Council archive · source document
07/1173 - Notice - Change to existing approvaland concurrence agency aresponse [As Published] · 142007.1173.02
ecoaccess environmental licences and permits Notice Change to an existing approval Description of the change is to replace drawing plan number 4616-D01, Revision B, titled ‘Proposed Pontoon Site Plan and General Arrangement’ prepared by Superior Jetties, dated 3 September 2008 and approved by Stephen R. Belyea RPEQ 6204 with drawing plan reference no. 0808S, Site Plan 1, titled ‘Proposed additions & renovations to existing timber framed sheet roof boat shed & wharf, prepared by Adrian Baker Computer Drafting, dated 22 April 2009, sheet 7 of 7. It is noted a new ‘Resource entitlement’ has been granted for this development and is dated 19 May 2009. 2. Reason for the refusal: ¢ Integrated Planning Act.1997 Chapter 3, Part 5 Decision Stage Section 3.5.24: Request to change development approval (other than a change of a condition) The requested change to .the existing development approval would trigger a material change of use and-the need for assessable‘ development given ‘the intensity or scale of use of the premises due to the proposed change to the jetty design layout. The previously approved condition dated 29 September 2008 stated — “Condition 1. The works must be undertaken in accordance with the plans listed below’ (note. sixteen plans are listed in the original approval). This request contains only one plan (Site Plan (1) containing limited information. The proposed change to the development approval involves a completely new design, layout and infrastructure that differs considerably from the originally approved plans and therefore the following information would be required for assessment purposes: ¢ DERM requires the applicant to provide approved plans from a Registered Professional Engineer of Queensland (RPEQ) to a reasonable scale, clearly showing the details and dimensions of the new Structure and supporting infrastructure similar to the previous approval. ¢ DERM requires the applicant to demonstrate that the proposed changes will not adversely impact on natural coastal, riverine and estuarine processes. In particular, erosion and accretion and wave action on the bed and banks of the river due to the increased intensity of use. e« DERM requires the applicant to provide information of any potential impacts on surrounding waters from the construction and the change of jetty design layout, particularly with the increased jetty area access and boat movements, with regards to turbidity at the site. An attached extract from the Integrated Planning Act 1997 detaits your appeal rights regarding this decision. Should ‘you require any further information please contact Rodney Garner the project manager, on the telephone number listed below. Yours sincerely Enquiries: ES - Reg Serv - Bne North - Sunshine Coast - Ben Sale DERM Delegate PO Box 168 COTTON TREE QLD 4558 Department of Environment and Resource Management Phone: (07) 5459 6132 22-JUL-2009 Fax: (07) 5443 9927 Page 2 of 6 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1173 - Notice - Change to existing approvaland concurrence agency aresponse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 406 KB (small file)
- File type
No other editions are linked here.