Council archive · source document
0015D13F.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
| «
col < k
*
* | INTEGRATEO PLANNING ACT 1997 Part A, Version 2.4, 29 May
Land owner's consent {if appicable) 20. Land owner’s consent to the making of this application:
SE ee afte appara De Pp Name | Sionature | ate
Section 3.2.1(3) of the IPA prescribes that an
written consent of the land owner!s, if the appfication . AANA
involves: I 5-
() amatertal change of use; 9 ROR WIELSEN | a LDU. LN... 976-0)
(9 reconfiguration of a fot 7 .
7 makeioaon i a ees| | ST, MELEE | OMNI CC aepnw.....0:6.0T
7) work on land below high-water mark & not within a i ,
{4} work on rail corridor fand defined under the (iti) /]
Management Act 1995;0r . ---
Transport infrastructure Act 1994. noe e cee eee cee eee ee ee cece eeceeeeeees Pn wee eee cee eee ence ee beeen eee ee ee
Section 3,8.1(2}(a) of the IPA provides that .
landowner’s consent is not required for a mobilg or {iv)
For more information refer to Guide 1, (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1{5) of the IPA requires evidence of ‘
ent be glen for that ne on State coastal land under the Coastal Protection and Management Act 1995)?
involve a prescribed State resource. O - goto Q24 (] YES - go to 022
Section 3.2.1{10}(a)(@ of the IPA prescribes that . Lo, . .
application ‘cama be taken tbe propery made 22. This application is accompanied by evidence: (tick applicable box)
@ ve en ee 1 (i) of the allocation of, or entitlement to, the resource ~ attach evidence and go to Q23(v)
Refer to schedule 10 of the intograted Planning (J (ii) the chief executive of the department administering the resource is satisfied the
Regufation 1998 that prescribes the nature of evdenca i i ' i ,
rod by the State fn support ofthe lndging of ths development is consistent with an allocation of, or entitlement to, the resource ~ go
development apptication. . ; . oo. .
(_] (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to Q23
Adve foe completing 223 sndatory ttevdenoe 23. Evidence of the resource entitlement:
tear aes aS (nab ences (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water ls mandatory where the . applicable,
application involves any water or riverine quarry (ii) Name of delegated officer
stort Td
Section 3.2.1(5A4) atows the eaouce reer ee
the fime the eviden be used. ust be se i:
sat {the evidence fine Tilted (a) m (iii) Position of a officer
{iv) Ps of ~ officer
(v) Date
(vi) -_ date of evidence tees
Assessment triggers 24. We Checklist completed and attached to this application?
re titin oPoe hee Botine rom oni rs Ss (L] NO - the assessment manager may refuse to accept this appication on the
must be completed for all other applications, grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
scan auger nceaee Pan/Oraving/Repor Number | toate
the application during public scrutiny or public (i) OT WU—/ é4|sor) otrice | fy 07
manager, referral agencies and any person viewing . ° . .
oseromeaie 0 O7]/Ug A... \Naliea Enleeticl yer
notification to understand the scope of the proposal wae Ee a fe Re oe Loe wenn nnn enn han aa fon Denon nnn Pe Rp
(iii)
(iv)
a a
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
aa gg es
OFFICE USE ONLY (applicable to assessment manager's,
DATE RECEIVING OFFICER'S | ¢7 REFERENCE
FEW [Bee 3/40
Notification of Engagement of Private Certifier (Optionat form be
To, Council. | have been engaged as the private certifier for the building work referred to in this application.
Dateofengagement / / AccreditationNumber_ Name Signature;See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015D13F.001.pdfRelated documentPublic source context ↗
07/1404 - MCU - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.