure you have completed Part Ks of Form 1)
self assessable or assessable, of are exempt .
from wid river requirements, 13. If YES, is the application for works stated in the relevant wild river declaration to be?
Hf you licked Q13 i), your appfication must be . :
. assessed by NRW against the Wild Rivers Code O i) assessable works : .
and must comply with the code. [J ii) self-assessable works
if you icked Q13 i} an application is not required ee
to be made however the works must comply with [J iii) exempt works
the relevant selfassessable section of the Wild
Rivers Code, othenwise the works become
assessable development for which an application
is Fequired and must be assessed by NRW
against the relevant part of the Wild Rivers Code :
and must comply with the code. ‘ ,
If you ticked Q13 iil) your application is not
Subject to wild river requirements. '
Applications for development thatis other than . :
that stated to be assessable, self-assessabie or :
exempt will not be accepted. : :
Works that interfere with overland =| 14. Does the application involve works that interfere with overland flow water in a FMA?
flow water
@ The relevant wild siver declaration wil state LINno LL] YES (ensure you have completed Pat Ki of Form 1
, N re you have completed Part Kio of Form 1
works that interfere with overland flow water that
are either self assessable, assessable or exempt] 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
from wild iver requirements. jo a . sabl k :
If you ticked 015 i), your application must be i) assessable works :
; assessed by NRW against the Wild Rivers Code [1] ii) self-assessable works
and must comply with the code. . a .
If you ticked Q15 ii) an application is not required LJ iil) exempt works
to be made however the works must comply with
the relevant self-assessable section of the Wild .
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW ~
against the relevant part of the Wild Rivers Code -
and must comply with the code. .
If you ticked Q15 iii} your application és not
subject to wild river requirements. ;
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted. : . .
Waterway barrier works 16. Does the application involve building or raising waterway barrier works in a PA?
Applications for building or raising waterway ‘ ;
barrier works in a HPA will not be accepted ive (J YES (ensure you have completed Part Os of Form 1)
@ If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Aquaculture (non ERA) 17. Does the application involve aquaculture in‘a PA?
eee for aquaculture in a HPA will nol be C] NO : Cj YES (ensure you have completed Part O: of Form 7)
if you answered YES to Q17, your application
must be assessed by DPIF against the Wild .
Rivers Code and must comply with the cade.
Works that interfere with water ina | 18. Does the application involve operational works that interfere with water in a watercourse that is in
watercourse a nominated waterway in a PA?
Note: If the development is proposed in a HPA,
applications for all works that interfere with water [JNO L_] YEs (ensure you have completed the relevant Part K of Form 1}
in a watercourse (including dams or weirs,
. stream realignment or stream diversion) will not | 49 |f YES
be accepted. ‘
In aPA, applications for instream dams and (1 i) The application is for an instream dam or weir; or
weirs may be accepted in nominated waterways. +» ge . . . . .
if you ticked box i) in Q419, your application wil CL] ii) The application is for operational works that interfere with water in a watercourse, and is
not be accepted. for development other than a dam or weir.
Note: Operational works outside a HPA or ;
nominated waterway are not subject to wild
Fiver requirements. :
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website ‘
www.ow.gid.gov.au or contacting the ;
department by email on: .
wild [email protected].
‘ Page 13 : ,Section 21
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007; -
Environmentally relevant activities | 20. Does the application involve an ERA?
be-accepted. Applications which may be made ["] No CL YES (ensure you have completed Part G of Form1)
Most applications for an ERA in a HPA will not :
require referral to the EPA. The assessment of ‘ ;
some ERAs is assessed by NRW, othershave |21. {s the application for an ERA 20 instream?
‘been devolved to DPIF, NRW or delegated .
locat government (see EPA website for more [_] No (I Yes
- information on devolved ERAs) :
complete Os 21 Me to Q20 you do notneedto | 22. Is a quarry allocation notice held for the proposed ERA 20 instream?
if you answered YES to Q20 and the L] No [1] Yes
development is in a PA, your application must be
assessed by the administering authority?! ination j ici 9 ;
against the Witd Rivers Code and must comply 23. Does the application involve any of the following in a HPA? .
