09/1512 - MCU - Transport Type 2 - Carpark [As Published]
INTEGRATED PLANNING ACT 1997
Part D, Version 3.2
[Mandatory Information
6. Confirm that the following mandatory information accompanies this application:
Confirmation of =f . '
lodgement L Method of lodgement
For all‘applications
(i) Plans showing the nature and location of the proposed use on the premises and a statement about the
intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, ] Confirmed over the counter
number of seats, capacity of storage area)
Wher the application involves.reuse: of existing buildings
{ii) Plans showing the size and location of the buildings to be reused C Confirmed
{x} Not applicabte
|When.the application invatves new buildingiwork.
{iii) Plans showing the size and location of the proposed new building work oO Confirmed
BX] Not applicable
When the application.involves.reuse af other existing works ~ : :
(iv) Plans showing the nature and location of the works to be reused C Confirmed
KX] Not applicable
fiéw operational’work”
(v) Plans showing the nature and location of the proposed new operational works [x] Confirmed
= over the counter
[]__ Not applicable
OFFICE USE ONLY
Date received Reference numbers
Advice for completing Part D
General advice
. Part A must also be completed for all IDAS development applications.
. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to
another question.
° When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the
Electronic Funds Transfer (EFT) payment notification to this application.
process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form
development to occur - a subsequent application for a development permit must be sought.
Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
Table Dif the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the
operational work if approval for the operational work has not been applied for in this application or in a separate application.
) This form is atso used for material change of use assessable against the land use plan for Cairns airport land or Mackay airport land. Wherever planning scheme is
mentioned, take it to mean the land use plan for the airport land.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.