Skip to the record
For the highest quality transcripts.

Council archive · source document

IDASForm1-TreeRemoval-030413 · OPW13/0269

Attached to the e-mail Development Application for permit to damage vegetation - OPW13/0269.

of 8

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

IDAS form 1—Application details

(Sustainable Planning Act 2009 version 2.0 effective 17 December 2012)

This form must be used for ALL development applications.

You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.

For all development applications, you must:
e complete this form (IDAS form 1—Application details)
e complete any other forms relevant to your application

e provide any mandatory supporting information identified on the forms as being required to accompany your
application.

Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

| This form and any other IDAS form relevant to your application must be used for development applications relating to

strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land

_ use plan for the strategic port land, Brisbane core port land or airport land.

PLEASE NOTE: This form is not required to accompany requests for compliance assessment.

 

This form can also be completed online using eDA at www.smarteda.qld.gov.au

 

 

Mandatory requirements

 

 

 

Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
to the applicant.)

 

 

 

 

 

 

Name/s (individual or company name in full) NooSA DISTRICT BODY CokPoRATE MANAGEMENT
For companies, contact name Lew WHELLER
Postal address PO Box 38S

 

 

 

Suburb NOOSA HEADS

 

 

 

State QLD Postcode 4S6T

 

Country (if other than Australia)

 

 

 

Contact phone number oT 5473 S620

 

 

 

Mobile number (non-mandatory requirement)

 

 
Full text of the other 7 pages

Page 2

 

Fax number (non-mandatory requirement) O7 5473 STll

 

 

e-mail address (non-mandatory requirement) info

Applicant’s reference number (non-mandatory
requirement)

 

@ noosabem. tom. au

 

 

 

 

 

1. What is the nature of the development proposed and what type of approval is being sought?

 

 

Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.)

 

a)

What is the nature of the development? (Please only tick one box.)

C] Material change of use CJ Reconfiguring a lot CL Building work VJ Operational work

What is the approval type? (Please only tick one box.)

C] Preliminary approval Cl Preliminary approval Mw Development
under s241 of SPA under s241 and s242 permit
of SPA

Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)

 

 

REMOVAL OF TREE

 

 

What is the level of assessment? (Please only tick one box.)

CL Impact assessment | Code assessment

 

 

Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C—Additional
aspects of the application.)

 

 

a)

qd)

What is the nature of development? (Please only tick one box.)

EI Material change of use CL Reconfiguring a lot LC] Building work im Operational work

What is the approval type? (Please only tick one box.)

C Preliminary approval CL Preliminary approval CL Development
under s241 of SPA under s241 and s242 permit
of SPA

Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)

 

 

 

 

Whatis the level of assessment?

LJ Impact assessment LC] Code assessment

 

 

 

Page 3

 

Table C—Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)

 

| Refer attached schedule LJ Not required

 

 

 

2. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

wy No—continue to question 3

C Yes—complete Table D and then go to question 6

 

Table D—name of each local government area in which the mobile and temporary ERA is proposed to operate

 

 

 

3. Location of the premises (Complete Table E and/or Table F as applicable. Identify each lot in a separate row.)

 

 

Table E—street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises. (Note: this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)

 

rs Street address and lot on plan (All lots must be listed.)

O Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed)

 

 

 

 

 

Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/ locality name code and plan no.
i) -_ | 5t2 [David low wAY, 4573 | = SFP INI7Z) | SUNSHINE COAST.
it) MARCUS BEACH
iii)

 

 

 

 

 

 

 

Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory.)

 

Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s

 

 

 

 

 

 

 

 

 

3 IDAS form 1—App!
Version 2.0 17 Dec

ion details
aber 2012

 
 

 

 

Page 4

 

Table F—premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)

 

 

 

Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate row.) reference area (if applicable)
Easting Northing Latitude Longitude

[] epag4

[-] wese4

LE] other

 

 

 

 

 

 

 

 

4. Total area of the premises on which the development is proposed (indicate square metres)

 

 

ONE DEAD BANKSIA TREE

 

5. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.)

 

 

GATED COMMUNITY

 

 

6. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non-
mandatory requirement.)

 

[] No [-] Yes—provide details below

 

List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)

 

 

 

 

 

 

7. ls owner’s consent required for this application? (Refer to notes at the end of this form for more information.)

