Original source · versioned page text
CSI14096#2LakewayDriveCooroibah-Rev1 AES Final
CSI sou resrne —
What are you Building on? and manufacturer's specification for specific
details.
NOTE!!
THE INSTALLER OF THE AES SYSTEM MUST
BE CERTIFIED, TRAINED & COMPETENT AT
AES INSTALLATIONS.
AES SYSTEM MUST RUN PARALEL WITH THE
CONTOUR OF THE LAND. INSTALLER TO MAKE
ADJUSTMENTS IN LOCATION TO ENSURE
COMPLIANCE WITH THIS REQUIREMENT & THE
AES INSTALLATION MANUAL & AES SITE
INSTRUCTIONS AVAILABLE FROM THEIR
WEBSITE. BASE OF SYSTEM IS TO BE
FLAT/LEVEL.
IF DOUBT EXISTS CONTACT AES DIRECTLY
BEFORE DOING WORK.
Q100 flood level 29
Proposed NEW
with pump well
TANK — RL 3.5
<=). RESIDENCE
FFL 5.00 |;
on area diagram
cat
Land app
30 20 10 0
PO LSU
. . Scale 1:1000
CSI: 14096 #2 Lakeway Drive, Cooroibah A4 Plan Issue B
Creabian p/l atf...abn 17108178312 ...PO Box 1128, BUDDINA Q 4575
1300 762 240, 0418 708 636 / 07 5493 5966. [email protected] www.csisoiltesting.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.