NOOSA COUNCIL IDAS Development Application Decision Notice 22 of 51
Freshwater Habitat Feature and Environs
129. The freshwater habitat pond shall be specifically vegetated and managed to provide habitat for frogs,
aquatic birds and other native fauna. It will have a subsidiary role as a polishing pond but will not be used
for primary stormwater treatment for the Site.
130. The Developer shall prepare and implement the Freshwater Habitat Management Plan which shall include
the following details:
130.1. operational details;
130.2. rehabilitation details for both the pond and surrounding vegetation;
130.3. weed control and mosquito control procedures;
130.4. protection of the downstream creek environment;
130.5. water quality standards and required monitoring during the resort site construction and operation
stages;
130.6. performance standards that will identify when the new habitat area is functional as an aquatic
habitat;
130.7. maintenance and de-silting requirements and procedures; and
130.8. how public access and public safety issues will be addressed.
Buffer Areas
131. The following buffer areas are required to protect the Environmental Values of the Site:
131.1. a 10m wide buffer area on both sides of the intermittent creek (measured horizontally from the
centre line of the creek);
131.2. 75m radius buffer area (delineated by appropriate signage) around known Red-tailed Black
Cockatoo feed and nesting trees during construction;
131.3. the Cryptocarya foetida plants in the intermittent creek;
132. Unless specifically shown on the Drawings or specified in these Conditions, no construction works or
associated activities shall be permitted in these areas.
133. During construction, all buffer areas shall be clearly identified and delineated on the ground in accordance
with these Conditions.
Landscape Management Report
Preparation
134. A Landscape Management Report shall be prepared for the site by an experienced landscape architect in
conjunction with a person holding appropriate horticultural qualifications. The Landscape Management
Report shall be prepared to the reasonable satisfaction of the Manager – Land Use.
135. The following statements of principle apply to the preparation of the Landscape Management Report:
135.1. The Landscape Management Report shall demonstrate a high level of environmental care and
responsibility and be consistent with best practice for developments of this type in similar
environments.
135.2. The Landscape Management Report shall be based on sound ecological and environmental
principles and shall specify how the Environmental Values of the Site will be protected, maintained
and enhanced.
135.3. The Landscape Management Report shall specifically acknowledge and demonstrate how the
visual and aesthetic values of the Site and adjoining National Park will be maintained and
enhanced.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d811b33e\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2006.00000823.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.