Post Activity Certificati
UXO Search & Remediation Milsearch

255 David Low Way, Peregian Beach. Lot 95/SP137431

 

¢ All equipment was tested and calibrated prior to the commencement of data gathering to
ensure it operated within the Original Manufacturers Specifications (OEM); and

e All equipment was tested during, and at the end of the day to ensure at all times, it
performed within the manufacturers specifications.

The following documentation, in support of Milsearch Pty Ltd QC procedures, is attached to this
Report;

¢ Search Equipment Daily Test Log is presented at appendix C.

5.2. QUALITY ASSURANCE

As part of the Milsearch Standard Operating procedures (SOPs), Quality was ensured by a formal
and documented QC program. These procedures ensure that a planned and systematic pattern of
all actions necessary to provide adequate confidence that management and technical planning and
controls have been adhered to ensuring;

© Ongoing supervision and QC checking revealed no faults in operator performance; and

e Asaminimum, the Project Manager carried out a 10% QC check of the entire Site. On this
particular site 3 lanes were searched in a north / south direction at an even spacing along
the site using the Foerster 4032, (approx 10 meters apart). As an added check a random
pattern was searched over the entire site using an F3 Minelab. There were nil significant
items found.

6.0 CONCLUSIONS

_ The Site, as identified by the Property Titie at Appendix E, has been subjected to a disciplined
100% UXO search and remediation. There were no significant finds and no items of Explosive
Ordnance Waste (EOW) were found. There were some areas within the site that were unable to be
searched however a significant part of the site was searched with no evidence of military activity
found.

It is obvious that there have been past works carried out on this site. There is a large underground
sewer (c/w 2 x manholes), that runs the length of the site. Also neighbouring construction would
have meant large earthworks have been carried out at the southern end of this site. The top level
of ground consists mainly of imported gravel and road base and the site has been used as a car
park for several years (plus). :

In view of the competence of the operator, the capabilities of the equipment, the results of regular
equipment testing and the outcomes of QC checks, it is considered that the methodology applied
to conduct the UXO search and remediation within this Site was appropriate and that a confidence
level approaching 100% has been achieved.

It is therefore the professional opinion of Milsearch Pty Ltd that to the best of our knowledge and
belief, within the limitations of the equipment, the Site is free of any remnant UXO.

 

@ Milsearch Pty Ltd
Project Reference: MiiS QLD 10909

 

 
Log in to download the original file

09_1512 - MCU - Transport Type 2 - Carpark [As Published].pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.