Council archive · source document
0015D13F.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
7 4 . 7
fo. «
INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
; Form 1 Development Application idas
Operational &/or building work '3
assessable against a local government’s planning scheme aC
. ; *
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time).
Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against ~ [[] Building work assessable against a planning scheme - provide details of the aspects of building
a planning scheme are determined by the work (e.g. building height greater than 8.5m; building work on high landslip risk area)
scheme for a particular local goverment and
willvary across ihe State cnt tlian GUE
To determine the types of work that are Operational work assessable against a planning scheme - provide details of the nature of the
assessable under a particular planning operational work (e.g. roadworks; fandscaping; drainage works; stormwater; water infrastructure; sewerage
scheme, contact the relevantlocal infrastructure; earthworks; clearing vegetation; signage) ;
Theifoma NAS Timber fey.
. The information in Q2 is necessary for pe fy pe Li
(/
statistical and planning purposes. 2. Is the application for operational work invol¥ing the creation of new lots?
io ‘CO YES - specify number of new lots to be created below
3. Does the proposal involve the construction of a canal that is associated with reconfiguring a lot?
meno Ol yves
‘Nature of the application _ 4. This application is for: (tick one (1) or both if applicable)
A development PA en - {_] Pretiminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
development to offur, ghile gpraliminary infrastructure. etc .
approval is.a‘glap-trthe-ahipfoyal process *
te ae a ok cca ett patting ETT
nm R Eo Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
@ Q E { VE D infrastructure, etc ‘
13 guy ‘mba Jéefy-. ,
te 2007 SY . _
Nos, Stipe co 5. Are the works subsequent to a previous development permit or preliminary approval?
c FRON TCounre Ch Rao [] YES - provide details of all previous approvals
‘ MY
<-
\ %
Portable Long Service Leave levy (if |6. ls payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) ; . C) YES - complete Q7
Prior to issuing a development permit for the
works, the assessment manager is required O ~ 07, 8 & 9 do not apply
by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSL levy |7. Has the PLSL levy been paid? .
has been paid. . oO YES ~ complete 08
For further information refer to
hito:/Amww.gleave.qld.gov.au (_] NO - the appticabie levy must be paid before a development permit can be given for the works
8. How much was paid?
'|9. Whats the receipt number of the payment?See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015D13F.001.pdfRelated documentPublic source context ↗
07/1404 - MCU - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.