NOOSA COUNCIL IDAS Development Application Decision Notice 17 of 51
68.9. aquatic ecosystems protection;
68.10. on-site vehicle storage and machinery maintenance;
68.11. storage and handling of dangerous goods on site;
68.12. bushfire prevention and control in accordance with the Fire Management Plan;
68.13. weed and pest control;
68.14. water quality protection;
68.15. waste management;
68.16. prevention of spills and emergency response;
68.17. visual amenity protection;
68.18. monitoring requirements;
68.19. identification of incidents and failures;
68.20. corrective action and contingency measures;
68.21. audit and review.
Approval
69. The EMP shall be submitted for approval to Council in conjunction with an application for Operational
Works for the Site.
70. The Developer shall not commence any development on Site until the EMP is approved by the Manager –
Land Use. The approval of the Manager – Land Use is not to be unreasonably withheld.
71. The Developer may amend the construction management plan only with the prior written approval of the
Manager – Land Use, which is not to be unreasonably withheld.
Implementation
72. The Developer shall comply with the EMP and compliance with the EMP shall be addressed by the
community management statement of any or all bodies corporate having control of any part of the Site.
Revision
73. The Developer may amend the EMP only with the prior written approval of the Manager – Land Use,
which is not to be unreasonably withheld.
Site Rehabilitation Plan
74. The Site Rehabilitation Plan Rev. 1 dated 11.7.2003 shall be complied with for the provisions that relate to
Lot 106 on SP151408.
Flora and Fauna Protection
Vegetation Protection
75. No vegetation indigenous to the Site or vegetation within the road reserves adjoining the Site shall be cut
down, lopped, damaged, disrupted or adversely affected without the prior written consent of the Manager
– Land Use. However the vegetation identified in the approved plans for removal may be removed or
lopped following the issue of a development permit for operational works for each area and in conjunction
with the operational works.
76. It may be acceptable to the Council for further vegetation to be removed or lopped on the site or
overhanging the site for safety reasons. For this purpose, a joint site visit shall be undertaken by the
Manager – Land Use and the Developer to identify any such vegetation to be removed or lopped. The
Developer may remove or lop additional trees only with the prior written consent of the Manager – Land
Use subject to such reasonable conditions as may be imposed by the Manager – Land Use.
77. All areas of vegetation and individual trees to be removed or lopped shall be clearly marked on the Site.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d811b33e\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2006.00000823.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.