Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

0015D13F.001

of 29

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                                      IDAS Assessment Checklist, Version 20, 2 April 2007
  +          ‘                                                               <   =   .                                                  .
          Works that take overland flow water          {12. Does the application involve works that take overland flow water in a HPA or an FMA?
         The retevant wad river declaration wil state      :
         works that take overland flow water are either     [J No                    [1 YES (ensure you have completed Part Ks of Form 1)
          self assessable or assessable, of are exempt                                                                                                      .
          from wid river requirements,                 13.  If YES, is the application for works stated in the relevant wild river declaration to be?
          Hf you licked Q13 i), your appfication must be         .                                              :
 .        assessed by NRW against the Wild Rivers Code      O i) assessable works                              :                                                                 .
          and must comply with the code.                    [J ii) self-assessable works
          if you icked Q13 i} an application is not required     ee
          to be made however the works must comply with   [J iii) exempt works
          the relevant selfassessable section of the Wild
          Rivers Code, othenwise the works become
          assessable development for which an application
         is Fequired and must be assessed by NRW
          against the relevant part of the Wild Rivers Code :
          and must comply with the code.           ‘                                                                 ,
          If you ticked Q13 iil) your application is not
          Subject to wild river requirements.                                                                                                                                      '
          Applications for development thatis other than       .                                                                                      :
          that stated to be assessable, self-assessabie or                                            :
          exempt will not be accepted.                            :                                                                                           :
          Works that interfere with overland =| 14.         Does the application involve works that interfere with overland flow water in a FMA?
          flow water
@         The relevant wild siver declaration wil state     LINno                   LL] YES (ensure    you have     completed Pat Ki of Form 1
           ,                                                    N                                   re you have completed Part Kio of Form 1
          works that interfere with overland flow water that
          are either self assessable, assessable or exempt] 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
          from wild iver requirements.              jo      a .           sabl       k                                                      :
          If you ticked 015 i), your application must be        i) assessable works                                                                           :
 ;        assessed by NRW against the Wild Rivers Code      [1] ii) self-assessable works
          and must comply with the code.                        .                                                            a         .
          If you ticked Q15 ii) an application is not required LJ iil) exempt works
         to be made however the works must comply with
         the relevant self-assessable section of the Wild                                                                                                      .
         Rivers Code, otherwise the works become
         assessable development for which an application
         is required and must be assessed by NRW ~
         against the relevant part of the Wild Rivers Code                                                                        -
         and must comply with the code.                                                                                               .
         If you ticked Q15 iii} your application és not
         subject to wild river requirements.                                                                                    ;
         Applications for development that is other than
         that stated to be assessable, self-assessable or
         exempt will not be accepted.                                                                                 :                                        .               .
         Waterway barrier works                       16.  Does the application involve building or raising waterway barrier works in a PA?
         Applications for building or raising waterway                ‘                                                                                   ;
         barrier works in a HPA will not be accepted        ive                     (J YES (ensure you have completed Part Os of Form 1)
@        If you answered YES to Q16, your application
         must be assessed by DPIF against the Wild
         Rivers Code and must comply with the code.
         Aquaculture (non ERA)                       17.   Does the application involve aquaculture in‘a PA?
           eee      for aquaculture in a HPA will nol be   C] NO             :      Cj YES (ensure you have completed Part O: of Form 7)
         if you answered YES to Q17, your application
         must be assessed by DPIF against the Wild                                                                                                                        .
         Rivers Code and must comply with the cade.
         Works that interfere with water ina       | 18.   Does the application involve operational works that interfere with water in a watercourse that is in
        watercourse                                        a nominated waterway in a PA?
         Note: If the development is proposed in a HPA,
         applications for all works that interfere with water [JNO                 L_] YEs (ensure you have completed the relevant Part K of Form 1}
         in a watercourse (including dams or weirs,
  .      stream realignment or stream diversion) will not | 49 |f YES
         be accepted.                                             ‘
         In aPA, applications for instream dams and        (1 i) The application is for an instream dam or weir; or
         weirs may be accepted in nominated waterways.         +»                ge                .                  .            .          .                         .
         if you ticked box i) in Q419, your application wil CL] ii) The application is for operational works that interfere with water in a watercourse, and is
         not be accepted.                                          for development other than a dam or weir.
         Note: Operational works outside a HPA or                                                                         ;
         nominated waterway are not subject to wild
         Fiver requirements.                                                                                         :
         More information and locations of nominated
        waterways is available by contact NRW,
         accessing the department's website                                                          ‘
        www.ow.gid.gov.au or contacting the                                                          ;
        department by email on:                                                                                                                  .
       wild [email protected].

                            ‘                                                               Page 13                               :       ,

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015D13F.001.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.