Skip to the record
Beware of cheap imitations.

Council archive · source document

0015D13F.001

of 29

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                                  IDAS Assessment Checklist, Version 20, 2 April 2007 -
  Operational work that is tidal work or     |9,   The application involves operational work that is: ( tick the applicable box/es)
  work in coastal management district             (1) (i)   tidal work"® as defined under the Coastal Protection and Management Act 1995 (the
  For more information refer to Guide 8. For                                   :             :     .                                   ,
  more information about prescribed Bdal work in            Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or              ;
  local goverment lidal areas refer to Guide 24.  [J (ii)   tidal work that is prescribed tidal work" other than in a canal! -complete Part P of Form 1: Or
  Unless you answered “none of the above" to Q9,       vee      .         wpe                                    gs                                     :
 the application requires assessment by the       (1) (iii) carried out within a coastal management district under the Coastal Act and for - complete
  Environmental Protection Agency (EPA).                   Part M of Form 1 if any box/es (a} to (i) below are ticked.                   :
  If an agency other than EPA isthe assessment             [J (a)    constructing or installing works in a watercourse between MHWS and HAT (ie.
  manager for the application, sa                                                          eae                                                       :
 ‘concurrence agency for the appkcation i                            other than those works in tidal water) where the development has been determined not
  relation to this matter.                                           to be assessable against the Water Act 2000 ;
  Local governmentis the assessment manager                [_] (b)   constructing a canal12 intended to be connected to tidal waters:
  for all prescribed tidal work.                                                .         es
                                                           ["] (c)   constructing an artificial waterway;
                                                           [[} (d)   reclaiming land under tidal water;
                                                           CJ] (e)   disposing of dredge spoil or other solid waste material in tidal water;
                                                           (J (f) "interfering with quarry material on State coastal land above high-water mark;
                                                 :         [J] (g)   draining or allowing drainage or flow of water or other matter across State
                                                                     ‘coastal land above high-water mark;
                                                           [J (h)    removing or interfering with coastal dunes on land, other than State coastal “@
                                                                     that is in an erosion prone area and above high-water mark;
                                                           CJ (i)    constructing a bank or bund wall to establish a ponded pasture on land, other
                                                                     than State coastal land, above high-water mark; or
                                                       ¥)  none of the above.                                                                                   ;
 Operational work below high water           110. The application involves operational work that is: ( tick the applicable boxes)
  mak                       ,;                    (_] (i)  tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
 For more information refer to Guide 18. For                  :               4             :      :                                   ,
 more information about prescribed tidal work in           Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
 local goverment dal areas Oe  to Guide 24.         1] (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; or
 Unless you answered “none of the above" to            ses     .         wage                               ar
 Q10, the application triggers referral to        (1 (ii) carried out within a coastal management district'S under the Coastal Act and for -
 Queensland Transport (QT) (Maritime Safety                           ;     i                   j             i                iat in ti         _
 id) as a concurrence agency.                              [_] (a)   disposing of dredge spoil or other solid waste materiat in tidal water - complete Part
                 .                                                   M of Form 1;
 Loca! government is the assessment manager                                 i”                .
 for all prescribed tidal work,                            3 (b)     reclaiming land under tidal water - complete Part M of Form 1; or
       ;                                                   [1 (c)    constructing a canalt2, if the canal is associated with reconfiguring a lot -
                                                                     complete Part M of Form 1;                         :                                   /
                                                      (iv)  none of the above.
 Coastal management                         11.   The application involves: (tick the applicable box/es)                                                      @
 For more information refer to Guide 18.          (] (i)   -a material change of use assessable under a planning scheme involving operationa
 Unless you answered “none of the above" to                 work carried out completely or partly in a coastal management district's
 Q11, the application requires assessment by the | .   .              .                                                ;             _              a
 Environmental Protection Agency (EPA).           (J (ii)   a material change of use assessable under a planning scheme involving building
 If an agency other than EPA is the assessment              work, Carried out completely or partly in a coastal management district that is -
        t for the application, EPA is’                                      .                   .     .
conanence agency for the application in                     + the construction of a new premises with a GFA'6 of at least 1000m?
 relation to this matter.                                   e the enlargement of the GFA of existing premises by more than 1000m?
                                                  LJ (iii)  reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
                                                  Lo        completely or partly in a coastal management district
                                                  [1 (iv)   reconfiguring a lot” assessable under schedule 8 of the PA and in connection with
                                                            the construction of a canal12 - complete Part M of Form 1
                                                      (v)   none of the above       ~                                                                                  |

            LP                                                          ,                  .
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed bdal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995 ,
13 Tidal work is defined in sch 10 of the IPA.                                                                  ’
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes cerlain lida works completely or parly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coaslal management district under the Coastal Protection and Management Act 1995, other than an area declared as a~
   coastal management district under section 47(2) of that Act.                          -
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
   accompanied by the application for the operational works to construct the artificial waterway.                                          .
                                                                  ,               Page 4

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015D13F.001.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.