Skip to the record
Accept no substitutions.

Original source · versioned page text

09/1512 - MCU - Transport Type 2 - Carpark [As Published]

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997

7

IDAS Assessment Checklist, Version 22

        
   

THERITAGE ]
141A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
No-Goto118  [_] Yes

JPA, schedule 8, part 1, table 5, ilem 2: IP Reguialion; schedute 2. rable 2. tte 18.

 

1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?

[xX] No-Gotoon2 [[] Yes
IPA, schedute 8, part 1. table 5, item 2A, [P Regulation, schsdute 1, part 2, table 5, item 2.

 

 

[REMOVING QUARRY MATERIAL; WILD RIVER AREA «:.

   

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
DX] No-Gotoai3 ([] Yes

IPA, schedule 8, part 1, table 5, tem 1; P Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, tem 2 (wild river area): Water Act 2000,
section 966C, Wild Rivers Act 2008, section 43A

 

 

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA |
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

No-Gotogt4 [_] Yes

IPA, schedule 8, part 1. table 2. Item t; IP:

    

schedite 8, part 1, fauie §, dems 3 and 4, iP Regulation, schedule 2, table 2, lems 1 and 23; Environmentat Protection Act 1894. section

 

      

 

 

 

 

T3AA (wild river area). Wild Rivers Act . Section 43A, relevant wild river declaration: Wid Rivers Cade,
‘WITHIN THE LIMITS OF A PORT § : 3 _ a |
1.4 ‘Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
BX} No - Goto 01.5
() Yes
JP Regulation, schedule 2, table 2, iteiis 15 and 16
[DECLARED FISH HABITAT AREA : . |
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

[X] No - Go to 91.6 .

oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Reguiation, schedule 2, table 2. item 26

 

       

 

 

 

[COMMUNITY INFRASTRUCTURE ee * 4
1.6 Is any part of the premises designated for community infrastructure?

[XJ No -Goto.01,7

7] Yes

IP Reguiation. schedule 2, table 3, fen 7
{WASTE WATER MANAGEMENT |
17 Does the proposal involve the establishment or expansion of a waste water disposal system?

No - End of Section 1 [_] Yes ,
{P Regulation. schedule 2, table 3, item 5
Log in to download the original file

09_1512 - MCU - Transport Type 2 - Carpark [As Published].pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.