Original source · versioned page text
09/1512 - MCU - Transport Type 2 - Carpark [As Published]
Post Activity Certificati UXO Search & Remediation Milsearch 255 David Low Way, Peregian Beach. Lot 95/SP137431 ¢ All equipment was tested and calibrated prior to the commencement of data gathering to ensure it operated within the Original Manufacturers Specifications (OEM); and e All equipment was tested during, and at the end of the day to ensure at all times, it performed within the manufacturers specifications. The following documentation, in support of Milsearch Pty Ltd QC procedures, is attached to this Report; ¢ Search Equipment Daily Test Log is presented at appendix C. 5.2. QUALITY ASSURANCE As part of the Milsearch Standard Operating procedures (SOPs), Quality was ensured by a formal and documented QC program. These procedures ensure that a planned and systematic pattern of all actions necessary to provide adequate confidence that management and technical planning and controls have been adhered to ensuring; © Ongoing supervision and QC checking revealed no faults in operator performance; and e Asaminimum, the Project Manager carried out a 10% QC check of the entire Site. On this particular site 3 lanes were searched in a north / south direction at an even spacing along the site using the Foerster 4032, (approx 10 meters apart). As an added check a random pattern was searched over the entire site using an F3 Minelab. There were nil significant items found. 6.0 CONCLUSIONS _ The Site, as identified by the Property Titie at Appendix E, has been subjected to a disciplined 100% UXO search and remediation. There were no significant finds and no items of Explosive Ordnance Waste (EOW) were found. There were some areas within the site that were unable to be searched however a significant part of the site was searched with no evidence of military activity found. It is obvious that there have been past works carried out on this site. There is a large underground sewer (c/w 2 x manholes), that runs the length of the site. Also neighbouring construction would have meant large earthworks have been carried out at the southern end of this site. The top level of ground consists mainly of imported gravel and road base and the site has been used as a car park for several years (plus). : In view of the competence of the operator, the capabilities of the equipment, the results of regular equipment testing and the outcomes of QC checks, it is considered that the methodology applied to conduct the UXO search and remediation within this Site was appropriate and that a confidence level approaching 100% has been achieved. It is therefore the professional opinion of Milsearch Pty Ltd that to the best of our knowledge and belief, within the limitations of the equipment, the Site is free of any remnant UXO. @ Milsearch Pty Ltd Project Reference: MiiS QLD 10909
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.