. with the code, unless the proposal is for i) a level 2 ERA 7114, (and is for specified works or a residential complex)
development where an application will not be i . :
accepted, or is exempt from wild river ii) an ERA 19 (dredging)
deters fs applicrion wil notte accerie 4 iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
for the development by answering Q21 024, the Wild Rivers Act 2005, and Environmental Protection Act 1994) ;
lf you answered NO to Q21, you do not need to iv) an ERA 22 {out of stream) , ;
complete Q22. If you answered YES to Q21 you
are required to complete Q22. [NO L YES ,
lf you answered NO to Q22, the application will / . / @
not be accepted. Wf you answered YES to Q22, 124, |s the proposed development for ERA 20 (out of stream) and;
the application must be assessed by NRW ina FMA: and
against the Wild Rivers Code and must comply | © — Ma an ;
with the code. . — not low impact; and
If you answered NO to Q23 and the development . . : .
is proposed in the HPA the application will not be — not for a residential complex in the area, or for specified works.
application must be assessed by the EPA or CI NO LI YES . uc
accepted. If you answered YES to Q23, the . ;
NRW (as prescribed in schedule 8A of the IPA} .
against the Wild Rivers Code and must comply
with the code. .
If you answered YES to 024 the application will Lo
not be accepted. If you answered NO to Q24, ;
your application must be assessed by NRW . .
against the Wild Rivers Code and must comply :
with the code.
Exempt ERAs in a designated urban
area
if the developmentis proposed in a designated
urban area there may be no wild river
requirements. See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the : . ‘
Witd Rivers Code (other than exempt ERAs in a /
designated urban area).
Documentation oo 25. Has documentation been included with the application describing how the applicant proposes to
mney be subjects an nforeeven eoucat ane comply with the mandatory requirements, required outcomés, and/ or performance requirements
processing of the application may be delayed. as set out in the relevant part/s of the Wild Rivers Code?
MiNe (J Yes
|
The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW.
: Page 14 : :Section 22
- INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 20, 2 Apri 2007
| SECTION 3 - BUILDING REFERRALS (completion not mandatory) rad
. 7 2 . . : . okt
‘ Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 table 1 and requires special fire services mentioned in schedule 2A part 4 of the Integrated Planning Regulation 1998
schedule 2A of the SP’Requlation. (IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia. :
deemed refusal
Fire safety for budget accommodation | 2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information goto schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation
ares building. -
‘ Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves a workplace incorporating spray painting. .
Requlation
Retail meat premises 4. Anapplication may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedule 2 of the IP retail meat premises.
Regulation . .
@ Private health facilities 5.- An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a private health facility.
Requlation —_ —
Workplace area less than 2.3m? 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
For more information go to schedule 2 of the IP application involves a work place area less that 2.3m?.
Regulation : :
Land contiguous to a State-controlled |7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road agency if the application involves land contiguous to a State-controlled road.
For more information go to schedule 2 of the !P :
Regulation .
Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
| Far mare information go to.schedule 2 of the (P if the application involves pastoral workers accommodation.
Regulation :
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedute 2 of the IP application involves a childcare centre.
Requlation
Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves tand completely or partly seaward of a coastal building line?2,
Regulation .
Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more information go to schedule 2 of the IP © involves a heritage registered place. .
Regulation .
© Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedule 2 of the 1P concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Peguation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area. ,
Integration of and use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace”. .
For more information go to schedute 2 of the IP
Regulation
Railway safety and efficiency 14, An application may trigger referral to Queensland Transport as a concurrence agency if the application
For more information go to schedule 2 of the IP involves future railway land. .
Requlation
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS . oo ,
The local gavernment, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all .
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (1 5}, no
response is taken to be a deemed approval.
, Amenity and aesthetic impact of 15. An application will trigger a referral to the local government if it is :
particular building work for single e fora single detached class 1 building or class 10 structure; and ,
detached class 1 building or class 10 the local government has declared by resolution the following:
building or structure - the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go to schedule 2 table 1 of the the tocality; and
[ Regulaven — the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No response is a localit' :
deemed approval, - ,
2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995. . .
: 2 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities". .
Page 15 :Section 23
INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 20, 2 April 2007. .:
Whether pajticular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a-
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the .
IP Regulation.
Assessment period 15 days. No response is a
deemed refusal. .
Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
IP Requlation. 18. An application may trigger referral to the focal government as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover,
deemed refusal, 19. An application may trigger referral to the local government as the concurrence agency if the building work
, does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
. Development Code, part 11 or 12.
Fire safety in paiticular budget 20. An application may trigger referral to the loca! government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of the been completed.
IP Regulation. , ‘
Assessment period 15 days. No response is a . :
deemed refusal.
Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work
For more information go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and
JP Regulation and the QDC part 15. * the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days. Noresponseisa -
deemed refusall, .
Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential
For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
IP Regulation and the QOC part 20, referral to the-local government as the concurrence agency.
Assessment period 15 days. No response is a .
deemed refusal.
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP-Regulation. .
, Assessment period 5 days. No response is a
deemed refusal.
Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the
designated rainwater tank area building work or structure complies with the relevant performance criteria if -
For more information go to schedule 2 table 1 of the ¢ Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
IP Regulation and the QOC pant 25. building work, in a designated rainwater tank area; and
Assessment period 15 days. No response is a e Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable
deemad refusal solution for a relevant performance criteria.
Page 16 :Section 24
NOTES
1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL 8E
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN
2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - “BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS
3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC
SUNSEEKER CLOSE
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
21432
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED 107°
OR RINGED
Ola
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM COMMON PROPERTY gia
NOTE: 00 NOT Fix 1300 1500 THE DRAWINGS 149 m2
JETTY TO WALL CONCRETE RETAINING WALL
ty
1545
PILES TO BE CLEAR OF STON \ 450:'x 75 AD PROPERTY JETTY USE 107°S1 gf a5
& - BOUNDARY PILE-IT PTY LTO
PITSHING AND ASSOCIATED — 6 SINGLE USER, PRIVATE TRADING AS
GEOTEXILE FABRIC
NO VEHICULAR ACCESS 1080 NOOSA JETFFY
107P°3s
DECKING BUILDERS
38 x 125 F14 HWO FIXED
f[O BEARERS WITH pf
Pecos eh - Licence No 723720
o
TWO S/S SCREWS RIS ABN 55 000 038 736
EACH END i 28 Sunest Drive PrFax 07 54554762
Noosa Heads Mobile 0406 137626
Qid 4567 0417 749644
PILES: MAXIMUM MOORED VESSEL - 5m LOT 1 LOT 2 NEILSON KILPATRICK
200 MIN TREATED ps BERTHING VELOCITY - 0.5 m/sec i 2?im2 PROPOSED
MWD POLES
SHARED JETTY
No.3
| ann
Ls] SUNSEEKER CLOSE
gs» OOSA WATERS
i PILES lap ms kar a RABRINK PTY LTD T/A
ALL PILES SHALL BE APPROVED HARDWOOD So 3
|| AND TREATED TO HAZARD 6. 1500 1500 > s John Norden
ALL PILES SHALL BE INSTALLED IN ACCORDANCE A A eo 2S & Associates
Lai
WITH AS 2159 - PILING CODE 6949 4 0 la
28S" 16" 7644 Lr T"N ACN 010 263 877
4 sé Structural / Civil Desiga Engineers
A Sute 16 Tewantn
Avenues / PO Box 206
4 Tewertin C 4565
d 1500 pv OF 54407137 Fax O07 54407172
WA \pnnorden ess0cQwisenods.on.net
23
—a
— 3
ht REAL PROPERTY
150 x 75 - DESCRIPTION
1500 LOTS 1&2 =a
GTP 4233
PARISH WEYBA
FRAMING LAYOUT SITE PLAN COUNTY MARCH *” WORKIN qi DRG
1:200 "o7/114-1 |Section 25
TO ONE SIDE (hats)
MAXIMUM RECORDED FLOOD LEVEL RL 2.00 AHD
mee ia ee we - remem ern ems rem ee ee ee ee”
TOP OF WALL TOP OF WALL
DECK RL 1.0 AND DECK a RL 1.0 AHD
ee ee eee RL 1.0 AHD MINIMUM WATER RL 0.44 AHD RL 1.0 AHD ees le KE
ee | ee
ee
CY
! STONE ITCHING
ee
CLC See ORACLE EEL | !
yy,
REX
| |
L is
| 1 ! |
| | |
|
U
|
ELEVATION 1 PILE-IT PTY LTD
& NOOSA JETTY
BUILDERS
ELEVATION 2
Licance No 723720
ABN 56 000 036 738
30 Prax 07 54564762
37526
NEILSON K
ILPATRICK
PROPOSED
SHARED JETTY
SCREWED TO BEARERS 180 x 76 HWO
No.3
2616 SIS
2M16 &/S SUNSEEKER CLOSE
NOOSA WATERS
75 x 38 HWO NOTE THAT ALL POLES TO COMPLY
175 x Nol4 TYPE 17 WITH AS 2158 - J PTY LTD T/A
STAINLESS STEEL 180 x 75 HWO John N
orden
& Associates
150 core st ALL POLES TO COMPLY pe Alle \ IN ACN 010 263 877
Structural / Covi Dasiga Engineers
Fix TO EACH PILE A, Suite 18 ‘Tewantin
2416 S/S BOLT Poncana Avenue
‘ —
Tewartin
Pn: 07 $4467137 Fe 07 54497172
johnnorden_ssecoGpingemode_on net
SECTION cA [neem (fag
MiEAuat, RPEQ.