 

 

[M No

| Yes—complete either Table G, Table H or Table | as applicable

 

Table G

 

Name of owner/s of the land

 

\/We, the above-mentioned owner/s of the land, consent to the making of this application.

 

Signature of owner/s of the land

 

Date

 

 

Table H

 

Name of owner/s of the land

 

 

C The owner's written consent is attached or will be provided separately to the assessment manager

 

 

Table |

 

 

Name of owner/s of the land

 

 

 

 

as

IDAS form 1—Application details
Version 2.0 17 December 2012

Page 5

 

LE] By making this application, |, the applicant, declare that the owner has given written consent to the making of the
application.

 

 

8. Does the application involve a State resource? (E.g. the application involves taking water or quarry material, or

interfering with the flow of water. Refer to the notes at the end of this form for more information) (Non-mandatory
requirement.)

 

 

mw No [_] Notidentified whether or ["] Yes—complete Table J
not the application
involves a State
resource

 

Table J

 

Nature of State-owned resource (if identified)

 

 

 

 

9. Identify if any of the following apply to the premises (Tick applicable box/es.)

 

Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table K
On strategic port land under the Transport Infrastructure Act 1994—complete Table L
In a tidal water area—complete Table M

On Brisbane core port land under the Transport Infrastructure Act 1994 (no table requires completion)

OOOOO

On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)

 

Table K

 

Name of water body, watercourse or aquifer

 

 

 

 

 

 

 

 

Table L

Lot on plan description for strategic port land Port authority for the lot

Table M

Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)

 

 

 

 

10. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water
etc.)

 

 

L] No LE] Yes—ensure the type, location and dimension of each easement is included in the plans submitted

 

| 11. Does the proposal include new building work or operational work on the premises? (Including any services.)

 

Ww No LE] Yes—ensure the nature, location and dimension of proposed works are included in plans submitted

 

IDAS form 1—Application details
Version 2.0 17 December 20

  

ho

 

 

Page 6

 

 

 

12. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the end
of this form for more information.)

 

[Mf No—gotoquestion14 [] Yes

 

13. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more
information.)

[Y]_ No

Yes—complete Table N and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form

 

 

 

Table N

Amount paid Date paid QLeave project number (6 digit number starting with A, B, E, L or P)
(dd/mm/yy)

 

 

 

 

 

 

14. Has the local government agreed to apply a superseded planning scheme to this application under section
96 of the Sustainable Planning Act 2009?

[Mf No

| Yes—please provide details below

 

 

 

Name of local government Date of written notice given | Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)

 

 

 

 

 

15. List below all of the forms and supporting information that accompany this application (Include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA.)

 

 

Description of attachment or title of attachment Method of lodgement to
assessment manager

 

IiDAS FORM b

 

 

 

 

 

 

 

16. Applicant’s declaration S|

 

my By making this application, | declare that all information in this application is true and correct (Note: it is unlawful to
provide false or misleading information.)

 

 

 

 

 
 
 

6 IDAS form 1—Apr
Version 2.0 17 De

Page 7

Notes for completing this form

e Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the
Sustainable Planning Act 2009.

Question 7

e Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

e Owner's consent is not required for a mobile and temporary ERA.

Question 8
e If adevelopment application involves a State resource, the application is not required to be supported by evidence

of resource entitlement. The allocation or entitlement to the resource is a separate process and should be obtained
prior to development commencing.

Question 12

e The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.

e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 13

e The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

e Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au. For
further information contact QLeave on 1800 803 481 or visit www.qleave.qid.gov.au.

Privacy—the information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP), assessment manager, referral agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the
IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

To Council. | have been engaged as the private certifier for the
building work referred to in this application

 

 

 

 

 

BSA Certification license Building

Date of engagement |Name number classification/s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)

 

Description of the work QLeave project Amount paid Date paid | Date receipted |Name of officer who

 

 

 

 

 

 

 

 

 

£ IDAS form 1—Application details
Version 2.0 17 Decem

 

Page 8

 

number ($) form sighted by |sighted the form
assessment
manager

 

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agencies.

 

8 IDAS form 1—

Version 2.0 17

  

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

IDASForm1-TreeRemoval-030413.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.