Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Development Permit part 1 of 1 · OPW12/0412

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   111111              Integrated Development Assessment System form



Building or operational work assessable against
a planning scheme-IDAS form 6
(SustainablePlanningAct 2009 version 1.0 effective 18 December 2009)


This form must be completed for development applications for building works or

planning scheme.
                                                                                       ().
You MUST complete ALL questions unless the form indicates otherwise. Inc. mplete          f~M~     for   without all necessary

information and documentation will result in your application not being a       roperly made
                                                                                               ap6fJt?9_r’
For all development applications, you must:
                                                                                                  ’6>1)1C
                                                                                                1()
.     complete Application details-IDAS form 1                                                 Ot/’      O{/I}~$~
.     complete any other forms relevant to your application                               r&Vk .
                                                                                                   .tc?~
.     provide any mandatory supporting information identified on the forms as being 6,           e(j,~accompany your

      application.                                                                                   ’I)
                                                                                                                ..



Attach extra pages if there is insufficient space on this form.


All terms used on this form have the meaning given in the Sustainable PlanningAct 2009 or the Sustaina

Regulation 2009.

This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.


This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au


1. What is the nature of the work that        requires assessment against a planning scheme? (tick applicable boxjes)


D      building work-complete table A             G"     operational work-complete table B


Table A

    What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,

    underpinning, moving or demolishing a building)?




    What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
    attachment to this form to detail each approval request)


    D      development permit                   D preliminary approval
    Are there any current approvals associated with this application? (e.g. material change of use)

    List of approval referencejs                                          Date approved            Date approvallapses

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Permit part 1 of 1.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.