wor
— P0742 |}Section 26
) LAND USE SECTION FEES |
NOOSA
: RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation §20 ;
Copy of Permit/Approval Letter 110
- The Noosa Plan Documentation 111 , :
APPLICATION FEES : | | |
. Material Change of Use - Code/Impact
Consistent 521
Inconsistent 521
, - Assessment under Superseded Planning Scheme ‘ 521
Modification to a Development Permit . §21
@ Extension of a Currency Period ‘ §21
Operationa! Works - Landscaping 521 .
Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW ~ : |
Half Hour §22
One Hour §22
ADVERTISING . .
Purchase Advertised Applications §23
. JETTIES ©
Jetty Application Fee ote, 350 524
’ Jetty Bond SOO «$1 ,
ce (Category 4)
BONDS a ,
Performance Bond ; 51
, . (Category 9) -
‘v ——
Registration Fee ; 222
SEARCHFEE oo
Search of Land Use Section file 112
. Liquor Licensing Request 113 . ; oo
a TOTAL. ¢ FRE FSO { oF 2
NAME: Kectrayol Meboe. : |
ADDRESS: CO Ac. < TH | es -
FILENO: — © b> DATE: § Olrloy
‘RECEIPT NO: S = 6 Signature of TP Officer:/(7> S.. Tee
AUTHORITY NO: . _ _
7 | Ie] 2009 [ruou| |Section 27
oe | CALCULATION OF FEES | |
APPLICATION (FEE TOTAL -
ae FEES
MCU - CODE ASSESSMENT oO
{Details of Development
Consistent 1.0°
Inconsistent 3.0
FEE CALCULATION -
MCU - IMPACT ASSESSMENT
Details of Development .
Consistent 1.0
Inconsistent 3.0 .
FEE CALCULATION | :
OPERATIONAL WORKS — —_
Details of Development So
FEE CALCULATION — OO
TOTAL FEES — $lSection 28
NOOSA , _ LAND USE SECTION FEES |
RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme’Documentation — §20
Copy of Permit/Approval Letter 110
. The Noosa Plan Documentation 111
APPLICATION FEES : . .
sO Material Change of Use - Code/Impact
Consistent ; 521
Inconsistent 521
- Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521 .
@ Extension of a Currency Period 521
Operationat Works - Landscaping 521 .
Bldg Work assessable against the Planning Scheme . §21
_ PRE LODGEMENT REVIEW .
, Half Hour §22
. One Hour §22
ADVERTISING
Purchase Advertised Applications §23
_ JETTIES ©
Jetty Application Fee FSO 524
' Jetty Bond . 51
SO oe (Category 4)
BONDS oe , -
Performance Bond ; 51
. (Category 9)
¢ ;
’ Registration Fee To, —_ 222
SEARCHFEE a :
Search of Land Use Section file 112
Liquor Licensing Request 113 oo
| —_ - TOTAL. $ PLO oor
NAME: te “ee P = oo :
ADDRESS: fo fox 295 — Oo i
FILENO: ©o7 ty DATE: J7/Tle7 . .
. i ss ” - / .
‘RECEIPT NO:: O x Signature of TP Officer: YS A M22 _
AUTHORITY NO: ; . _ of
I-4 [2027 | leo || : |Section 29
Se | CALCULATION OF FEES :
APPLICATION FEE TOTAL |
: | FEES
MCU - CODE ASSESSMENT } a .
Details of Development
Consistent 1.0 | |
Inconsistent 3.0
FEE CALCULATION | |
MCU - IMPACT ASSESSMENT
Details of Development
Consistent 1.0 .
Inconsistent 3.0
FEE CALCULATION | | 7
OPERATIONAL WORKS — —
Details of Development |
FEE CALCULATION |
TOTAL FEES _ $ , :Used in these records
0015D13F.001.pdfRelated documentPublic source context ↗
07/1404 - MCU - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.